Demolition Permit in Parker, Arizona

Required for demolition of structures in the Town of Parker. Billed as a flat per-structure fee for up to two structures on one parcel.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a structure within Town of Parker limits, checked as 'Demolition' on the Town's combined Permit Application
  • Fee covers demolition of up to two structures on one parcel; each additional structure beyond two adds $7.00
  • General demolition requirements follow the same Permit Application process (Plot/Site Plan, property/owner information) as other permit types

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition of up to two structures on one parcelTown of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.14 (Miscellaneous); additional structures beyond two add $7.00 per structure
$50.00

Review timeline

Plan reviewParker’s published plan-review target
5–7 business days

How long did your Demolition Permit permit actually take in Parker?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies site condition and completion of demolition, utilities terminated at the property line

See the full Parker inspection guide — scheduling & re-inspection fees →

Tips

  • The $50.00 base demolition fee covers up to TWO structures on a single parcel — a detail specific to Parker's fee schedule; most other AZ jurisdictions in this dataset bill demolition per single structure.
  • No demolition-specific review timeframe is separately published — the Town's general 5-7 working day processing time applies.

Frequently asked questions

Parker requires a demolition permit for: Building permit required before demolishing a structure within Town of Parker limits, checked as 'Demolition' on the Town's combined Permit Application; Fee covers demolition of up to two structures on one parcel; each additional structure beyond two adds $7.00; General demolition requirements follow the same Permit Application process (Plot/Site Plan, property/owner information) as other permit types. If your project isn't listed, confirm with Town of Parker Community Development Department — Building Division at 928-669-9265 before starting work.

$50.00 flat fee, which covers up to two structures on one parcel; each additional structure beyond two adds $7.00, per the Town of Parker Schedule of Fees and Rates, Schedule 7.14 (Miscellaneous).

Parker's published plan-review target for a demolition permit is 5–7 business days.

You'll need: Permit Application; Plot/Site Plan. See the required-documents checklist on this page for details on each.

Parker requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Town of Parker Community Development Department — Building Division (928-669-9265).

Apply through Town of Parker Community Development Department — Building Division at 1314 11th Street, Parker, AZ 85344. Phone: 928-669-9265, email: topbuilding@townofparkeraz.us. Office hours: Monday - Thursday, 7:00 a.m. - 6:00 p.m. (closed Fridays and holidays). Building/permit questions and inspection scheduling: 928-669-9265 ext. 1019 or topbuilding@townofparkeraz.us; Planning & Zoning: comdev@townofparkeraz.us; Fax 928-669-5247. Permit Applications are submitted directly to the Building Division (in person or by mailing/emailing the completed Permit Application form plus two sets of construction plans) — the Town does NOT use an online eTRAKiT/EnerGov self-service portal for AZ permitting (eTRAKiT and prkc-trk.aspgov.com belong to the unrelated Parker, COLORADO municipal government, parkerco.gov, and must not be confused with this jurisdiction).. Official information: https://www.townofparkeraz.com/page/community-development.

Parker, Arizona has adopted: Arizona has NO statewide mandatory building code for general construction — code adoption is a per-jurisdiction (town/city/county) authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Parker independently adopts and administers its own construction codes through its Community Development Department / Building Division; it does NOT defer to La Paz County for permitting within incorporated town limits. La Paz County separately runs its own Building and Safety Department for unincorporated areas of the county — the two are distinct code-administration regimes sharing the same 1112 Joshua Ave / Parker, AZ area but serving different jurisdictions. Source: Town of Parker Code of Ordinances, Title 9 (Building Regulations), Chapter 1 (Building Code), via American Legal Publishing code library (codelibrary.amlegal.com/codes/parkeraz); La Paz County 'Building, Safety & Permits' page (lapaz.gov/589).; International Building Code (IBC), 2018 edition, adopted by reference (Town of Parker Code of Ordinances § 9-1-1), including Appendices C, I, and J. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Residential Code (IRC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices A, B, C, D, G, H, K, N, O, P, Q, and S. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; National Electrical Code (NEC), 2017 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Mechanical Code (IMC), 2018 edition, adopted by reference (§ 9-1-1), including Appendix A. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Plumbing Code (IPC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices C and E. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Fire Code (IFC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices B through G and I; administered by the Colorado River Fire Department / Town Fire Marshal function for plan review (a $110 Fire Plan Review fee applies per the Town's Schedule of Fees and Rates, Schedule 7.3). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com); Town of Parker Schedule of Fees and Rates, effective 08/01/2025.; International Existing Building Code (IEBC), 2018 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Fuel Gas Code (IFGC), 2018 edition, adopted by reference (§ 9-1-1), including Appendices A and B. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Property Maintenance Code, 2012 edition, adopted by reference (§ 9-1-1), including Appendix A. Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; International Swimming Pool and Spa Code, 2018 edition, adopted by reference (§ 9-1-1). Source: Town of Parker Code of Ordinances § 9-1-1 (amlegal.com), as amended by Ordinance 02-2025, effective 8-5-2025.; Ordinance 02-2025 (effective 8-5-2025) restructured Title 9 by repealing the Town's previously separate per-trade code chapters (e.g., the standalone Chapter 2 Plumbing Code, confirmed repealed: '(Rep. by Ord. 02-2025, 8-5-2025)') and consolidating all ten adopted model codes into a single Chapter 1 (Building Code) adoption-by-reference section (§ 9-1-1), with local amendments carried in the companion § 9-1-2 (Technical Code Amendments). Source: Town of Parker Code of Ordinances, Title 9, Chapter 2 (repealed) and Chapter 1 §§ 9-1-1/9-1-2 (amlegal.com).; Manufactured homes, modular homes, and park models are subject to a Town of Parker building permit for placement (flat $300.00 fee per unit type, plus a 15% plan review fee), per the Town's Schedule of Fees and Rates, Schedule 7.4. Source: Town of Parker Schedule of Fees and Rates, effective 08/01/2025, Schedule 7.4.. Local amendments apply — see the Parker overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Parker building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.