Timnath building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Timnath, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Timnath Town Center, 4750 Signal Tree Drive, Timnath, CO 80547
- Phone
- 970-224-3211
- Office hours
- Weekdays, 8:00 a.m. to 4:30 p.m. Building Permit Technician direct line 970-449-4639; Building Official direct line 970-566-4674; SAFEbuilt, Inc. inspection line 970-674-1036 (call/email by 4:00 p.m. the prior business day for next-business-day scheduling); SAFEbuilt Colorado regional office 970-686-7511 (561 E. Garden Drive, Unit C, Windsor, CO 80550 — SAFEbuilt's own Northern Colorado office, not a separate Timnath location).
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit (New Construction / Core & Shell)
- 1
Footing/Foundation
Prior to concrete placement, per stamped structural plans and soils report
- 2
Framing/Structural
Structural framing per stamped structural plans
- 3
Special Inspections
Per the structural engineer's list of special inspections required by the Building Code; engineering letters of approval required
- 4
Rough Electrical/Mechanical/Plumbing/Fire Protection
Trade rough-ins before concealment, per stamped MEP and (if applicable) fire protection plans
- 5
Final Building Inspection (SAFEbuilt)
All final building inspections from the Town's building inspector (SAFEbuilt) must be complete before Certificate of Occupancy
- 6
Final Poudre Fire Authority Approval
Required before Certificate of Occupancy, per the Town's Commercial Checklist for Issuance of Certificate of Occupancy
- 7
Site Grading Certificate / Site & Landscaping Final Approval
Grading certificate completed by the Town Engineer; final site and landscaping approval from the Town Planner; parking lot striping completed
- 8
Water/Sewer District Final Approval
Final approval from the water district (meters set) and sewer district, per the Commercial Certificate of Occupancy Checklist
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Rough Electrical/Mechanical/Plumbing
Trade rough-ins before concealment, per stamped MEP plans (where applicable to the scope of work)
- 2
Framing/Structural
Required only where the scope includes structural changes per stamped structural plans
- 3
Final Building Inspection (SAFEbuilt)
All final building inspections from the Town's building inspector (SAFEbuilt) must be complete before Certificate of Occupancy
- 4
Health Department Approval (restaurant/commercial kitchen TI only)
Larimer County health department approval required as a Certificate of Occupancy condition for restaurant/commercial-kitchen tenant finishes
- 5
Final Poudre Fire Authority Approval
Required before Certificate of Occupancy, per the Town's Commercial Checklist for Issuance of Certificate of Occupancy
Applies to: Residential Building Permit (New Construction)
- 1
Footing/Foundation
Before concrete placement
- 2
Framing
Structural framing, bracing, and fasteners in place before cover
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment; subject to contemporaneous Colorado electrical/plumbing license review per HB19-1086/SB19-156
- 4
Final Inspection
All work complete; must occur within 2 years of permit issuance or a new permit is required
Applies to: Residential Addition / Remodel Permit
- 1
Footings
After trenches excavated and forms erected, prior to concrete placement
- 2
Frame/Rough Inspection
After roof, framing, bracing, and fasteners (and any utility rough-ins) are in place
- 3
Final Inspection
After the structure/addition is completed
Applies to: Electric Vehicle (EV) Charger Permit
- 1
Rough Electrical
Wiring, conduit, and disconnect placement verified before concealment, per the same framework documented in the Electrical Permit entry.
- 2
Final Inspection
Charger installed, panel labeled, system energized.
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; subject to contemporaneous state license review
- 2
Final Inspection
Devices installed, panel labeled, system energized
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installation and ductwork before concealment
- 2
Final Inspection
Equipment operational; combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Before concealment — pipe slope, materials, cleanouts
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Roofing Permit (Re-Roof)
- 1
Mid-Roof Inspection
May be required depending on scope — confirm with the Building Department upon permit issuance
- 2
Final Roof Inspection
Required for all re-roof permits
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement, and grounding before cover
- 2
Final Inspection
Racking, roof penetrations, placards/labels, and electrical connections verified
Final inspection only: Fire Sprinkler / Fire Alarm System Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Checklists & handouts
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Timnath building permits
Get alerts for Timnath
We'll email you when Timnath's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.