Skip to main content
PermitBase

Accessory Dwelling Unit (ADU) Permit in Rifle, Colorado

A permit is required for ADU construction within Rifle city limits, per the City's own Residential Information page, which explicitly lists 'ADU's' among the work types requiring a residential permit. This file could not independently locate Rifle's specific ADU zoning standards (size caps, setback, parking, or design requirements) during this extraction beyond the building-permit requirement itself.

Verified 2026-07-06 · Source

When you need this permit

  • ADUs are explicitly listed as requiring a permit on the City's Residential Information page
  • Applications submitted online via Cloudpermit
  • Contact the Building Department (970-665-6461) or Community Development for ADU-specific zoning standards (size, setback, parking, design) — this file could not confirm a published ADU-specific zoning ordinance section during this extraction and does not want to invent size/setback figures not directly sourced

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based table)No ADU-specific flat fee was found published; confirm with Community Development whether any separate land-use application fee also applies
$23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiers

Review timeline

Plan review
Not published — contact the department

How long did your Accessory Dwelling Unit (ADU) Permit permit actually take in Rifle?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation Location Certificate

    Required at foundation completion, consistent with the general building permit process

  2. 2

    Final Inspection

    Completed ADU inspected per approved plans before occupancy

See the full Rifle inspection guide — scheduling & re-inspection fees →

Tips

  • Rifle names ADUs as requiring a permit but this extraction could not locate a public-facing ADU zoning standards page (size caps, parking, setbacks) the way Glenwood Springs publishes one — confirm zoning-specific ADU standards directly with Community Development (970-665-6499, Zach Higgins) before designing a unit.

Frequently asked questions

Rifle requires an accessory dwelling unit (adu) permit for: ADUs are explicitly listed as requiring a permit on the City's Residential Information page; Applications submitted online via Cloudpermit; Contact the Building Department (970-665-6461) or Community Development for ADU-specific zoning standards (size, setback, parking, design) — this file could not confirm a published ADU-specific zoning ordinance section during this extraction and does not want to invent size/setback figures not directly sourced. If your project isn't listed, confirm with City of Rifle Building Department (Community Development Department) at 970-665-6461 before starting work.

In Rifle, the published Building Permit Fee (valuation-based table) is: $23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiers. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Rifle does not publish a plan-review timeline for this permit. Contact City of Rifle Building Department (Community Development Department) at 970-665-6461 for current turnaround.

You'll need: Residential Remodel Application / Building Permit Application (Cloudpermit). See the required-documents checklist on this page for details on each.

Rifle requires 2 inspection(s) for an accessory dwelling unit (adu) permit, in order: Foundation Location Certificate, Final Inspection. Schedule each through City of Rifle Building Department (Community Development Department) (970-665-6461).

Apply through City of Rifle Building Department (Community Development Department) at 202 Railroad Avenue, Rifle, CO 81650 (Rifle City Hall, Level 1 - Community Development suite). Phone: 970-665-6461, email: jnihiser@rifleco.org. Office hours: Monday - Friday, 8:00am - 5:00pm. Permits can be picked up Monday - Friday 8:00am - 4:30pm. Building Official John Nihiser, 970-665-6464; Building Inspector Jenna Lucas, 970-665-6494; Community Development Director Zach Higgins, 970-665-6499. Main City switchboard: 970-665-6400.. Official information: https://www.rifleco.org/72/Building.

Rifle, Colorado has adopted: 2015 International Codes (I-Codes), as locally amended — confirmed directly on the City's Building Department page ('The City of Rifle is under the 2015 International Codes'); 2009 International Energy Conservation Code (IECC) — Energy Zone 5; 2003 ANSI A117.1 (Accessible and Usable Buildings and Facilities); Full Charter and Municipal Code, Chapter 18 (Building Regulations) hosted at library.municode.com/co/rifle — the live Municode page returned an access-restricted/JS-rendered response during this extraction and could not be independently re-verified for the specific adoption-ordinance number and full local-amendment text beyond what the City's own Building Department page and permit application forms directly state; treat Chapter 18 citation as the governing local code chapter by name only, not as a verbatim-quoted source in this file; Design criteria (Table R301.2(1)-equivalent, per the City's own Building Department page): Roof (snow) live load 40 psf; Ground snow load 47 psf; Basic wind speed 120 mph (Ultimate); Seismic Design Category C; Weathering Severe; Frost line depth 36 inches; Termite Slight/moderate; Decay Slight; Winter design temperature -2°F; Ice shield underlayment Required; Flood Hazard Yes (FIRM effective 10-15-85); Air freezing index 2,500; Mean annual temperature 48°F. Local amendments apply — see the Rifle overview page for the full list.

Yes, a permit is required for ADU construction per the City's Residential Information page. This extraction did not locate Rifle's specific ADU zoning standards (size, setback, parking) — confirm these directly with the Community Development Department (970-665-6499) before designing a unit.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rifle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.