Solar PV Permit in La Junta, Colorado
Required for residential (up to 10 kW) and commercial (25 kW or smaller) solar installations in La Junta. Jointly administered by the City's Engineering/Building Department and the City's own Electric Department (for net metering), with a mandatory State of Colorado Electrical Inspector final also required before a Certificate of Occupancy is issued.
Verified 2026-07-06 · Source
When you need this permit
- Building Department Solar Application & Checklist; all plans must include a Production Meter Can
- Equipment must be UL1741 Listed
- Contract for Net Metering with the La Junta Electric Department required (Customer Owned Generation contract; systems capped between 500 watts and 25 kW nameplate capacity)
- Mounting Bracket Inspection required before panels are installed
- Final inspection from the City Building Department AND a separate Final from the State of Colorado Electrical Inspector are both required
- A Certificate of Occupancy must be issued before the production meter is connected
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Mounting Bracket Inspection
Required before panels are installed
- 2
City Building Department Final
Required before Certificate of Occupancy
- 3
State Electrical Inspector Final
Required separately from the City's own final, before Certificate of Occupancy
See the full La Junta inspection guide — scheduling & re-inspection fees →
Tips
- Budget for BOTH a City Building Department final AND a separate State of Colorado Electrical Inspector final — missing either one will delay your Certificate of Occupancy and production meter connection.
- Your Customer Owned Generation (COG) net-metering contract with the La Junta Electric Department is a separate document from the building permit itself — don't confuse the two processes.
- COG systems are capped between 500 watts and 25 kW nameplate capacity for La Junta's net-metering tariff.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Junta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in La Junta
Solar PV Permit in other cities
Compare solar pv permit fees across Colorado →