Manufactured/Modular Home Installation Permit — City of Fountain, Colorado · Requirements sheet
Verified 2026-07-19 · Source: https://www.pprbd.org/File/ByAlias/MFRResidential
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured/Modular Home Installation Permit in City of Fountain, Colorado
Required for installation of any HUD, UBC, or IRC manufactured/modular/mobile home on a site within Fountain, whether permanent or temporary set. Issued and inspected by PPRBD, categorized as 'new single family construction' with valuation-based fees. City of Fountain zoning site-plan approval is a prerequisite.
Verified 2026-07-19 · Source
When you need this permit
- Manufactured, modular, or mobile home installation (permanent or temporary set) within Fountain city limits
- City or County zoning site plan approval with legal description, obtained before PPRBD permit application
- Installer must hold a PPRBD Mechanical Contractor D License (temporary set) or Building Contractor C License (permanent set), and be registered with the State of Colorado
- Floodplain review and address enumeration
- Blocking and tie-down layout (manufacturer's instructions, Colorado-licensed engineer design, or Colorado Division of Housing-compliant foundation plans)
- Soils report and foundation design by a Colorado-licensed architect or engineer required at first inspection for permanent-set homes
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Temporary Set Inspections
Per the Pikes Peak Regional Building Code; after final inspection PPRBD affixes the State of Colorado insignia serving as a residential Certificate of Occupancy.
- 1
Permanent Set — First Inspection (Soils/Foundation)
Soils report and foundation design by a Colorado-licensed architect or engineer required at first inspection.
- 2
Permanent Set — Final Inspection
Inspections check compliance with the Pikes Peak Regional Building Code and adopted codes and Colorado state regulations; the state-issued factory-built insignia is affixed after final inspection.
See the full City of Fountain inspection guide — scheduling & re-inspection fees →
Tips
- Decks may only be attached to HUD manufactured homes if designed by a Colorado-licensed design professional, per PPRBD's Manufactured Residential Buildings guidance — detached decks over 32 sq ft require separate framing plans and permits regardless of home type.
- Confirm which installer license (Mechanical Contractor D for temporary set vs. Building Contractor C for permanent set) your installer holds with PPRBD before signing a contract.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Fountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Fountain
Manufactured/Modular Home Installation Permit in other cities
Compare manufactured/modular home installation permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your City of Fountain project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Fountain — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →