Plumbing Permit — Parker, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://core-docs.s3.amazonaws.com/documents/asset/uploaded_file/4181/TOP/3442528/Permit_Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Parker, Arizona
Required for plumbing installation, alteration, or repair work (including gas line work) in the Town of Parker, governed by the 2018 International Plumbing Code (IPC) as adopted by the Town, following the repeal of the Town's formerly standalone Plumbing Code chapter by Ordinance 02-2025.
Verified 2026-07-06 · Source
When you need this permit
- Plumbing permit required for plumbing and gas line work, checked as 'Plumbing' on the Town's combined Permit Application
- Governed by the 2018 IPC (with Appendices C and E) as adopted by the Town of Parker (§ 9-1-1); the Town's formerly separate standalone Plumbing Code chapter (Title 9, Chapter 2) was repealed by Ordinance 02-2025, effective 8-5-2025, consolidating plumbing code adoption into the unified § 9-1-1
- Single-trade plumbing work up to $5,000 valuation is billed a flat Utility permit fee; work at $5,001 valuation or more is billed the full Building Permit Fee, Per Valuation (Schedule 7.8)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After pipes installed, before walls closed
- 2
Final
Fixtures connected, gas connections verified, no leaks
See the full Parker inspection guide — scheduling & re-inspection fees →
Tips
- Ordinance 02-2025 (effective 8-5-2025) repealed the Town's standalone Plumbing Code chapter (Title 9, Chapter 2) — the amlegal.com code library shows this chapter now reads only '(Rep. by Ord. 02-2025, 8-5-2025)' with no substantive text remaining; plumbing code adoption is now handled entirely within the consolidated § 9-1-1 (2018 IPC).
- The same $5,000 valuation fee-break applies here as for electrical: flat $50 utility fee below that threshold, full valuation-based Building Permit fee at or above it.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Parker building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Parker
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Parker project checklist
Describe your project once and get every permit, document, and fee it triggers in Parker — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →