Manufactured Home / Modular Home / Park Model Permit in Parker, Arizona

Required for placement of manufactured homes, modular homes, and park model units in the Town of Parker. Billed as a flat per-unit-type fee distinct from the standard valuation-based Building fee table.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for placement of a manufactured home, modular home, or park model within Town of Parker limits
  • Each unit type (Manufactured Home, Modular Home, Park Model) is billed its own flat $300.00 permit fee under Schedule 7.4, distinct from the general valuation-based Building fee table used for site-built construction
  • Plan review fee for these unit types is 15% of the total permit fee, NOT the 65% rate that applies to standard Building and Grading permits
  • Manufactured homes are additionally subject to State of Arizona regulation (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for the factory-built unit itself; the Town's permit and fee cover placement, foundation/tie-down, and site improvements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Home PermitTown of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4
$300.00 per permit
Modular Home PermitTown of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4
$300.00 per permit
Park Model PermitTown of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4
$300.00 per permit
Plan Review Fee (Manufactured/Modular/Park Model)Town of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4
15% of total permit fee

Review timeline

Plan reviewParker’s published plan-review target
5–7 business days

How long did your Manufactured Home / Modular Home / Park Model Permit permit actually take in Parker?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Tie-Down

    Verifies hold-down anchors and foundation/blocking before utility connection

  2. 2

    Final

    Utility connections, skirting, and site improvements verified

See the full Parker inspection guide — scheduling & re-inspection fees →

Tips

  • Manufactured/Modular/Park Model permits use a flat $300 fee plus 15% plan review — a notably different (lower plan-review-percentage) structure than the 65% rate applied to standard Building and Grading permits.
  • This flat fee covers the Town's placement/site permit only; the factory-built unit's own construction standards are separately regulated at the state level by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing).

Frequently asked questions

Parker requires a manufactured home / modular home / park model permit for: Building permit required for placement of a manufactured home, modular home, or park model within Town of Parker limits; Each unit type (Manufactured Home, Modular Home, Park Model) is billed its own flat $300.00 permit fee under Schedule 7.4, distinct from the general valuation-based Building fee table used for site-built construction; Plan review fee for these unit types is 15% of the total permit fee, NOT the 65% rate that applies to standard Building and Grading permits; Manufactured homes are additionally subject to State of Arizona regulation (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for the factory-built unit itself; the Town's permit and fee cover placement, foundation/tie-down, and site improvements. If your project isn't listed, confirm with Town of Parker Community Development Department — Building Division at 928-669-9265 before starting work.

$300.00 flat per permit (whether Manufactured Home, Modular Home, or Park Model), plus a plan review fee of 15% of the total permit fee, per the Town of Parker Schedule of Fees and Rates, Schedule 7.4.

Parker's published plan-review target for a manufactured home / modular home / park model permit is 5–7 business days.

You'll need: Permit Application; Plot/Site Plan. See the required-documents checklist on this page for details on each.

Parker requires 2 inspection(s) for a manufactured home / modular home / park model permit, in order: Foundation/Tie-Down, Final. Schedule each through Town of Parker Community Development Department — Building Division (928-669-9265).

Apply through Town of Parker Community Development Department — Building Division at 1314 11th Street, Parker, AZ 85344. Phone: 928-669-9265, email: topbuilding@townofparkeraz.us. Office hours: Monday - Thursday, 7:00 a.m. - 6:00 p.m. (closed Fridays and holidays). Building/permit questions and inspection scheduling: 928-669-9265 ext. 1019 or topbuilding@townofparkeraz.us; Planning & Zoning: comdev@townofparkeraz.us; Fax 928-669-5247. Permit Applications are submitted directly to the Building Division (in person or by mailing/emailing the completed Permit Application form plus two sets of construction plans) — the Town does NOT use an online eTRAKiT/EnerGov self-service portal for AZ permitting (eTRAKiT and prkc-trk.aspgov.com belong to the unrelated Parker, COLORADO municipal government, parkerco.gov, and must not be confused with this jurisdiction).. Official information: https://www.townofparkeraz.com/page/community-development.

Parker, Arizona has adopted: Arizona has NO statewide mandatory building code for general construction — code adoption is a per-jurisdiction (town/city/county) authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Parker independently adopts and administers its own construction codes through its Community Development Department / Building Division; it does NOT defer to La Paz County for permitting within incorporated town limits. La Paz County separately runs its own Building and Safety Department for unincorporated areas of the county — the two are distinct code-administration regimes sharing the same 1112 Joshua Ave / Parker, AZ area but serving different jurisdictions. Source: Town of Parker Code of Ordinances, Title 9 (Building Regulations), Chapter 1 (Building Code), via American Legal Publishing code library (codelibrary.amlegal.com/codes/parkeraz); La Paz County 'Building, Safety & Permits' page (lapaz.gov/589).; International Building Code (IBC), 2018 edition, adopted by reference (Town of Parker Code of Ordinances § 9-1-1), including Appendices C, I, and J. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Residential Code (IRC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices A, B, C, D, G, H, K, N, O, P, Q, and S. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; National Electrical Code (NEC), 2017 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Mechanical Code (IMC), 2018 edition, adopted by reference (§ 9-1-1), including Appendix A. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Plumbing Code (IPC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices C and E. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Fire Code (IFC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices B through G and I; administered by the Colorado River Fire Department / Town Fire Marshal function for plan review (a $110 Fire Plan Review fee applies per the Town's Schedule of Fees and Rates, Schedule 7.3). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com); Town of Parker Schedule of Fees and Rates, effective 08/01/2025.; International Existing Building Code (IEBC), 2018 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Fuel Gas Code (IFGC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices A and B. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Property Maintenance Code, 2012 edition, adopted by reference (§ 9-1-1), including Appendix A. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Swimming Pool and Spa Code, 2018 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; Ordinance 02-2025 (effective 8-5-2025) restructured Title 9 by repealing the Town's previously separate per-trade code chapters (e.g., the standalone Chapter 2 Plumbing Code, confirmed repealed: '(Rep. by Ord. 02-2025, 8-5-2025)') and consolidating all ten adopted model codes into a single Chapter 1 (Building Code) adoption-by-reference section (§ 9-1-1), with local amendments carried in the companion § 9-1-2 (Technical Code Amendments). Source: Town of Parker Code of Ordinances, Title 9, Chapter 2 (repealed) and Chapter 1 §§ 9-1-1/9-1-2 (amlegal.com).; Manufactured homes, modular homes, and park models are subject to a Town of Parker building permit for placement (flat $300.00 fee per unit type, plus a 15% plan review fee), per the Town's Schedule of Fees and Rates, Schedule 7.4. Source: Town of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4.. Local amendments apply — see the Parker overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Parker building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.