City of Fountain building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in City of Fountain, Colorado.
Verified 2026-07-19 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Pikes Peak Regional Building Department, 2880 International Cr., Colorado Springs, CO 80910; City of Fountain Planning Department, 116 South Main Street, Fountain, CO 80817
- Phone
- PPRBD (719) 327-2880; City of Fountain Planning Department (719) 322-2000
- Office hours
- City of Fountain Planning Department: 8:00 AM - 5:00 PM, Monday-Friday, per the department's own webpage. PPRBD office hours not separately verified on pprbd.org as of 2026-07-19.
- Website
- Official site
Published scheduling rules
- Applicant must contact the City of Fountain Planning Division within 30 days of provisional approval to schedule a coop/location/height/setback inspection (Chicken/Hen Permit)
Inspection sequence
Applies to: Residential Building Permit (New Single-Family/Duplex Construction)
- 1
Building Footing/Foundation
PPRBD inspection codes BFT/BFN/BFD per the Required Inspections by Project list (pprbd.org/Permit/RequiredInspections).
- 2
Electrical Underground/Service/Rough
PPRBD inspection codes EUG/ES/ER.
- 3
Mechanical/Heating Rough
PPRBD inspection code HRR and related mechanical rough-in codes.
- 4
Plumbing Base/Top Out/Insulation
PPRBD inspection codes PB/PTO/PIN.
- 5
Building Final
PPRBD inspection code B= (Building Final), plus Electrical Final (E=), Heating Final (H=), and Plumbing Final (P=) prior to occupancy.
Applies to: Commercial Building Permit
- 1
Building Footing/Foundation
PPRBD inspection codes per the Required Inspections by Project list.
- 2
Trade Rough-Ins (Electrical/Mechanical/Plumbing)
PPRBD trade rough inspections prior to close-in.
- 3
Building Final
PPRBD final building and trade inspections prior to Certificate of Occupancy.
Applies to: Manufactured/Modular Home Installation Permit
- 1
Temporary Set Inspections
Per the Pikes Peak Regional Building Code; after final inspection PPRBD affixes the State of Colorado insignia serving as a residential Certificate of Occupancy.
- 1
Permanent Set — First Inspection (Soils/Foundation)
Soils report and foundation design by a Colorado-licensed architect or engineer required at first inspection.
- 2
Permanent Set — Final Inspection
Inspections check compliance with the Pikes Peak Regional Building Code and adopted codes and Colorado state regulations; the state-issued factory-built insignia is affixed after final inspection.
Applies to: Short Term Rental Permit
- 1
Pre-Issuance Inspection
An inspection is required prior to issuance of the short term rental permit; it is the property owner's responsibility to call for the inspection, per the application form.
- 2
Annual Renewal Inspection
Required annually prior to renewal of the one-year permit.
Applies to: Sign Permit
- 1
Initial Inspection (staking)
Applicant must stake the location of the property line, sign pole, and overhang location, then contact the Planning Department for an initial inspection, per the Sign Permit Application form.
- 2
Final Site Inspection
Applicant must contact the Planning Department upon completion of construction for a final site inspection, per the Sign Permit Application form.
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final — Structural / Racking and Electrical
Panel mounting, racking attachment, roof penetration sealing, and all electrical connections verified
Final inspection only: Chicken/Hen Permit, EV Charger / EVSE Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Fountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
City of Fountain building permits
Get alerts for City of Fountain
We'll email you when City of Fountain's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.