Change of Occupancy / Change of Use Permit in Cortez, Colorado
Unlike Cañon City (which has no standalone change-of-use application or checkbox at all), the City of Cortez's own standard Building Permit Application includes 'Change of Occupancy' as an explicit Project Type checkbox in Section III, alongside New Commercial, Commercial Remodel, Demolition, and the file's other documented project types — confirmed directly from the form. Governed by the City's adopted 2009 International Existing Building Code (IEBC) Chapter 10, Change of Occupancy, and processed on the same application, with the same Declared Construction Value requirement and valuation-based Building Permit Fee schedule, as any other Cortez building permit.
Verified 2026-08-13 · Source
When you need this permit
- 'Change of Occupancy' is an explicit checkbox in Section III (Project Type) of the City of Cortez Building Permit Application — confirmed directly from the form, checked alongside New Commercial, Commercial Remodel, Commercial Addition, and Demolition
- Governed by the City's adopted 2009 International Existing Building Code (IEBC), Chapter 10 (Change of Occupancy), per this file's codesAdopted list
- The Building Permit Application states 'Some project types may require Planning Department review prior to issuing a Building Permit' — a use/occupancy classification change is among the project types most likely to trigger this, since it implicates zoning as well as building code; the City does not itemize an explicit always/never rule for Change of Occupancy specifically, so confirm directly with Planning & Building (970-565-3402)
- Declared Construction Value is required on the application for all project types, including a pure change of occupancy with no accompanying construction scope — the form provides no exemption from this field for use-only changes
- If the new use is not permitted-by-right in the applicable zoning district, Cortez's Conditional Use Permit process ($500.00 fee, 2026 Fee Schedule) — the same process already documented in this file's accessory-dwelling-unit entry — is the City's general mechanism for approving a use not allowed outright by zoning; this file did not independently re-chase the Land Use Code section-by-section for a change-of-use-specific zoning citation beyond this general Conditional Use Permit pathway
- A real but dated example exists of the City processing a 'Change of Occupancy permit' (for a change of use to allow retail sales and cultivation) with a stated $66.00 fee, per January 27, 2015 City Council meeting minutes — this figure predates the current 2026 Fee Schedule by roughly a decade and should NOT be relied on for a current project; the governing fee today is the standard valuation-based Building Permit Fee table documented in this file's residential-building-permit and commercial-building-permit entries
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
The Building Permit Application's Department Use Only section includes separate Planning Review, Building Review, and Final Review sign-off lines, implying inspection/sign-off before the permit closes; the form does not describe change-of-occupancy-specific inspection items distinct from a standard commercial or residential final
See the full Cortez inspection guide — scheduling & re-inspection fees →
Tips
- Cortez is one of the peer Colorado home-rule cities in this corpus that DOES have a standalone Change of Occupancy checkbox on its standard Building Permit Application — don't assume every jurisdiction lacks one just because some peer cities (e.g., Cañon City) route this through a generic commercial-alterations process instead.
- The Declared Construction Value field is required on every Cortez Building Permit Application, including a pure use change with no construction — budget time to confirm with Planning & Building how a $0-construction-value Change of Occupancy application is actually fee'd, since this isn't spelled out in the published Fee Schedule.
- Don't rely on the $66.00 Change of Occupancy fee figure found in a 2015 City Council minutes document — it predates the current 2026 Fee Schedule by about a decade; use the standard valuation-based Building Permit Fee table instead.
- If your new use isn't allowed by right in the zoning district, budget for Cortez's $500.00 Conditional Use Permit process (the same process this file documents for ADUs) as a likely prerequisite before the Change of Occupancy building permit can be issued.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cortez building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Cortez
Change of Occupancy / Change of Use Permit in other cities
Compare change of occupancy / change of use permit fees across Colorado →