La Junta building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in La Junta, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
601 Colorado Avenue (P.O. Box 489), La Junta, CO 81050
Phone
(719) 384-5991
Office hours
Monday through Thursday 7:30 AM - 5:00 PM, Friday 7:30 AM - 11:30 AM (Municipal Building hours); Director of Engineering Martin Montoya; the Engineering Department consists of three full-time staff: the Director of Engineering, the Building Official, and the Office Manager

Inspection sequence

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (if new footings)

    Before concrete pour, if the addition includes new foundation work

  2. 2

    Rough Framing

    Framing tied into existing structure before cover

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour

  2. 2

    Rough Framing

    Framing, electrical, plumbing, and mechanical rough-in complete before cover

  3. 3

    Final Inspection

    All work complete per approved plans and applicable 2018 IRC/IBC provisions; inspections can be scheduled at 719-384-5991 before 4:00 PM for the next business day

Applies to: Solar PV Permit

  1. 1

    Mounting Bracket Inspection

    Required before panels are installed

  2. 2

    City Building Department Final

    Required before Certificate of Occupancy

  3. 3

    State Electrical Inspector Final

    Required separately from the City's own final, before Certificate of Occupancy

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, equipment placement, and venting before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Roofing Permit (Reroof/Repair)

  1. 1

    Mid-Roof Inspection

    Required when 25%-75% of roof covering material and 100% of underlayment/flashings are installed; if missed, resolve via a 10%-per-side uncovering or a stamped engineer's/architect's letter

  2. 2

    Final Roof Inspection

    Required to complete and close the permit; ladder must be properly set and secured for inspector access

La Junta building permits

Get alerts for La Junta

We'll email you when La Junta's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.