Skip to main content
PermitBase

Rooftop Solar Photovoltaic Permit in Julesburg, Colorado

Required for rooftop or ground-mounted solar photovoltaic installations within Julesburg town limits. The Town runs its own genuine building-permit and electrical-inspection program (not deferred to Sedgwick County or Colorado DORA), but publishes no dollar-denominated fee schedule for any permit type online — fees for solar, as for every other permit type in this file, are set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution' with no such resolution published. Notably, the Town's own IRC Appendix Adoption Table (Ordinance No. 23-470, June 2023) explicitly lists Appendix RA (Solar-Ready Zone, Residential) as 'Not Adopted.' Colorado's statewide solar-fee cap (C.R.S. § 24-48.5-113, $500 residential/$1,000 commercial via HB21-1284) still applies as a ceiling on whatever fee the Town assesses.

Reviewed 2026-07-20 · Source

When you need this permit

  • Building permit required for the structural/mounting portion of a solar PV installation, submitted on the Town's generic 'Application for Building Permit' one-page form at Town Hall (100 West 2nd Street)
  • Electrical interconnection is inspected by the Town's OWN local electrical inspector (Municipal Code Chapter 15.12, 'city electrician') — Julesburg does NOT defer electrical inspection to Colorado DORA's State Electrical Board, unlike many small Colorado towns
  • The Town's adopted IRC Appendix RA (Solar-Ready Zone, Residential) is explicitly 'Not Adopted' per Ordinance No. 23-470 — meaning Julesburg does not impose the model code's solar-ready wiring/conduit pre-installation requirements on new construction
  • Colorado's statewide C.R.S. § 24-48.5-113 (HB21-1284) caps the aggregate of all fees a local government may charge to install an active solar energy system at $500 for a residential permit and $1,000 for a commercial permit, applying regardless of what the Town's (unpublished) fee resolution otherwise specifies
  • Same 180-day permit expiration and blank Permit Fee/Use Tax fields on the paper application apply as with any other Julesburg building permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (solar, structural/mounting portion)Confirm current fee directly with Town Hall (970-474-3344). Subject to Colorado's statewide C.R.S. § 24-48.5-113 cap of $500 (residential) / $1,000 (commercial) on the aggregate of all local fees for an active solar energy system, regardless of what the Town's own unpublished resolution otherwise specifies.
Not published — set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution'; no such resolution PDF is published online, and the paper application form leaves the Permit Fee field blank for Town Hall staff to fill in
Electrical Inspection Fee (interconnection, Town's own local electrical inspector)Julesburg Municipal Code Chapter 15.12 creates a Town 'city electrician' who inspects electrical work directly, rather than deferring to Colorado DORA's State Electrical Board
Not published — same 'fee schedule adopted... by resolution' gap applies to electrical work generally in this file

Review timeline

Plan review
Not published — contact the department

How long did your Rooftop Solar Photovoltaic Permit permit actually take in Julesburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing (ground-mount) or Framing (rooftop racking)

    Structural attachment verified before panels are installed

  2. 2

    Electrical Interconnection (Town Electrical Inspector)

    Performed by the Town's own local electrical inspector ('city electrician,' Municipal Code Chapter 15.12), not the Colorado State Electrical Board

