Electric Vehicle (EV) Charger Permit in Timnath, Colorado

Timnath does not publish a dedicated EV charger/EVSE application, checklist, or fee line. Installing an EV charging station is electrical work, following the same general Electrical Permit mechanism documented in this file's Electrical Permit entry — governed by the 2023 NEC and processed via the Town's Building/Electrical Permit Application (CommunityCore for contractors, email for homeowners). No EV-specific base fee was found published online; per this file's Electrical Permit entry, the base fee schedule (Appendix 4-A to Chapter 4 of the Municipal Code) is itself not published online for any electrical work and must be requested directly from the Town Office. Re-chased 2026-07-20: attempted to pull the Appendix 4-A fee table directly from the Town's Municode library (library.municode.com/co/timnath/codes/municipal_code?nodeId=CD_CH4REFI) — the page loads but renders its content client-side via JavaScript with no fee text present in the static HTML, so the dollar figures could not be extracted even though the node itself resolves. No Wayback Machine snapshot of a Timnath fee-schedule PDF was found either. The governing mechanism (Chapter 4, Appendix 4-A of the Municipal Code, administered by Building Services) is confirmed to exist, but its dollar figures remain genuinely unpublished online after this additional attempt.

Reviewed 2026-07-20 · Source

When you need this permit

  • Building/Electrical Permit Application submitted via CommunityCore (contractors) or by email (homeowners), listing the performing electrical contractor and license information, per the same process documented in this file's Electrical Permit entry
  • 2023 National Electrical Code (NEC) applies, including NEC Article 625 (Electric Vehicle Power Transfer System), adopted at the State of Colorado level and enforced by the Town
  • Electricians must hold current Colorado state electrical licensure (C.R.S. Title 12, Article 23); inspectors may conduct contemporaneous license review per SB19-156
  • No Town of Timnath-specific EV charger application, checklist, or fee line distinct from the general Electrical Permit mechanism was found published as of 2026-07-20 — a genuine documentation gap, not an inferred figure

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Base Electrical Permit FeePart of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211. No EV-charger-specific fee line exists separately from this general Electrical Permit fee, which is itself not published online for any electrical work.
Not published online

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charger Permit permit actually take in Timnath?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring, conduit, and disconnect placement verified before concealment, per the same framework documented in this file's Electrical Permit entry.

  2. 2

    Final Inspection

    Charger installed, panel labeled, system energized.

See the full Timnath inspection guide — scheduling & re-inspection fees →

Tips

  • There is no Town of Timnath EV charger permit — the governing mechanism is the same general Electrical Permit documented elsewhere in this file, whose base fee schedule (Appendix 4-A) is itself not published online for any trade. Get a written fee quote directly from Building Services (970-224-3211 / buildings@timnathgov.com) before budgeting.
  • Confirm your electrician's Colorado state electrical license is current — Timnath does not layer on a separate town-issued electrical trade license.
  • Re-checked 2026-07-20: the Municode chapter node for Chapter 4 (which houses Appendix 4-A) loads but is JavaScript-rendered with no fee dollar figures in the retrievable page content — still confirm the fee directly with Building Services before budgeting.

Frequently asked questions

Timnath requires an electric vehicle (ev) charger permit for: Building/Electrical Permit Application submitted via CommunityCore (contractors) or by email (homeowners), listing the performing electrical contractor and license information, per the same process documented in this file's Electrical Permit entry; 2023 National Electrical Code (NEC) applies, including NEC Article 625 (Electric Vehicle Power Transfer System), adopted at the State of Colorado level and enforced by the Town; Electricians must hold current Colorado state electrical licensure (C.R.S. Title 12, Article 23); inspectors may conduct contemporaneous license review per SB19-156; No Town of Timnath-specific EV charger application, checklist, or fee line distinct from the general Electrical Permit mechanism was found published as of 2026-07-20 — a genuine documentation gap, not an inferred figure. If your project isn't listed, confirm with Town of Timnath Building Services (Community Development Department; building administration contracted to SAFEbuilt Colorado) at 970-224-3211 before starting work.

No. EV charging station installation is billed as ordinary electrical work under the Town's general Electrical Permit, whose base fee (Appendix 4-A to Chapter 4 of the Municipal Code) is not published online and must be obtained directly from the Town Office.

Timnath does not publish a plan-review timeline for this permit. Contact Town of Timnath Building Services (Community Development Department; building administration contracted to SAFEbuilt Colorado) at 970-224-3211 for current turnaround.

You'll need: Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

Timnath requires 2 inspection(s) for an electric vehicle (ev) charger permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Timnath Building Services (Community Development Department; building administration contracted to SAFEbuilt Colorado) (970-224-3211).

Apply through Town of Timnath Building Services (Community Development Department; building administration contracted to SAFEbuilt Colorado) at Timnath Town Center, 4750 Signal Tree Drive, Timnath, CO 80547. Phone: 970-224-3211, email: buildings@timnathgov.com. Office hours: Weekdays, 8:00 a.m. to 4:30 p.m. Building Permit Technician direct line 970-449-4639; Building Official direct line 970-566-4674; SAFEbuilt, Inc. inspection line 970-674-1036 (call/email by 4:00 p.m. the prior business day for next-business-day scheduling); SAFEbuilt Colorado regional office 970-686-7511 (561 E. Garden Drive, Unit C, Windsor, CO 80550 — SAFEbuilt's own Northern Colorado office, not a separate Timnath location).. Official information: https://timnath.org/building-and-construction-services/.

Timnath, Colorado has adopted: 2024 International Building Code (IBC), adopted by reference with local amendments — Ordinance No. 19, Series 2025, effective January 1, 2026. Source: Town of Timnath Building and Construction Services page, https://timnath.org/building-and-construction-services/, and https://timnath.org/wp-content/uploads/2026/03/Ord-19-2025.pdf; 2024 International Fire Code (IFC), adopted by reference with local amendments — Ordinance No. 11, Series 2025 and Ordinance No. 23, Series 2025, effective January 1, 2026. Source: https://timnath.org/wp-content/uploads/2026/03/Ord-11-2025.pdf and https://timnath.org/wp-content/uploads/2026/03/Ord-23-2025.pdf; Colorado Wildfire Resiliency Code, adopted with local amendments — Ordinance No. 5, Series 2026, effective July 1, 2026. Source: https://timnath.org/wp-content/uploads/2026/03/Ord-5-2026.pdf; 2018 International Residential Code (IRC), with amendments — per the Town's own 'Design Criteria and Adopted Codes' summary sheet (dated 2023, most recently modified 8/17/2023). Source: https://timnath.org/wp-content/uploads/2023/08/Design-Criteria-and-Adopted-Codes.pdf; 2018 International Energy Conservation Code (IECC), with amendments — same source; 2021 International Plumbing Code (IPC), with amendments — same source; 2018 International Mechanical Code (IMC), with amendments — same source; 2018 International Fuel Gas Code (IFGC), with amendments — same source; 2018 International Existing Building Code (IEBC), with amendments — same source; 2018 International Property Maintenance Code (IPMC), with amendments — same source; 2018 International Swimming Pool and Spa Code (ISPSC), with amendments — same source; 2023 National Electrical Code (NEC), adopted at the State of Colorado level and enforced by the Town — same source; Design guides published by SAFEbuilt/the Town for specific project types (accessory structures, re-roofing, decks/porches, home additions, basement finishes, PV systems) are explicitly keyed to the 2018 IRC, indicating the IRC edition has not yet been updated to 2024 alongside the IBC/IFC. IMPORTANT: the Town's live Building Division page (checked directly, current as of this extraction) names ONLY the 2024 IBC, 2024 IFC, and Colorado Wildfire Resiliency Code as recently updated — it does NOT state that the IRC, IECC, NEC, IPC, IMC, IFGC, IEBC, IPMC, or ISPSC editions have changed from the 2023-dated 'Design Criteria and Adopted Codes' sheet. Confirm current IRC edition directly with Building Services (970-224-3211) before relying on this for a specific project, since the 2023 sheet predates the confirmed 2024 IBC/IFC adoption and may itself be stale for the other codes.; Local amendments to all adopted codes are codified in Timnath Municipal Code Chapter 18 (Building Regulations) via Municode, https://library.municode.com/co/timnath/codes/municipal_code?nodeId=CD_CH18BURE — this page is a JavaScript-rendered CivicPlus codification app that could not be scraped directly in this session; specific amendment text should be pulled from Municode interactively or via the adopting ordinances themselves.. Local amendments apply — see the Timnath overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.