La Junta building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in La Junta, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 601 Colorado Avenue (P.O. Box 489), La Junta, CO 81050
- Phone
- (719) 384-5991
- Office hours
- Monday through Thursday 7:30 AM - 5:00 PM, Friday 7:30 AM - 11:30 AM (Municipal Building hours); Director of Engineering Martin Montoya; the Engineering Department consists of three full-time staff: the Director of Engineering, the Building Official, and the Office Manager
- Website
- Official site
Inspection sequence
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (if new footings)
Before concrete pour, if the addition includes new foundation work
- 2
Rough Framing
Framing tied into existing structure before cover
- 3
Final Inspection
All work complete per approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour
- 2
Rough Framing
Framing, electrical, plumbing, and mechanical rough-in complete before cover
- 3
Final Inspection
All work complete per approved plans and applicable 2018 IRC/IBC provisions; inspections can be scheduled at 719-384-5991 before 4:00 PM for the next business day
Applies to: Solar PV Permit
- 1
Mounting Bracket Inspection
Required before panels are installed
- 2
City Building Department Final
Required before Certificate of Occupancy
- 3
State Electrical Inspector Final
Required separately from the City's own final, before Certificate of Occupancy
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, equipment placement, and venting before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Roofing Permit (Reroof/Repair)
- 1
Mid-Roof Inspection
Required when 25%-75% of roof covering material and 100% of underlayment/flashings are installed; if missed, resolve via a 10%-per-side uncovering or a stamped engineer's/architect's letter
- 2
Final Roof Inspection
Required to complete and close the permit; ladder must be properly set and secured for inspector access
Final inspection only: Electrical Permit, EV Charger / EVSE Permit, Plumbing Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Junta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
La Junta building permits
Get alerts for La Junta
We'll email you when La Junta's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.