Sign Permit in Cortez, Colorado

Required to erect, construct, reconstruct, alter, paint, repaint, or change the use of any sign within Cortez city limits, per City of Cortez Land Use Code Section 5.06 (Signs) and Section 6.21 (Sign permits). Administered by the City's Zoning/Building Inspector within the Division of Planning & Building — the same office and address that handles all other Cortez permit types, unlike some peer Colorado jurisdictions where signage is a separate Planning/Zoning function. The one-time sign permit fee is billed on the same valuation-based Building Permit Fee schedule used for building permits generally, based on the declared value of the proposed signing.

Verified 2026-08-13 · Source

When you need this permit

  • Permit required to erect, construct, reconstruct, alter, paint, repaint, or change the use of any sign, per Land Use Code Sec. 5.06(f) and Sec. 6.21(a); repainting a sign exactly as it was originally permitted, for maintenance purposes, does NOT require a new permit
  • Exempt sign types (Sec. 5.06(f)(1), referencing Sec. 2.02 Definitions): public, directional, occupant, memorial, bulletin, signs in display windows, professional, real estate, signs within buildings, political, and garage sale signs, plus wall signs with less than three (3) square feet of display area
  • Permanent sign area: one (1) square foot of sign area per linear foot of street frontage of the lot (single sign capped at 200 sq ft; total sign area per use-by-right capped at 600 sq ft), per Sec. 5.06(c)(1)(d)
  • Maximum height above grade: wall signs may not exceed the height of the building; ground and roof signs may not exceed 25 feet above grade, per Sec. 5.06(c)(1)(e)
  • Illumination is capped at 25 watts per bulb (incandescent) or 118 watts per bulb (fluorescent), per Sec. 5.06(c)(1)(g); all permitted signs must comply with the National Electric Safety Code
  • Ground signs are allowed only in the C (commercial) and CBD (central business) districts, per Sec. 5.06(c)(1)(h)
  • Temporary signs (announcing a property sale/lease, public event, builder/tenant of a proposed building, or election campaign): max 32 sq ft, max 12 ft height, one per street frontage, no illumination/animation, and a hard 6-month time limit with up to four successive 6-month renewals at the same location — once the sign's stated purpose is fulfilled, the permit is void, per Sec. 5.06(c)(2)
  • Billboards: max 128 sq ft display area, max 12 ft height x 16 ft width, base no more than 1 ft above adjoining street/highway grade, and must identify local goods/services/commodities available in the city; owners must apply annually before March 31 for a current-year permit, per Sec. 5.06(c)(3)
  • Historic Sign designation: the City Council may designate up to nine (9) total signs within the CBD and C districts as exempt from nonconformance provisions, via an application supported by letters from at least 3 other business/property owners in the district and review by the Planning and Zoning Commission (or a council-appointed body) within 45 days, per Sec. 5.06(c)(4)
  • One-time sign permit fee is calculated per the currently-adopted city construction codes Building Permit Fee schedule (the same valuation-based table used for building permits generally), per Sec. 6.21(a)(1); the Sign Permit Application itself asks the applicant to state 'the value of the proposed signing'
  • FEE DISCREPANCY: Land Use Code Sec. 6.21(a)(2) itself states a $10.00 annual billboard permit fee, but the currently-published 2026 Fee Schedule lists $27.50 for a new billboard sign and $50.00 per billboard per year for annual renewal — the more recent, currently-adopted Fee Schedule (effective January 1, 2026) governs; the $10.00 figure in the codified Land Use Code text appears stale
  • Application must include a scale drawing of the proposed sign (height, overall dimensions, colors, materials, proposed copy, illumination specifications, mounting method) and a scale site plan/building-facade outline showing the location, height, and dimensions of all existing and proposed signs on the site, per Sec. 6.21(b)
  • Reviewed by the City's Zoning/Building Inspector, per the Sign Permit Application form; processed under the requirements of the City of Cortez Land Use Code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Fee (not billboards)City of Cortez 2026 Fee Schedule, Planning and Building section, lists this line item as 'Sign Permit (not Billboards) — per adopted permit fee schedule' with no separate flat dollar figure; Land Use Code Sec. 6.21(a)(1) confirms the fee follows 'the currently adopted city construction codes permit fee schedule'
Per the adopted Building Permit Fee schedule (valuation-based), calculated from the declared value of the proposed signing
Billboard Permit — New SignCity of Cortez 2026 Fee Schedule, Planning and Building section
$27.50
Billboard Permit — Annual RenewalCity of Cortez 2026 Fee Schedule; this is a materially higher figure than the $10.00 annual billboard fee still printed in the codified Land Use Code Sec. 6.21(a)(2) text — the Fee Schedule is the more recent, currently-adopted document and governs
$50.00 per billboard, per year
Historical Sign Application FeeCity of Cortez 2026 Fee Schedule, Planning and Building section; applies to an application for City Council historic-sign designation under Land Use Code Sec. 5.06(c)(4)
$75.00
Master Sign Plan2026 Fee Schedule states 'Master Sign Plan — Includes all types of signs — As per adopted permit fee schedule' with no separate flat figure published
Per the adopted permit fee schedule

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Cortez?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Compliance Verification

    Neither the Sign Permit Application nor Land Use Code Sections 5.06/6.21 describe a distinct post-installation field inspection separate from the Zoning/Building Inspector's application review before permit issuance — genuinely unresolved whether a standalone field inspection occurs for signs the way it does for building permits. Confirm directly with Planning & Building (970-565-3402) before assuming no field inspection applies.

