Timnath building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Timnath, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Timnath Town Center, 4750 Signal Tree Drive, Timnath, CO 80547
- Phone
- 970-224-3211
- Office hours
- Weekdays, 8:00 a.m. to 4:30 p.m. Building Permit Technician direct line 970-449-4639; Building Official direct line 970-566-4674; SAFEbuilt, Inc. inspection line 970-674-1036 (call/email by 4:00 p.m. the prior business day for next-business-day scheduling); SAFEbuilt Colorado regional office 970-686-7511 (561 E. Garden Drive, Unit C, Windsor, CO 80550 — SAFEbuilt's own Northern Colorado office, not a separate Timnath location).
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Footing/Foundation
Before concrete placement
- 2
Framing
Structural framing, bracing, and fasteners in place before cover
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment; subject to contemporaneous Colorado electrical/plumbing license review per HB19-1086/SB19-156
- 4
Final Inspection
All work complete; must occur within 2 years of permit issuance or a new permit is required
Applies to: Residential Addition / Remodel Permit
- 1
Footings
After trenches excavated and forms erected, prior to concrete placement
- 2
Frame/Rough Inspection
After roof, framing, bracing, and fasteners (and any utility rough-ins) are in place
- 3
Final Inspection
After the structure/addition is completed
Applies to: Electric Vehicle (EV) Charger Permit
- 1
Rough Electrical
Wiring, conduit, and disconnect placement verified before concealment, per the same framework documented in this file's Electrical Permit entry.
- 2
Final Inspection
Charger installed, panel labeled, system energized.
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; subject to contemporaneous state license review
- 2
Final Inspection
Devices installed, panel labeled, system energized
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installation and ductwork before concealment
- 2
Final Inspection
Equipment operational; combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Before concealment — pipe slope, materials, cleanouts
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Roofing Permit (Re-Roof)
- 1
Mid-Roof Inspection
May be required depending on scope — confirm with the Building Department upon permit issuance
- 2
Final Roof Inspection
Required for all re-roof permits
Applies to: Solar PV Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement, and grounding before cover
- 2
Final Inspection
Racking, roof penetrations, placards/labels, and electrical connections verified
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Timnath building permits