Change of Use / Conditional or Special Use Permit (Table of Allowed Uses) in Town of Carbondale, Colorado
Carbondale has no standalone 'change of use permit' by that name — confirmed by a full-text search of the Town's own published Unified Development Code (UDC, Chapter 17 of the Municipal Code, Amended January 2025), which contains zero instances of the phrase 'change of use' anywhere in the document. A change limited to a commercial space's IBC occupancy classification for construction purposes (e.g., a tenant finish) is instead captured within the ordinary Town Building Permit process already documented in this file's commercial-remodel-tenant-finish-permit and new-commercial-building-permit entries. A genuine change to a NEW land use at the zoning level is governed by the UDC's Table 4.2-1 (Table of Allowed Uses), Chapter 17.04: each use is classified per zone district as Permitted ('P'), Conditional ('C'), Special ('S'), or prohibited (blank cell); moving into a 'C' or 'S' use requires a Conditional Use Permit (UDC Section 2.5.1) or Special Use Permit (UDC Section 2.5.2), respectively, both reviewed and decided by the Planning Director.
Reviewed 2026-08-13 · Source
When you need this permit
- No standalone change-of-use permit, application, checklist, or fee line was found anywhere on carbondalegov.org or in the full text of the UDC (Chapter 17, Amended January 2025) — the phrase 'change of use' does not appear anywhere in the UDC, checked directly via full-text search of the Town's own published UDC PDF; this is a genuinely confirmed gap after an active chase, not an unexamined assumption
- A change limited to a commercial space's IBC occupancy classification (e.g., retail converting to restaurant use) for construction purposes is instead captured within the ordinary Town Building Permit process — this file's own commercial-remodel-tenant-finish-permit entry already documents that new/remodeling restaurants must obtain Garfield County Public Health plan approval before a Town building permit is submitted
- A genuine change to a use not otherwise allowed by right in the applicable zone district is governed by UDC Table 4.2-1, Table of Allowed Uses (Chapter 17.04): each use is classified per zone district as 'P' (Permitted by right, subject to all other applicable regulations), 'C' (allowed only if reviewed and approved under UDC Section 2.5.1, Conditional Use Permit), 'S' (allowed only if reviewed and approved under UDC Section 2.5.2, Special Use Permit), or a blank cell (prohibited in that zoning district)
- Conditional Use Permit (UDC Section 2.5.1): submitted to and decided by the Planning Director (not the Planning & Zoning Commission), following an optional pre-application meeting (UDC Section 2.3); the application must include proof of ownership, a site plan showing the footprint and proposed use of all buildings, proposed parking configuration, and location of all utilities and easements, plus any additional information requested at the pre-application meeting; the Director may require a site/building inspection
- Special Use Permit (UDC Section 2.5.2): a parallel Director-level review and approval process for uses classified 'S' rather than 'C' in the applicable zone district
- Conditional/Special Use Permit approval criteria (UDC Section 2.5.1.C): the site, building(s), and use must meet all criteria specified for the use and the zone district; the proposed use must be consistent with the Comprehensive Plan; any nonconforming site conditions must be brought into conformance if required under Chapter 17.07 (Nonconformities); the use must be planned to minimize adverse traffic/neighborhood impacts; and it must be compatible with adjacent uses in scale, site design, and operating characteristics
- Per UDC Section 4.2.4 (Classification of New and Unlisted Uses), a use not specifically listed in Table 4.2-1 at all triggers a Planning Director interpretation (considering the use's nature, impacts, and utility demands) rather than a direct Conditional or Special Use Permit filing; the Director's interpretation is appealable to the Board of Adjustment under Section 2.7.2 and becomes effective 14 days after written notice to the applicant, the Planning and Zoning Commission, and the Board of Trustees
- Per UDC Section 4.2.3 (Use for Other Purposes Prohibited), approval of a use listed in Table 4.2-1 authorizes only that specific use — development or use of a property for any other use not specifically allowed in Table 4.2-1 and approved under the appropriate process is itself prohibited
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Site/Building Inspection (Director's discretion)
The Director may require an inspection of the site and/or buildings involved to assist in review of a Conditional or Special Use Permit application, per UDC Sections 2.5.1 and 2.5.2. Not a construction-code inspection.
See the full Town of Carbondale inspection guide — scheduling & re-inspection fees →
Tips
- Don't confuse a change to a building's IBC occupancy classification (a construction-code concept, handled through the ordinary Town Building Permit) with a change to a UDC land-use category (a zoning concept, handled through this Conditional/Special Use Permit process) — the two can apply to the same project but are reviewed under different Code chapters.
- Check Table 4.2-1 (Table of Allowed Uses) in the UDC for your specific zone district before assuming which process applies: a 'P' designation means no separate use permit is needed at all beyond the ordinary building/site-plan process (if any); 'C' and 'S' designations require the Conditional or Special Use Permit respectively, at $300 and $500; a blank cell means the use is flatly prohibited in that zone district regardless of permit type.
- A use that isn't listed in Table 4.2-1 at all doesn't default to prohibited — it goes to the Planning Director for a formal interpretation under UDC Section 4.2.4, which is itself appealable to the Board of Adjustment.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Carbondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Town of Carbondale
Change of Use / Conditional or Special Use Permit (Table of Allowed Uses) in other cities
Look up this fee in a different city →
Now live
Build your Town of Carbondale project checklist
Describe your project once and get every permit, document, and fee it triggers in Town of Carbondale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →