Residential Building Permit (New Construction) in La Junta, Colorado
Required for new single-family and duplex residential construction within La Junta city limits. Reviewed under the 2018 IRC as locally amended (Table R301.2(1) design criteria) by the City of La Junta Engineering Department, Building Division.
Verified 2026-07-06 · Source
When you need this permit
- Plans must comply with the 2018 IRC, 2018 IEBC, 2018 IECC, 2018 IMC, 2018 IFC, and 2018 International Swimming Pool and Spa Code as adopted
- Must meet La Junta's Table R301.2(1) design criteria: Wind Load 115 mph, Frost Line 26 inches, Snow Load 25 psf, Seismic Design Category B
- Two complete sets of plans required: one paper set submitted to the office, one electronic PDF set emailed to ljpermits@lajuntacolorado.org
- At least 3 property corners must exist and be verified, or a new survey (monumented by a Colorado-licensed professional land surveyor, at applicant's cost) is required before permit issuance
- Site plan showing proposed/existing buildings, dimensions, yard setbacks, and utilities
- Full drawing set: floor plans, elevations (4 views), attic/crawl space access, floor and roof framing (certified truss drawings), electrical plan, plumbing plan, mechanical/HVAC plan with equipment schedules
- 2018 IECC Energy Calculations (REScheck) and a permanent energy certificate posted at the furnace/utility room per Section R401.3
- Electrical and plumbing work require SEPARATE permits from the State of Colorado (not the City) — printed directly on the City's own application form
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour
- 2
Rough Framing
Framing, electrical, plumbing, and mechanical rough-in complete before cover
- 3
Final Inspection
All work complete per approved plans and applicable 2018 IRC/IBC provisions; inspections can be scheduled at 719-384-5991 before 4:00 PM for the next business day
See the full La Junta inspection guide — scheduling & re-inspection fees →
Tips
- Submit two complete plan sets — one paper copy to the Engineering Department office and one electronic PDF emailed to ljpermits@lajuntacolorado.org — per the City's own Residential Plan Submission checklist.
- Verify your property corners early: if fewer than 3 corners can be verified, you'll need a new survey by a Colorado-licensed surveyor at your own cost before the City will issue the permit.
- The City's own application states to allow 2-3 weeks for plan review — budget your project timeline accordingly.
- Electrical and plumbing permits are handled entirely by the State of Colorado (303-894-7800), not the City — plan for a separate State application and inspection track alongside your City building permit.
- Permits expire if inspections are not performed or continued within 180 days of issuance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the La Junta building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in La Junta
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your La Junta project checklist
Describe your project once and get every permit, document, and fee it triggers in La Junta — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →