Inspection sequence, scheduling, and re-inspection fees for building permits in Parker, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
1314 11th Street, Parker, AZ 85344
Phone
928-669-9265
Office hours
Monday - Thursday, 7:00 a.m. - 6:00 p.m. (closed Fridays and holidays). Building/permit questions and inspection scheduling: 928-669-9265 ext. 1019 or topbuilding@townofparkeraz.us; Planning & Zoning: comdev@townofparkeraz.us; Fax 928-669-5247. Permit Applications are submitted directly to the Building Division (in person or by mailing/emailing the completed Permit Application form plus two sets of construction plans) — the Town does NOT use an online eTRAKiT/EnerGov self-service portal for AZ permitting (eTRAKiT and prkc-trk.aspgov.com belong to the unrelated Parker, COLORADO municipal government, parkerco.gov, and must not be confused with this jurisdiction).

Inspection sequence

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/accessory structures

  2. 2

    Framing

    Structural connections to existing structure or new accessory structure framing

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Required before concrete pour

  2. 2

    Framing

    Structural framing, connections, and egress per 2018 IRC as adopted by the Town

  3. 3

    Final

    Completed work verified against approved plans prior to Certificate of Occupancy; inspections must be scheduled at least 24 hours in advance

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and panel labeled, per 2017 NEC as adopted by the Town

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Circuit wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    EVSE installed and panel labeled, per 2017 NEC as adopted by the Town

Applies to: Manufactured Home / Modular Home / Park Model Permit

  1. 1

    Foundation/Tie-Down

    Verifies hold-down anchors and foundation/blocking before utility connection

  2. 2

    Final

    Utility connections, skirting, and site improvements verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Plumbing Permit

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, gas connections verified, no leaks

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Final electrical/building inspection preceding sign-off

Applies to: Swimming Pool / Spa Permit

  1. 1

    Pre-Gunite/Pre-Plumbing

    Before shotcrete/gunite application and concealment of pool plumbing

  2. 2

    Final/Barrier

    Pool/spa barrier compliance verified per the 2018 International Swimming Pool and Spa Code as adopted by the Town

Final inspection only: Demolition Permit

Parker building permits