Skip to main content
PermitBase

Residential Addition / Remodel Permit in Trinidad, Colorado

Required for additions, remodels, and structural alterations to existing residential buildings in Trinidad. Reviewed under the 2024 IRC as locally amended; larger reuse/remodel projects may require a Colorado-licensed design professional's structural assessment and, where phased, City Building Official approval of a phasing plan.

Verified 2026-07-06 · Source

When you need this permit

  • General Permit Application submitted via the iWorQ online portal, same as new construction
  • Proof of ownership, plot plan, and construction drawings drawn to scale required
  • For certain remodel or building-reuse projects, a Colorado-licensed design professional must assess the building/structure and provide that assessment to the Building Official to determine current construction type and structural adequacy
  • A 'Phased' approach to a remodel project is allowed only if complete, stamped plans for the current phase and a description/location of future phases (including intended occupancy) are submitted to and approved by the Building Official before that phase begins
  • Contractors must hold a current City of Trinidad Contractor License; homeowners performing work on their own occupied residence are exempt Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (same valuation-based schedule as new construction)City of Trinidad Building Permit Fee Schedule
$24.00 minimum, scaling per the Building Permit Fee Schedule valuation tiers
Plan Review Fee
65% of the permit fee
Reinspection / After-Hours Inspection Fee
$50.00 per hour (minimum two hours)

Review timeline

Plan review
Not published — contact the department

How long did your Residential Addition / Remodel Permit permit actually take in Trinidad?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation (if new footings)

    Before concrete pour, per 32-inch minimum frost depth

  2. 2

    Rough Framing

    Framing tied into existing structure before cover

  3. 3

    Final Inspection

    All work complete per approved plans

See the full Trinidad inspection guide — scheduling & re-inspection fees →

Tips

  • If your remodel involves a change in building use/occupancy or reuse of an existing structure, expect the Building Official to require a licensed design professional's structural assessment before approving plans.
  • Phased remodel projects need complete, stamped plans for the CURRENT phase plus a description of future phases before the Building Official will approve any phase — you cannot start construction on a vague master plan alone.

Frequently asked questions

Trinidad requires a residential addition / remodel permit for: General Permit Application submitted via the iWorQ online portal, same as new construction; Proof of ownership, plot plan, and construction drawings drawn to scale required; For certain remodel or building-reuse projects, a Colorado-licensed design professional must assess the building/structure and provide that assessment to the Building Official to determine current construction type and structural adequacy; A 'Phased' approach to a remodel project is allowed only if complete, stamped plans for the current phase and a description/location of future phases (including intended occupancy) are submitted to and approved by the Building Official before that phase begins; Contractors must hold a current City of Trinidad Contractor License; homeowners performing work on their own occupied residence are exempt. If your project isn't listed, confirm with City of Trinidad Development Services Department, Building Division at (719) 846-9843 ext. 136 or ext. 128 before starting work.

In Trinidad, the published Building Permit Fee (same valuation-based schedule as new construction) is: $24.00 minimum, scaling per the Building Permit Fee Schedule valuation tiers. Additional published fees: Plan Review Fee — 65% of the permit fee; Reinspection / After-Hours Inspection Fee — $50.00 per hour (minimum two hours). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Trinidad does not publish a plan-review timeline for this permit. Contact City of Trinidad Development Services Department, Building Division at (719) 846-9843 ext. 136 or ext. 128 for current turnaround.

You'll need: General Permit Application (iWorQ online portal); Plot Plan. Depending on your project, Trinidad may also ask for: Design Professional Structural Assessment. See the required-documents checklist on this page for details on each.

Trinidad requires 3 inspection(s) for a residential addition / remodel permit, in order: Foundation (if new footings), Rough Framing, Final Inspection. Schedule each through City of Trinidad Development Services Department, Building Division ((719) 846-9843 ext. 136 or ext. 128).

Apply through City of Trinidad Development Services Department, Building Division at 135 N. Animas Street (PO Box 880), Trinidad, CO 81082. Phone: (719) 846-9843 ext. 136 or ext. 128, email: Not published on the Building Inspections, Contractor Licenses & Permits page as of this review; contact via main office line. Office hours: Monday-Friday, 8:00 AM - 5:00 PM (City of Trinidad normal business hours); Development Services Administrator Tara Booth; fax (719) 846-4140. Official information: https://www.trinidad.co.gov/services/community_development/building_inspections___permits.php.

Trinidad, Colorado has adopted: 2024 International Building Code (IBC), including Appendix C (Group U Agricultural Buildings) and Appendix J (Grading) — Trinidad Municipal Code Chapter 5, Section 5-1 (Ord. 4052, Article 1, repealed and reenacted eff. 6-26-26); 2024 International Residential Code (IRC), including Appendix Chapters BE (Radon) and NF (Alternative Building Thermal Envelope Insulation R-Value Options) — Municipal Code Chapter 5, Section 5-2; 2024 International Mechanical Code (IMC), including Appendix A (Chimney Connector Pass-Throughs) — Municipal Code Chapter 5, Section 5-4; 2024 International Fuel Gas Code (IFGC) — Municipal Code Chapter 5, Section 5-5; 2024 International Energy Conservation Code (IECC), amended to require compliance with the Colorado Model Electric Ready and Solar Ready Code (CMERSRC) for both residential (R401.2) and commercial (C401.2) buildings, EXCEPT Chapter 3 Electric Ready Provisions, which are deferred to a City-utility implementation plan beginning July 1, 2027 — Municipal Code Chapter 5, Section 5-6; 2025 International Existing Building Code (IEBC) — Municipal Code Chapter 5, Section 5-7 (the ordinance text names the 2025 edition in its adoption sentence but refers to '2024 Edition' in the following administrative sentences; both readings point to the same currently-adopted IEBC cited in the live ordinance, flagged here as a genuine internal inconsistency in the ordinance's own text rather than resolved by assumption); 2024 International Property Maintenance Code (IPMC), including Appendix Chapter A (Boarding Standard) — Municipal Code Chapter 5, Section 5-8; Section 5-3 (where the International Plumbing Code would sit, per Chapter 15 Section 15-1's own cross-reference 'See Chapter 5, Section 5-3') and Section 5-9 (where a National Electrical Code adoption would typically sit) are both listed as 'Reserved' in the current live Chapter 5 ordinance text as of this review — no standalone IPC or NEC adoption section could be located in the current municipal code; this is a genuine gap, not an oversight in this extraction (see localAmendments); Table R301.2 local design criteria (IRC amendment): Ground Snow Load not less than 30 psf; Wind Design Speed not less than 115 mph; Seismic Design Category B; Frost line depth 32 inches; Ice Barrier Underlayment Required: YES; Weathering: Severe; Termite: Slight to moderate; Flood Hazard FIRM 080107 0001 B, adopted 4/3/84. Local amendments apply — see the Trinidad overview page for the full list.

For certain remodel or building-reuse projects, yes — Municipal Code Chapter 5 requires a Colorado-licensed design professional to assess the building and provide that assessment to the Building Official to ascertain the current type of construction and structural adequacy.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Trinidad building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.