Sign Permit — City of Fountain, Colorado · Requirements sheet
Verified 2026-07-19 · Source: https://fountain.colorado.gov/sites/fountain/files/documents/Sign%20Permit%20Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in City of Fountain, Colorado
Required for installation of free-standing, low-profile, wall, awning/roof/projecting, or temporary signs within Fountain city limits. The City of Fountain Planning Department reviews and approves the sign/site plan for zoning compliance; the applicant must then separately contact PPRBD for the actual building permit to construct the sign.
Verified 2026-07-19 · Source
When you need this permit
- Sign installation, replacement, or modification within Fountain city limits
- Site plan showing setbacks from property lines and major intersections (measured from the sign overhang)
- Sign plan showing dimensions, height, and sign copy
- Storefront elevation drawing indicating placement (for wall/storefront signs)
- Valuation of materials (contract copy) submitted to the City Clerk's office for 2% use tax calculation
- After City Planning Department approval, a separate PPRBD building permit is required to construct the sign
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Initial Inspection (staking)
Applicant must stake the location of the property line, sign pole, and overhang location, then contact the Planning Department for an initial inspection, per the Sign Permit Application form.
- 2
Final Site Inspection
Applicant must contact the Planning Department upon completion of construction for a final site inspection, per the Sign Permit Application form.
See the full City of Fountain inspection guide — scheduling & re-inspection fees →
Tips
- The City of Fountain Sign Permit is a zoning approval only — it does NOT substitute for the building permit. The application form directs applicants, as step 4, to separately 'Contact the Pikes Peak Regional Building Department for a Building Permit.'
- Sign approval lapses after one year if the building permit is not pulled and the sign is not constructed within that time, per the application form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Fountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Fountain
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your City of Fountain project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Fountain — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →