Residential Building Permit (New Construction) — Timnath, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://timnath.org/building-and-construction-services/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Timnath, Colorado
Required for new single-family and two-family residential construction in Timnath. Plan review is performed by SAFEbuilt Colorado under contract to the Town; the Town of Timnath is the permit-issuing authority. Applications route through the CommunityCore portal for contractors, or by email submittal for homeowners.
Verified 2026-07-06 · Source
When you need this permit
- Submit a complete set of construction drawings including engineered, stamped foundation plans, a copy of Energy Code compliance information (ResCheck or equivalent, per the 2018 IECC as locally amended), and a plot plan
- 1 set of Manual J, D (and S, per the Master Plan process) compliance calculations
- Site Grading Certification required prior to Certificate of Occupancy for all new Single Family, Two-Family, or Multi-Family Residences
- Contractors submit via CommunityCore; homeowners without CommunityCore access may email documents to buildings@timnathgov.com
- General contractor must hold a current Town of Timnath Contractor License; electrical and plumbing trades must hold current Colorado state licensure (subject to contemporaneous license review during inspections per HB19-1086/SB19-156) Contractor
- Use tax deposit (Larimer County, 0.8% of 50% of assumed material valuation) due at permit issuance; Project Cost Report reconciliation due within 60 days of Certificate of Occupancy
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Codified as Appendix 4-A to Chapter 4 of the Timnath Municipal Code, explicitly stated to be 'available from the Town Office' rather than posted publicly. Show full citationHide
Codified as Appendix 4-A to Chapter 4 of the Timnath Municipal Code, explicitly stated to be 'available from the Town Office' rather than posted publicly. Contact buildings@timnathgov.com or 970-224-3211 for current figures. Valuation for fee purposes is calculated via the Town's Valuation Calculator (2022 ICC Building Valuation Data basis, updated 1-Feb-2024): Main Floor $150.87/SF, Basement-Finished $37.51/SF, Basement-Unfinished $23.20/SF, Garage $39.28/SF.Review timeline
Inspection process
- 1
Footing/Foundation
Before concrete placement
- 2
Framing
Structural framing, bracing, and fasteners in place before cover
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment; subject to contemporaneous Colorado electrical/plumbing license review per HB19-1086/SB19-156
- 4
Final Inspection
All work complete; must occur within 2 years of permit issuance or a new permit is required
See the full Timnath inspection guide — scheduling & re-inspection fees →
Tips
- Timnath's Building Services function is contracted to SAFEbuilt Colorado (plan review) and SAFEbuilt, Inc. (inspections) — the Town itself remains the issuing authority and fee-setting body, and applicants deal with both the Town's own staff (Building Permit Technician, Building Official) and SAFEbuilt personnel depending on the step.
- The base building permit fee schedule (Appendix 4-A) is not published online — budget time to call or email the Building Department directly for an accurate fee quote before assuming a figure.
- Design guides for specific project types (re-roof, decks, additions, basement finish, accessory structures, PV) are all keyed to the 2018 IRC even though the Town updated its IBC/IFC to the 2024 editions effective January 1, 2026 — confirm which IRC edition currently governs your specific project with Building Services.
- Larimer County's 0.8% use-tax rate is notably lower than some neighboring Front Range counties — don't assume a higher rate when estimating project costs.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Timnath's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Timnath yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Timnath lands. Privacy.
Other permits in Timnath
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Timnath project checklist
Describe your project once and get every permit, document, and fee it triggers in Timnath — in one checklist. Free, for any city and any number of projects.
Get started →