See the full Julesburg inspection guide — scheduling & re-inspection fees →

Tips

  • Julesburg is one of the few small Colorado towns in this corpus that runs its OWN local electrical inspection program rather than deferring to Colorado DORA — confirm your electrician is prepared to coordinate with the Town's own 'city electrician,' not the state board.
  • The Town's own code explicitly did NOT adopt the IRC's Solar-Ready Zone Appendix (Appendix RA) in its 2023 code update (Ordinance No. 23-470) — this is a real, checked local choice, not an oversight.
  • No dollar fee is published for any Julesburg permit type, including solar — call ahead for a fee estimate, and note that Colorado's statewide $500 residential solar-fee cap (C.R.S. § 24-48.5-113) applies as a ceiling regardless of what the Town's unpublished resolution otherwise sets.
  • Re-chase pass (2026-07-20), additional dead ends checked: (1) townofjulesburg.com's ordinances/documents pages were re-fetched live and contain no fee schedule; a direct guess at a Title 8 (Buildings) ordinance PDF path returned a 404; (2) Sedgwick County's own 2024 Building Permit Fee Schedule was located and fetched via Wayback (flat \$50.00 fee for any structure valued \$2,000+; no fee for structures under \$2,000) -- but the schedule's own text states 'Sedgwick County does not have a building code ordinance,' and independent web search confirms residents inside Julesburg town limits are directed to the Town Clerk, not the County, for building permits, meaning the County schedule likely does NOT govern in-town construction and should not be cited here without direct confirmation from the Town. (3) No Town of Julesburg building-code chapter was found on Municode, eCode360, or American Legal Publishing. This entry's original finding stands: the Town's own ordinance sets fees 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution,' but no such resolution is published online, and the paper application leaves the Permit Fee field blank for Town Hall staff to complete manually. No citable governing dollar figure exists after this exhaustive chase; confirm directly with the Town Clerk, (970) 474-3346.
  • Re-chased 2026-07-23, new avenues (not previously exhausted): live-fetched the Town's actual document library index (which lists every ordinance/resolution PDF the Apptegy/Thrillshare CMS serves, including Title 2 Administration, Title 3 Revenue and Finance) and Title 3 (Revenue and Finance) in full -- it covers sales/use tax only, no building/solar permit fee schedule. Also located and full-text-searched all 13 Town Board of Trustees meeting minutes for 2025 and all 5 published for 2026 for any resolution establishing a building-permit or solar-specific fee -- none found (2026's only new fee resolution, No. 2026-03, is a $250 Use-by-Special-Review land-use fee, unrelated to building/solar permits). Also re-read Ordinance No. 23-470's own IBC/IRC Appendix Adoption Table and Section 109.2/R108.2 'Schedule of permit fees' text directly in the source PDF -- both explicitly delegate to a future Town Board resolution rather than embedding a dollar table, confirming no fee figure was overlooked in the ordinance itself. 2024 Board minutes were sought via a Wayback-archived link to the (now unlinked) 2024 minutes folder, but the underlying per-meeting PDFs were never independently archived (confirmed via direct CDX API lookups returning zero snapshots), so that year remains unrecoverable through this avenue. No governing solar permit-fee figure exists after this exhaustive re-chase beyond the already-cited statewide C.R.S. § 24-48.5-113 cap; still confirm directly with Town Hall (970-474-3344).

Frequently asked questions

Julesburg requires a rooftop solar photovoltaic permit for: Building permit required for the structural/mounting portion of a solar PV installation, submitted on the Town's generic 'Application for Building Permit' one-page form at Town Hall (100 West 2nd Street); Electrical interconnection is inspected by the Town's OWN local electrical inspector (Municipal Code Chapter 15.12, 'city electrician') — Julesburg does NOT defer electrical inspection to Colorado DORA's State Electrical Board, unlike many small Colorado towns; The Town's adopted IRC Appendix RA (Solar-Ready Zone, Residential) is explicitly 'Not Adopted' per Ordinance No. 23-470 — meaning Julesburg does not impose the model code's solar-ready wiring/conduit pre-installation requirements on new construction; Colorado's statewide C.R.S. § 24-48.5-113 (HB21-1284) caps the aggregate of all fees a local government may charge to install an active solar energy system at $500 for a residential permit and $1,000 for a commercial permit, applying regardless of what the Town's (unpublished) fee resolution otherwise specifies; Same 180-day permit expiration and blank Permit Fee/Use Tax fields on the paper application apply as with any other Julesburg building permit. If your project isn't listed, confirm with Town of Julesburg — Town Hall / Building Official (Town Manager or designee) at 970-474-3344 before starting work.

Yes. C.R.S. § 24-48.5-113 (enacted via HB21-1284) caps the aggregate of all fees any Colorado local government may charge to install an active solar energy system at $500 for a residential permit and $1,000 for a commercial permit — this applies to Julesburg the same as any other Colorado municipality, regardless of the Town's own (unpublished) fee resolution.

Julesburg does not publish a plan-review timeline for this permit. Contact Town of Julesburg — Town Hall / Building Official (Town Manager or designee) at 970-474-3344 for current turnaround.

You'll need: Application for Building Permit. See the required-documents checklist on this page for details on each.

