Skip to main content
PermitBase

Sign Permit in Steamboat Springs, Colorado

City of Steamboat Springs Community Development Code (CDC) Article 5 (Signs) sets sign design/dimensional standards; CDC Article 7, Section 711 (“Sign Permit”) sets the permit process. A Sign Permit is issued by the City's Planning and Community Development Department (not the Routt County Regional Building Department) for placement or construction of a permanent, historic, or temporary sign, except as exempted, limited, or prohibited in CDC Section 504. Three permit types are established: Permanent Sign Permit, Temporary Sign Permit, and Historic Sign Permit. If the sign is a freestanding structure requiring structural review, a separate RCRBD Building Permit (valuation-based) is also required for the structural work.

Verified 2026-08-14 · Source

When you need this permit

  • A Sign Permit is required for any placement or construction of a permanent, historic, or temporary sign except as exempted, limited, or prohibited in CDC Section 504, including erection, alteration, installation, relocation, reconstruction, enlargement, lighting, addition of color, color differentiation, or display of a sign not previously visible, and painting/application of wall or window signs, per CDC §711.A.1
  • A Sign Permit is also required for any sign approved by Minor or Major Adjustment, any sign included in a Sign Plan, alterations to a sign inconsistent with sign maintenance (CDC §508.D), and any addition/modification of a differentiated background, per CDC §711.A.1
  • Three Sign Permit types are established for review purposes: Permanent Sign Permit, Temporary Sign Permit, and Historic Sign Permit, per CDC §711.A.2
  • Review is prior to or concurrent with review of a building permit, if applicable, and may be concurrent with Sign Plan review, if applicable, per CDC §711.B
  • A Permanent Sign Permit approval remains effective for one year from the date of approval; a Temporary Sign Permit remains effective for the term specified on the permit, per CDC §711.D
  • Certain sign types are exempt from a Sign Permit and from all Article 5 standards, as listed in CDC §504
  • If the sign is a structure requiring structural design (e.g., a freestanding monument or pole sign), Structural Plans are also required and a separate RCRBD Building Permit must be obtained, with the standard RCRBD valuation-based building permit fee applying in addition to the City's Sign Permit fee

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Sign Permit (City Planning Dept.)City of Steamboat Springs Development Application Fee Schedule, effective June 17, 2024.
$150 for one permit covering up to 4 signs; additional signs $50 each
Temporary Sign PermitCity of Steamboat Springs Development Application Fee Schedule, effective June 17, 2024.
$50 for one permit covering up to 4 occasions
Sign Plan / Sign Plan Amendment / Article 5 Alternative ComplianceCity of Steamboat Springs Development Application Fee Schedule, effective June 17, 2024. A Major Adjustment involving a sign is $1,050.
Sign Plan $375; Sign Plan Amendment $100; Article 5 Alternative Compliance $50
RCRBD Building Permit (structural signs only)RCRBD's combined fee schedule has no separate sign line item; a structural sign is billed under RCRBD's standard valuation-based Building Permit fee table (e.g., $1.00-$500 valuation = $21.15) in addition to the City's Sign Permit fee above. Contact RCRBD at 970-870-5566 for a valuation-specific quote.
Not published — contact the department

Review timeline

Plan reviewSteamboat Springs’s published plan-review target
14–14 business days

How long did your Sign Permit permit actually take in Steamboat Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Steamboat Springs inspection guide — scheduling & re-inspection fees →

    Tips

    • A structural sign (freestanding monument/pole sign) needs BOTH a City Sign Permit (Planning Dept., flat fee) AND a separate RCRBD Building Permit (valuation-based) for the structural work — budget for two separate fees from two separate departments.
    • One Sign Permit covers up to 4 signs for $150; each additional sign beyond 4 is $50, so bundling multiple signs into one application/permit saves money versus filing separately.

    Frequently asked questions

    Steamboat Springs requires a sign permit for: A Sign Permit is required for any placement or construction of a permanent, historic, or temporary sign except as exempted, limited, or prohibited in CDC Section 504, including erection, alteration, installation, relocation, reconstruction, enlargement, lighting, addition of color, color differentiation, or display of a sign not previously visible, and painting/application of wall or window signs, per CDC §711.A.1; A Sign Permit is also required for any sign approved by Minor or Major Adjustment, any sign included in a Sign Plan, alterations to a sign inconsistent with sign maintenance (CDC §508.D), and any addition/modification of a differentiated background, per CDC §711.A.1; Three Sign Permit types are established for review purposes: Permanent Sign Permit, Temporary Sign Permit, and Historic Sign Permit, per CDC §711.A.2; Review is prior to or concurrent with review of a building permit, if applicable, and may be concurrent with Sign Plan review, if applicable, per CDC §711.B; A Permanent Sign Permit approval remains effective for one year from the date of approval; a Temporary Sign Permit remains effective for the term specified on the permit, per CDC §711.D; Certain sign types are exempt from a Sign Permit and from all Article 5 standards, as listed in CDC §504; If the sign is a structure requiring structural design (e.g., a freestanding monument or pole sign), Structural Plans are also required and a separate RCRBD Building Permit must be obtained, with the standard RCRBD valuation-based building permit fee applying in addition to the City's Sign Permit fee. If your project isn't listed, confirm with Routt County Regional Building Department (RCRBD) — City of Steamboat Springs jurisdiction at 970-870-5566 before starting work.

