Centennial building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Centennial, Colorado.
Verified 2026-07-03 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Centennial Civic Center, 13133 E. Arapahoe Rd., Centennial, CO 80112
- Phone
- 303-754-3321
- Office hours
- Monday - Tuesday: 8 a.m. - 5 p.m.; Wednesday: 9 a.m. - 5 p.m.; Thursday - Friday: 8 a.m. - 5 p.m. Workstations are available at the Building Division office for online portal use. 24-Hour Citizen Response Center: 303-325-8000.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour — verify forms, rebar, and foundation depth
- 2
Framing
Structural framing per approved plans and 2021 IRC
- 3
Drywall/Screw (fire-resistive and structural walls only)
Required for fire-resistive construction and structural walls; non-structural drywall does not require this inspection
- 4
Final
All work complete; required before Certificate of Occupancy (CO) is issued
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
All fixtures connected, no leaks, cleanouts accessible
Applies to: Residential Alteration / Addition / Remodel Permit
- 1
Footing/Foundation
Required before concrete pour for deck posts, garage foundations, or addition footings
- 2
Framing
Structural framing and connections to the existing structure
- 3
Final
All work complete per approved plans
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation/Framing/Rough-In
Standard building-permit inspection sequence applicable to the ADU's construction type (attached addition, detached structure, or interior conversion)
- 2
Final
Final inspection prior to Certificate of Occupancy; separate address must already be assigned
Applies to: Electrical Permit
- 1
Rough-In
Wiring and box placement before walls are closed (not required for One-Stop electric service change permits)
- 2
Final
Devices installed, panel labeled, protections verified per 2023 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
New circuit wiring, box placement, and panel connections before walls are closed, if applicable
- 2
Final
Charger unit installed, devices connected, panel labeled per the 2023 NEC as adopted
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and mechanical equipment rough-in before walls closed; gas piping pressure test before concealment (not required for One-Stop like-for-like replacements)
- 2
Final
Equipment operational; combustion air and clearances verified
Applies to: Re-Roofing Permit
- 1
Mid-Roof
Required for ALL reroofing permits (residential and commercial) before the roof covering fully conceals the underlayment/flashing; may be satisfied by in-person inspection, photo submission with waiver form, or a stamped engineer's letter if missed
- 2
Final
Completed roof verified against approved plans and manufacturer installation instructions
Final inspection only: Demolition Permit, Fence Permit, Solar Photovoltaic (PV) Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Centennial building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Centennial building permits
Get alerts for Centennial
We'll email you when Centennial's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.