Julesburg requires 2 inspection(s) for a rooftop solar photovoltaic permit, in order: Foundation/Footing (ground-mount) or Framing (rooftop racking), Electrical Interconnection (Town Electrical Inspector). Schedule each through Town of Julesburg — Town Hall / Building Official (Town Manager or designee) (970-474-3344).

Apply through Town of Julesburg — Town Hall / Building Official (Town Manager or designee) at 100 West 2nd Street, Julesburg, CO 80737. Phone: 970-474-3344, email: julesburg@live.com. Office hours: No published office hours specific to permitting were found on the Town's website; general Town Hall contact is 970-474-3344 (fax 970-474-3345). Julesburg is a statutory town with no dedicated 'Building Department' webpage — permitting is administered out of Town Hall by the Building Official (per Municipal Code Section 15.04.030, an office whose appointment now functions through the Town Manager or designee, per Ordinance 23-472's 2023 update naming the Town Manager/designee as inspector for the plumbing and electrical trades specifically).. Official information: https://www.townofjulesburg.com/.

Julesburg, Colorado has adopted: 2018 International Building Code (IBC), as locally amended — Town of Julesburg Municipal Code Chapter 15.04, adopted by Ordinance No. 23-470 (passed June 5, 2023); 2018 International Residential Code (IRC), as locally amended — same Ordinance No. 23-470; 2018 International Mechanical Code (IMC), as locally amended — same Ordinance No. 23-470; 2018 International Fire Code (IFC), as locally amended — same Ordinance No. 23-470; 2018 International Fuel Gas Code (IFGC), as locally amended — same Ordinance No. 23-470; 2018 International Energy Conservation Code (IECC), as locally amended — same Ordinance No. 23-470; Legacy 1965-edition National Electrical Code base text remains codified at Municipal Code Chapter 15.12 (Ord. 268(3), 1967) and has NOT been superseded by a newer NEC edition adoption ordinance found in this corpus's document chase; Ordinance No. 23-472 (2023) updated ONLY the licensure/permitting administrative sections (15.12.070, 15.12.090) for electrical work, not the substantive wiring-code edition. Confirm the currently enforced NEC edition directly with Town Hall (970-474-3344) before relying on a specific cycle for electrical plan review — this is a genuine open question after full document chasing, not an assumption.; Ordinance No. 23-470 explicitly repeals all conflicting/inconsistent prior Town of Julesburg ordinances and supersedes the original 1967 Basic Building Code (BOCA) and 1965 National Electrical Code base adoption at Chapter 15.04, replacing the substantive building/residential/mechanical/fire/fuel-gas/energy code editions with the 2018 ICC family; the base administrative/licensing chapters for Plumbing (15.08) and Electrical (15.12) remain independently codified from 1967 as amended by Ordinance No. 23-472 (2023).; Frost line: 36 inches below finished grade (IBC Section 1809.5 local amendment, Ordinance No. 23-470).; Ground snow load: 20 psf (Table R301.2, as locally amended, per the adopted Climatic and Geographic Design Criteria table in Ordinance No. 23-470) — figure is somewhat garbled in the source PDF's OCR ('2012fil'), read here as 20 psf; confirm directly with the Building Official before relying on this for structural design.; Wind design speed: 112 mph (Table R301.2, as locally amended).; Ice barrier underlayment required per Section R905.1.2 (2018 IRC as amended): required on roofs with a slope equal to or less than 4:12, consisting of not fewer than two layers of cemented underlayment or a self-adhering polymer-modified bitumen sheet, extending from the lowest roof edge to at least 24 inches inside the exterior wall line — this is a slope-triggered requirement, not a 100%-of-all-roofs rule.; Flood hazard areas established by reference to 'The Flood Plain Information Report: South Platte River for the Town of Julesburg and Sedgwick County, Colorado' (dated May 18, 2021) plus the accompanying FEMA Flood Insurance Rate Map (FIRM) and Flood Boundary and Floodway Map (FBFM), per Section 1612.3 local amendment; Chapter 15.32 'Flood Damage Prevention' is a separate standalone chapter of the Municipal Code (not modeled as a permitType, but is a co-applicable regulatory layer for any parcel in a mapped flood hazard area).; Elevation for Manual J design criteria: 3,470 ft; Latitude 