    The City's flat Sign Permit fee is $150 for one permit covering up to 4 signs ($50 for each additional sign), per the City's Development Application Fee Schedule effective June 17, 2024. A Temporary Sign Permit is $50. Structural signs also incur a separate RCRBD valuation-based Building Permit fee.

    Steamboat Springs's published plan-review target for a sign permit is 14–14 business days.

    You'll need: Sign Permit Application. Depending on your project, Steamboat Springs may also ask for: Structural Plans (if applicable). See the required-documents checklist on this page for details on each.

    Apply through Routt County Regional Building Department (RCRBD) — City of Steamboat Springs jurisdiction at Routt County Courthouse Annex, 136 6th Street, Suite 201, Steamboat Springs, CO 80487. Phone: 970-870-5566, email: Building@co.routt.co.us. Office hours: Monday-Friday 7:30 am-4:00 pm. Building Official: Todd Carr (tcarr@co.routt.co.us). Fax 970-870-5489. No voicemail inspection requests accepted by phone — inspections must be requested through the CityView Portal. Note: an alternate phone number, 970-879-5566, also appears in some third-party directory listings for this same office; 970-870-5566 is used here as it appears verbatim and consistently across every RCRBD-authored PDF (fee schedule, permit processes, de-construction policy) pulled directly for this file.. Official information: https://www.co.routt.co.us/583/City-of-Steamboat-Springs.

    Steamboat Springs, Colorado has adopted: 2021 International Building Code (IBC), including Appendix Chapters C, E, and J — City of Steamboat Springs Building Code Ordinance, Sec. 5-2/5-3 (adopted by reference, RCRBD-enforced); 2021 International Residential Code (IRC), including Appendix Chapters B, C, E, F, and Q — Sec. 5-4/5-5; 2021 International Existing Building Code (IEBC) — adopted per the ordinance preamble; National Electrical Code (NEC) as adopted by the State of Colorado Electrical Board; 2021 International Mechanical Code (IMC); 2021 International Energy Conservation Code (IECC) — Sec. 1148 area of the ordinance; 2021 International Plumbing Code (IPC); 2021 International Fuel Gas Code (IFGC); 2021 International Property Maintenance Code (IPMC); 2021 International Wildland-Urban Interface Code (IWUIC) — Sec. 5-22/5-23, adopted with Chapters 3, 4, and 6 plus Appendices A, B, C, D, F, G, H, and I explicitly DELETED; only specific Chapter 5 sections retained (all other Chapter 5 sections not enumerated in the ordinance are deleted) — this is a narrower, more surgical WUI adoption than Breckenridge's town-wide full-CWRC approach in the same corpus; Colorado State Model Electric and Solar Ready Code — Sec. 5-24, adopted city-wide for new construction meeting the code's square-footage thresholds; Countywide RCRBD adoption of the 2021 ICC series (IBC/IRC/IECC/IEBC/IFGC/IPC/IMC/IPMC) plus portions of the 2021 IWUIC and the 2023 Colorado State Model Electric and Solar Ready Code, effective January 1, 2024, applies uniformly across all RCRBD-served jurisdictions including Steamboat Springs — verified via the City's own separately-numbered ordinance adopting the identical 2021 edition set, so city and county codes are aligned rather than divergent; Full ordinance text: City of Steamboat Springs Building Code Ordinance (adopting the 2021 IBC/IRC/IEBC/NEC/IMC/IECC/IPC/IFGC/IPMC/IWUIC + Colorado Electric/Solar Ready Code), hosted via Routt County DocumentCenter. Local amendments apply — see the Steamboat Springs overview page for the full list.

    Yes. CDC §711.A requires a Sign Permit for placement or construction of most permanent, historic, or temporary signs, with limited exemptions listed in CDC §504. The City's Planning and Community Development Department administers Sign Permits; a separate RCRBD Building Permit is also required if the sign is a structure needing structural review.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Steamboat Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.