La Junta building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in La Junta, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
601 Colorado Avenue (P.O. Box 489), La Junta, CO 81050
Phone
(719) 384-5991
Office hours
Monday through Thursday 7:30 AM - 5:00 PM, Friday 7:30 AM - 11:30 AM (Municipal Building hours); Director of Engineering Martin Montoya; the Engineering Department consists of three full-time staff: the Director of Engineering, the Building Official, and the Office Manager

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Rough Framing

    Framing, fire blocking, and rated wall assemblies complete before cover; State-permitted electrical and plumbing rough-ins run on their own State inspection track

  3. 3

    Final Inspection

    All work complete per approved stamped plans and applicable 2018 IBC/IEBC/IFC provisions; inspections can be scheduled at 719-384-5991 before 4:00 PM for the next business day

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if new footings)

    Before concrete pour, if the addition includes new foundation work

  2. 2

    Rough Framing

    Framing tied into existing structure before cover

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Rough Framing

    Framing, electrical, plumbing, and mechanical rough-in complete before cover

  3. 3

    Final Inspection

    All work complete per approved plans and applicable 2018 IRC/IBC provisions; inspections can be scheduled at 719-384-5991 before 4:00 PM for the next business day

Applies to: Solar PV Permit

  1. 1

    Mounting Bracket Inspection

    Required before panels are installed

  2. 2

    City Building Department Final

    Required before Certificate of Occupancy

  3. 3

    State Electrical Inspector Final

    Required separately from the City's own final, before Certificate of Occupancy

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, equipment placement, and venting before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Roofing Permit (Reroof/Repair)

  1. 1

    Mid-Roof Inspection

    Required when 25%-75% of roof covering material and 100% of underlayment/flashings are installed; if missed, resolve via a 10%-per-side uncovering or a stamped engineer's/architect's letter

  2. 2

    Final Roof Inspection

    Required to complete and close the permit; ladder must be properly set and secured for inspector access

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Junta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

La Junta building permits

Get alerts for La Junta

We'll email you when La Junta's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.