EV Charging Station Permit (Issued by the State of Colorado, Not the City) in Rifle, Colorado
As with all electrical work in Rifle, the permit for a Level 2 (or higher) electric vehicle charging station/EVSE is obtained from the Colorado State Electrical Board (Division of Professions and Occupations, DORA), not the City of Rifle — the same finding this file's electrical-permit entry documents, stated verbatim on the City's own Non-Residential Building Permit Application: 'Electrical permits are obtained from the State Electrical Board.' No separate City building permit is required for a standalone EVSE circuit unless it also involves a new structure, in which case the City's own valuation-based Building Permit Fee Worksheet applies to that scope (this file found no evidence the statutory $500/$1,000 solar fee cap under C.R.S. § 24-48.5-113 extends to EV chargers — that cap is solar-specific).
Verified 2026-07-20 · Source
When you need this permit
- Apply for the electrical permit directly with the Colorado Division of Professions and Occupations (DORA), State Electrical Board — not the City of Rifle
- Electrical permit application forms are available from the City's Building Department even though the City itself does not process or issue the permit
- Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) and any state electrical board amendments
- Rifle's own population (approximately 9,900 per the 2020 Census) falls under the 10,000-person threshold for a 'covered municipality' under Colorado's HB24-1173 EV charger permitting law, but Garfield County (population well over 20,000) is a 'covered county' subject to the law's 12/31/2025 permitting-process compliance deadline
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State of Colorado Electrical Inspection(s)
Scheduled directly with the State of Colorado State Electrical Board, not the City's Cloudpermit inspection system
See the full Rifle inspection guide — scheduling & re-inspection fees →
Tips
- Do not schedule electrical inspections through Cloudpermit or the City's Building Department line — EV charger electrical inspections must be scheduled directly with the Colorado State Electrical Board (DORA), the same as any other electrical work in Rifle.
- Electrical permit application forms can be picked up from the City's Building Department for convenience, but the completed application and fee go to the State, not the City.
- Rifle itself (population under 10,000) is not a 'covered municipality' under HB24-1173, but Garfield County is a 'covered county' — if a standardized/expedited EV charger review process exists locally, it would flow from the County's compliance decision, not a City of Rifle ordinance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rifle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Rifle
EV Charging Station Permit (Issued by the State of Colorado, Not the City) in other cities
Look up this fee in a different city →