Skip to main content
PermitBase

New Single-Family Dwelling, Duplex, or Townhouse Building Permit in Town of Carbondale, Colorado

Required for new single-family residence, duplex, or townhouse building construction in the Town of Carbondale, regulated under the Town-adopted 2021 IRC and 2021 IBC (Ordinance No. 3/2025, effective 7-1-2025). Building Permit fees are valuation-based per the Town's Appendix A fee bracket table, plus a 65% plan review fee.

Verified 2026-07-19 · Source

When you need this permit

  • New single-family dwelling, duplex, or townhouse construction within Town of Carbondale limits
  • Compliance with the Town-adopted 2021 IRC/IBC and IECC (Tier-classification blower-door and duct-leakage requirements apply)
  • Site plan review is not required for a single-family residence but is required for most other development types
  • Shading Analysis, Impervious Surface Calculations, and a Homeowner Agreement for Permitting (if applicable) as part of the submittal packet

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — $1.00 to $500.00 valuationCarbondale Municipal Code Appendix A, Fee Schedule, Building Department Fees table (Supp. No. 19).
$27.50
Building Permit Fee — $501.00 to $2,000.00 valuationAppendix A, Building Department Fees table.
$27.50 for the first $500.00 plus $3.60 for each additional $100.00 or fraction thereof
Building Permit Fee — $2,001.00 to $25,000.00 valuationAppendix A, Building Department Fees table.
$80.25 for the first $2,000.00 plus $16.30 for each additional $1,000.00 or fraction thereof
Building Permit Fee — $25,001.00 to $50,000.00 valuationAppendix A, Building Department Fees table.
$456.75 for the first $25,000.00 plus $11.75 for each additional $1,000.00 or fraction thereof
Building Permit Fee — $50,001.00 to $100,000.00 valuationAppendix A, Building Department Fees table.
$745.50 for the first $50,000.00 plus $8.15 for each additional $1,000.00 or fraction thereof
Building Permit Fee — $100,001.00 to $500,000.00 valuationAppendix A, Building Department Fees table.
$1,150.00 for the first $100,000.00 plus $6.55 for each additional $1,000.00 or fraction thereof
Building Permit Fee — $500,001.00 to $1,000,000.00 valuationAppendix A, Building Department Fees table.
$3,738.00 for the first $500,000.00 plus $5.55 for each additional $1,000.00 or fraction thereof
Building Permit Fee — $1,000,001.00 and up valuationAppendix A, Building Department Fees table.
$6,480.00 for the first $1,000,000.00 plus $4.30 for each additional $1,000.00 or fraction thereof
Plan Review FeeAppendix A, Fee Schedule — 'Each application shall include an additional plan review fee equal to 65% of Building Permit Fee.'
65% of the Building Permit Fee
Town of Carbondale Use TaxAppendix A, Fee Schedule, item 1, per Municipal Code Section 18-1-120.
Declared construction material value x 3.5%

Review timeline

Plan reviewTown of Carbondale’s published plan-review target
49–49 business days

How long did your New Single-Family Dwelling, Duplex, or Townhouse Building Permit permit actually take in Town of Carbondale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Per the Town-adopted 2021 IRC/IBC.

  2. 2

    Framing

    Structural framing inspection consistent with the adopted 2021 IRC/IBC.

  3. 3

    Final

    Final building inspection prior to issuance of Certificate of Occupancy.

See the full Town of Carbondale inspection guide — scheduling & re-inspection fees →

Tips

  • Site plan review is not required for a single-family residence but IS required for nearly all other development types (some PUDs may be exempt), per the Town's Building Department page.
  • Restaurants (new or remodeled) must get plans approved by Garfield County Public Health before submitting a Town building permit application.
  • Building permits and inspections for property inside Carbondale town limits are handled entirely by the Town's own Building Department — NOT by Garfield County, which only administers unincorporated areas of the county.

Frequently asked questions

Town of Carbondale requires a new single-family dwelling, duplex, or townhouse building permit for: New single-family dwelling, duplex, or townhouse construction within Town of Carbondale limits; Compliance with the Town-adopted 2021 IRC/IBC and IECC (Tier-classification blower-door and duct-leakage requirements apply); Site plan review is not required for a single-family residence but is required for most other development types; Shading Analysis, Impervious Surface Calculations, and a Homeowner Agreement for Permitting (if applicable) as part of the submittal packet. If your project isn't listed, confirm with Town of Carbondale Building Department at 970-963-2733 (Town Hall); Inspection line 970-510-1210 (call by 5:00 PM the business day prior to the requested inspection) before starting work.

In Town of Carbondale, the published Building Permit Fee — $1.00 to $500.00 valuation is: $27.50. Additional published fees: Building Permit Fee — $501.00 to $2,000.00 valuation — $27.50 for the first $500.00 plus $3.60 for each additional $100.00 or fraction thereof; Building Permit Fee — $2,001.00 to $25,000.00 valuation — $80.25 for the first $2,000.00 plus $16.30 for each additional $1,000.00 or fraction thereof; Building Permit Fee — $25,001.00 to $50,000.00 valuation — $456.75 for the first $25,000.00 plus $11.75 for each additional $1,000.00 or fraction thereof; Building Permit Fee — $50,001.00 to $100,000.00 valuation — $745.50 for the first $50,000.00 plus $8.15 for each additional $1,000.00 or fraction thereof; Building Permit Fee — $100,001.00 to $500,000.00 valuation — $1,150.00 for the first $100,000.00 plus $6.55 for each additional $1,000.00 or fraction thereof; Building Permit Fee — $500,001.00 to $1,000,000.00 valuation — $3,738.00 for the first $500,000.00 plus $5.55 for each additional $1,000.00 or fraction thereof; Building Permit Fee — $1,000,001.00 and up valuation — $6,480.00 for the first $1,000,000.00 plus $4.30 for each additional $1,000.00 or fraction thereof; Plan Review Fee — 65% of the Building Permit Fee; Town of Carbondale Use Tax — Declared construction material value x 3.5%. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town's own published Estimated Building Permit Review Times table, a New Single-Family Dwelling or Duplex (and New Townhouse Building) carries a combined estimate of 1 week Administrative Review + 2 weeks Planning Department Review + 4 weeks Building Department Review, totaling 7 weeks, once the application is deemed complete. Extended timelines can occur for incomplete or non-compliant submittals.

You'll need: Building Permit Application; Building Permit Checklist; Impervious Surface Calculations Table. Depending on your project, Town of Carbondale may also ask for: Shading Analysis; Homeowner Agreement For Permitting. See the required-documents checklist on this page for details on each.

Town of Carbondale requires 3 inspection(s) for a new single-family dwelling, duplex, or townhouse building permit, in order: Footing/Foundation, Framing, Final. Schedule each through Town of Carbondale Building Department (970-963-2733 (Town Hall); Inspection line 970-510-1210 (call by 5:00 PM the business day prior to the requested inspection)).

Apply through Town of Carbondale Building Department at 511 Colorado Avenue, Carbondale, CO 81623. Phone: 970-963-2733 (Town Hall); Inspection line 970-510-1210 (call by 5:00 PM the business day prior to the requested inspection), email: msikes@carbondaleco.net (Mary Sikes — submit all application documentation in one email as PDF attachments, with the property address in the subject line). Office hours: Town Hall: Monday-Friday, 8:00 AM to 5:00 PM. Fax: 970-963-9140.. Official information: https://www.carbondalegov.org/departments/building/.

Town of Carbondale, Colorado has adopted: 2021 IBC (International Building Code), adopted by Ordinance No. 3/2025 amending Chapter 18 of the Carbondale Municipal Code, effective 7-1-2025, per the Town's Building Department page (carbondalegov.org/departments/building/).; 2021 IRC (International Residential Code), effective 7-1-2025, per the same ordinance.; 2021 IPC (International Plumbing Code), effective 7-1-2025.; 2021 IMC (International Mechanical Code), effective 7-1-2025.; 2021 IECC (International Energy Conservation Code), effective 7-1-2025.; 2021 IEBC (International Existing Building Code), effective 7-1-2025.; 2021 IFGC (International Fuel Gas Code), effective 7-1-2025.; 2021 ISPSC (International Swimming Pool and Spa Code), effective 7-1-2025.; The most current electrical code adopted by the State of Colorado (Carbondale does not maintain its own separately-numbered local electrical code amendment; electrical permitting and inspection in Carbondale is handled by the Colorado State Electrical Board, not the Town — see the 'electrical-permit' entry below).; 2021 IFC (International Fire Code) and the 2025 Colorado Wildfire Resiliency Code (rendered 'CWFC' on the Town's own Building page, elsewhere labeled 'CWRC' and cross-referenced to Municipal Code Article 14) — both became effective 7-1-2026 per the Town's Building Department page, which as of this file's verification date is already in effect (the page's own text is still phrased as 'WILL BE EFFECTIVE 7-1-2026', but that date has now passed).. Local amendments apply — see the Town of Carbondale overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Carbondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.