Building department

Address
601 Colorado Avenue (P.O. Box 489), La Junta, CO 81050
Phone
(719) 384-5991
Office hours
Monday through Thursday 7:30 AM - 5:00 PM, Friday 7:30 AM - 11:30 AM (Municipal Building hours); Director of Engineering Martin Montoya; the Engineering Department consists of three full-time staff: the Director of Engineering, the Building Official, and the Office Manager

Inspection guide

See how inspections work in La Junta — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC) — La Junta Municipal Code Section 15.04.020 (Ord. No. 1643, Section 1(Exh. A), 2023; Ord. 1459, 2007), administered by the Building Department established under Section 15.04.022
  • 2018 International Residential Code (IRC) — Municipal Code Section 15.08.010 (Ord. No. 1643, 2023; Ord. 1460, 2007), with Section R301.2(1) Climatic and Geographic Design Criteria amended per Section 15.08.020 and the ordinance's own Appendix A
  • 2018 International Existing Building Code (IEBC) — Municipal Code Chapter 15.14 (Section 15.14.010, Adoption of International Existing Building Code)
  • 2018 International Mechanical Code (IMC) — Municipal Code Chapter 15.20 (Section 15.20.020, Adoption of International Mechanical Code)
  • 2018 International Fuel Gas Code (IFGC) — Municipal Code Section 15.30.010 (Ord. No. 1643, 2023; Ord. 1456, 2007), Appendix B adopted in its entirety and Section A repealed per Section 15.30.020
  • 2018 International Energy Conservation Code (IECC) — per the City's own Checklist for Single Family/Duplex Residential Plan Review; Energy Calculations required per Section R401.3 of the 2018 IECC (permanent certificate posted at the furnace/utility room/approved location)
  • 2018 International Fire Code (IFC) — Municipal Code Chapter 15.28
  • 2018 International Swimming Pool and Spa Code — per the City's own Checklist for Single Family/Duplex Residential Plan Review
  • Uniform Code for the Abatement of Dangerous Buildings — Municipal Code Chapter 15.12 (Dangerous Building Code)
  • Uniform Housing Code — Municipal Code Chapter 15.24 (Housing Code)
  • Electrical and Plumbing codes: NOT locally adopted by the City — the City's own 'Who Needs a Building Permit' bulletin directs all Electrical, Plumbing, and Gas permit questions to the State of Colorado (Division of Professions and Occupations, 303-894-7800 / dpo.colorado.gov/EandP/forms) rather than to a City chapter; confirmed independently by Title 15's own table of contents, which contains no standalone Electrical or Plumbing Code chapter (Chapters 15.16 and 15.36 are both marked 'Reserved')
  • Design criteria (IRC Table R301.2(1), as locally amended): Wind Load 115 mph; Frost Line 26 inches; Snow Load 25 psf (Live Load); Seismic Design Category B — per the City's Checklist for Single Family/Duplex Residential Plan Review Submittal

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
1units

1 buildings · $120,000 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • La Junta is a home-rule city with its OWN Engineering Department, Building Division (601 Colorado Avenue) — Municipal Code Section 15.04.022 explicitly establishes this Building Department under the City Engineer. Otero County separately administers its own Building Code Resolution (C.R.S. Section 30-28-201) through Otero County Public Works (411 N. 10th St, Rocky Ford) for UNINCORPORATED county territory only — not for La Junta.
  • SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL AND PLUMBING, and these are issued by the STATE OF COLORADO (303-894-7800, dpo.colorado.gov/EandP/forms), not the City — printed directly on the City's own Application for Permits form and confirmed by the absence of any Electrical or Plumbing Code chapter in Municipal Code Title 15 (Chapters 15.16 and 15.36 sit 'Reserved'). Gas-appliance permits are likewise State-administered, though the City itself adopts the International Fuel Gas Code (2018) for gas piping/systems under Chapter 15.30.
  • The City's own Application for Permits publishes a genuine review-timeline figure: 'PLEASE ALLOW 2-3 WEEKS FOR REVIEW' — one of the few Colorado home-rule jurisdictions in this corpus with an explicit self-published turnaround figure rather than a hard null.
  • No standalone dollar-figure fee schedule is published anywhere on the City's site or in the Municipal Code — every permit application (building, roofing, solar) uses a 'Materials $ / Labor $ / Total Valuation $' self-reported field, with fees calculated per the adopted ICC code's own valuation-based table rather than a City-published schedule. Confirm the current fee directly with the Engineering Department (719-384-5991) before quoting a number.
  • Codes are all 2018-cycle (IBC, IRC, IEBC, IMC, IFGC, IECC, IFC, International Swimming Pool and Spa Code) — adopted/re-adopted via Ordinance 1643 in 2023, notably NOT the 2021 or 2024 cycle seen in some other Colorado jurisdictions in this corpus (e.g. Trinidad's 2024/2025 cycle). Design criteria: Wind 115 mph, Frost 26 inches, Snow 25 psf, Seismic Category B.
  • Permits expire if inspections are not performed or continued within 180 days of issuance — stated on both the general Building Permit Application and the Roofing Permit application.
  • Solar installations are the most cross-departmental permit type in this file: they require the City Building Department, the City's own Electric Department (net metering / COG contract), AND a separate State of Colorado Electrical Inspector final — all before a Certificate of Occupancy and production meter connection.
  • No standalone demolition-specific or fence-specific or ADU-specific permit application/checklist/fee schedule could be located on the City's site as of this review; demolition is handled as a checkbox on the general Building Permit Application, and taller fences/retaining walls above the exemption thresholds (6 ft fences, 4 ft retaining walls) appear to route through the same general application rather than a dedicated form. These are honestly omitted as standalone permit types rather than forced from generic assumptions — confirm directly with the Engineering Department if a client's project needs one of these scopes.
  • The City's website migrated from a WordPress-based CMS to CivicPlus/CivicEngage very recently — most older wp-content.org/uploads links (e.g. an old /engineering/ page path, an old WhoNeedsABuildingPermit.pdf path) now 404. Always use the current /194/Engineering and /DocumentCenter/View/* paths cited in this file rather than older cached/search-indexed URLs.
  • A 'When do I need a building permit and how much will it cost?' entry appears on the City's website FAQ tool, but it is explicitly labeled 'Example FAQs (for Training)' — generic CivicPlus platform boilerplate, not genuine City-authored content. It was not relied upon as a source of fact in this file beyond the unremarkable, independently-corroborated statement that permit price is valuation-based.

Comparable nearby cities

Lamar
8 shared permit types~51 mi away