Sign Permit — Timnath, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://timnath.org/development-application-forms/application-sign-permit-checklist/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Timnath, Colorado
Timnath Land Use Code Article 7 (Signs), Version 22 (effective 3/2/2026), requires a sign permit to erect, move, alter, reconstruct, or substantially repair any permanent or temporary sign in Town limits, except signs expressly exempted under Section 7.5. The permit is administered by the Planning Department (submitted to planning@timnathgov.com); a separate building and/or electrical permit may also be required for a sign's structural or electrical elements, determined case-by-case.
Verified 2026-08-14 · Source
When you need this permit
- A sign permit is required to erect, move, alter, reconstruct, or substantially repair any permanent or temporary sign, except signs expressly exempted, per Land Use Code Section 7.4.1
- In multiple-tenant buildings, a separate sign permit is required for each business entity's sign(s); routine maintenance of existing signs and changing/replacing identical copy on an existing lawful sign do not require a permit
- Signs must be brought into full compliance with Article 7 whenever: repair/remodel cost exceeds 50% of the sign's replacement cost; the business to which the sign relates changes use or name; or the business closes for 90 days or longer and reopens, per Section 7.4.2
- Application requires a completed Sign Permit Checklist form and the $25 fee, plus a site plan (drawn at 1"=20' scale showing distances from lot lines), a detailed drawing showing how applicable code requirements are met, a graphic drawing or photograph of the sign copy (materials, colors, dimensions), a description of any lighting to be used, proof of insurance, and written lease/permission if applicable Contractor
- Within 10 business days of the date of application, the Community Development Director must either certify the application complete or reject it in writing with the specific deficiencies noted, per Section 7.4.3.2
- A separate building and/or electrical permit may be required for a sign's structural or electrical elements, determined on a case-by-case basis, per Section 7.4.1
- A temporary sign permit (e.g., a 'grand opening' sign) may be granted by the Director for no more than 10 days; a single property may not have more than three temporary signs in a calendar year, per Section 7.4.4
- Prohibited signs include flashing/animated/rotating signs, roof signs, portable signs (except where allowed by the applicable zone district), off-premise advertising signs, electronic message boards (except government signs), and searchlights, per Section 7.6
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
See the full Timnath inspection guide — scheduling & re-inspection fees →
Tips
- The 10-business-day clock in the Land Use Code only covers the COMPLETENESS check, not full approval — submit a fully documented application (site plan, drawings, lighting description, insurance proof) the first time to avoid the deficiency-and-resubmit cycle.
- Sign permits are per business entity, not per building — a multi-tenant building needs a separate sign permit for each tenant's sign(s).
- If your sign has any electrical or structural component, budget for a separate building/electrical permit and fee on top of the $25 sign permit fee — Timnath determines this case-by-case.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Timnath
Sign Permit in other cities
Compare sign permit fees across Colorado →
Look up this fee in a different city →