See the full Cortez inspection guide — scheduling & re-inspection fees →

Tips

  • Cortez's sign fee structure mirrors its building permit fee structure exactly — the same valuation-based table applies, using the declared value of the signing rather than a flat per-sign fee, unlike many peer jurisdictions with flat sign-permit fees.
  • Watch the fee discrepancy between the codified Land Use Code text ($10.00/year per billboard) and the current 2026 Fee Schedule ($27.50 new + $50.00/year renewal) — budget against the current Fee Schedule figures, not the older codified number.
  • Temporary sign permits are void once their stated purpose (a sale, event, campaign, etc.) is fulfilled, even within the nominal 6-month/4-renewal window — don't treat the 6-month figure as an automatic entitlement to keep a temporary sign up.
  • Ground signs are geographically restricted to the C and CBD zoning districts in Cortez — confirm your property's zoning before assuming a ground sign is allowed.

Frequently asked questions

Yes, for nearly all signs — erecting, constructing, reconstructing, altering, painting, repainting, or changing the use of a sign all require a permit under Land Use Code Sections 5.06 and 6.21. A specific exempt list (public, directional, occupant, memorial, bulletin, window display, professional, real estate, signs within buildings, political and garage-sale signs, and small wall signs under 3 sq ft) does not require a permit.

The one-time sign permit fee (other than billboards) is billed on the same valuation-based Building Permit Fee schedule used for building permits generally, based on the declared value of the proposed signing — no separate flat dollar figure is published. Billboards pay $27.50 for a new sign plus $50.00 per year for annual renewal, per the City's 2026 Fee Schedule.

Cortez does not publish a plan-review timeline for this permit. Contact City of Cortez Community & Economic Development Department, Division of Planning & Building at 970-565-3402 for current turnaround.

You'll need: City of Cortez Sign Permit Application; Scale Drawing of Proposed Sign; Scale Site Plan / Building Facade Outline. See the required-documents checklist on this page for details on each.

Cortez requires 1 inspection(s) for a sign permit, in order: Final Compliance Verification. Schedule each through City of Cortez Community & Economic Development Department, Division of Planning & Building (970-565-3402).

Apply through City of Cortez Community & Economic Development Department, Division of Planning & Building at 123 Roger Smith Avenue, Cortez, CO 81321. Phone: 970-565-3402, email: clindquist@cortezco.gov. Office hours: Monday-Thursday 7:30 a.m.-5:00 p.m.; Friday 8:00 a.m.-12:00 p.m. Permit Tech/Deputy City Clerk (Cheryl Lindquist): 970-564-4016. Fire Inspector/Building Inspector (Sean Canada): 970-564-4009. 24-hour inspection scheduling line: 970-564-4071 (checked daily at 8:00 a.m.; inspections performed 9:00 a.m.-4:30 p.m. Monday-Thursday, excluding holidays). Fax: 970-565-8172.. Official information: https://www.cortezco.gov/186/Building-Permits-Applications.

Cortez, Colorado has adopted: 2015 International Building Code (IBC) — City of Cortez Adopted Codes page; 2015 International Residential Code (IRC), EXCEPT Section R313 (Residential Fire Sprinkler Systems), which was not adopted — City of Cortez Adopted Codes page; 2009 International Mechanical Code (IMC); 2009 International Plumbing Code (IPC); 2009 International Fuel Gas Code (IFGC); 2009 International Existing Building Code (IEBC); 2009 International Energy Conservation Code (IECC) — cited as '2009 International Energy Efficiency Code' on the Adopted Codes page; the City's separate Building Codes & Design Standards page states the 2009 IECC is in effect; 2015 International Property Maintenance Code (IPMC); 2009 International Fire Code (IFC); 2017 National Electrical Code (NEC) — per City of Cortez Building Codes & Design Standards page; NOTE — electrical permits themselves are NOT issued by the City (see localAmendments); this is the code edition the state electrical inspection references for Cortez; ANSI A117.1-2003 Edition, Accessible and Usable Buildings and Facilities; NFPA 211-2000 Edition, Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances; Colorado Manufactured Housing Installations, State Resolution #37; Local Ordinance #851, Series 1997 — Construction Standards for Straw Bale Homes; Full text of IBC/IRC/IFC/IPC/IPMC local amendments is hosted as separate ordinance-amendment documents linked from the City's Building Codes & Design Standards page (https://www.cortezco.gov/184/Building-Codes-and-Design-Standards). Local amendments apply — see the Cortez overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-08-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cortez building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.