40.9883°N; Winter design dry-bulb 0°F (indoor 70°F referenced); Summer design dry-bulb 90°F (outdoor); Indoor summer relative humidity gains blank/not legible in source; per the adopted Climatic and Geographic Design Criteria table, Ordinance No. 23-470.; Unvented gas log heaters and unvented room/decorative heaters are PROHIBITED under locally amended IRC Section R1004.4 and IMC Section 903.3 / IFGC Section G2445.1 (Ordinance No. 23-470) — a materially stricter local amendment than the base ICC text.; Automatic fire sprinkler systems requirement (IRC Section R313) is DELETED IN ITS ENTIRETY by local amendment (Ordinance No. 23-470) — Julesburg does NOT require residential fire sprinklers for one- and two-family dwellings.; IBC Appendix Adoption Table (Ordinance No. 23-470): Adopted — Appendix AG (Flood-Resistant Construction), AH (Signs), AI (Patio Covers), AJ (Grading). Explicitly Not Adopted — Appendix AA (Employee Qualifications), AB (Board of Appeals), AC (Group U Agricultural Buildings), AD (Fire Districts), AE (Supplementary Accessibility Requirements), AF (Rodent-Proofing), AK (Administrative Provisions), AL (Earthquake Recording Instrumentation), AM (Tsunami-Generated Flood Hazards), AN (Replicable Buildings), AO (Performance-Based Application Index), AU (Cob Construction), AV (Board of Appeals, IRC table), AW (3D-Printed Building Construction).; IRC Appendix Adoption Table (Ordinance No. 23-470): Adopted — Appendix AH (Patio Covers), AQ (Tiny Homes). Not Adopted — Appendix RA (Solar-Ready Zone, Residential) among others listed Not Adopted.; HB22-1362 (Colorado 'Building Greenhouse Gas Emissions' Act, 2022) note, checked honestly rather than assumed: the Town's own adopted IRC/IBC Appendix Adoption Tables (Ordinance No. 23-470, June 2023) explicitly list Appendix RA (Solar-Ready Zone — Residential) and Appendix CA (Solar-Ready Zone — Commercial) as 'Not Adopted.' HB22-1362 does not create a flat population-based exemption for any jurisdiction (that premise is associated with a different, never-enacted bill, SB25-141, and was explicitly flagged as wrong going into this research); instead HB22-1362 requires jurisdictions updating to a later-triggering code cycle to adopt either the Model Electric Ready and Solar Ready Code, the Model Low Energy and Carbon Code, or — for rural counties that apply for and are not awarded state grants substantially assisting adoption/enforcement — energy codes achieving equivalent or better performance than the three most recent IECC editions. Julesburg's current adopted energy code is the 2018 IECC (adopted June 2023), and its own appendix table shows solar-ready provisions not adopted as of that ordinance. Whether/when HB22-1362's triggering mechanism reaches a town of Julesburg's size, and whether Sedgwick County or Julesburg has pursued the rural-county grant pathway, was NOT found published anywhere in the Town's ordinances, Sedgwick County's website, or general search after full chasing — flagged as a genuinely open/unresolved compliance question rather than invented.; Electrical and plumbing: Julesburg runs ITS OWN local licensing and inspection program — it does NOT defer to Colorado DORA state trade boards. Municipal Code Chapter 15.12 creates a Town 'electrical inspector' (referred to in the code as the 'city electrician') appointed by the mayor, and Chapter 15.08 creates a Town 'plumbing inspector.' Ordinance No. 23-472 (2023) updated the licensure sections so that the Town Manager or their designee now serves as plumbing inspector, and updated qualification/bonding requirements for both trades. Permits, licensing, bonding/insurance, and inspection-and-certificate sign-off for both trades are handled entirely at the Town level, not referred to DORA's State Electrical Board or State Plumbing Board.; No separately-published, dollar-denominated Building/Plumbing/Mechanical/Electrical permit fee schedule was found on the Town's website, its Documents/Forms & Applications library, or Ordinance No. 23-470/23-472 (both state fees are 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution' — i.e. fees live in a separate resolution, not the ordinance itself, and no such resolution PDF is published online). The generic 'Application for Building Permit' and 'Application for Building Permit — Roofing & Siding' forms both have blank Permit Fee / Use Tax fields for Town Hall staff to fill in at submittal. Confirm current fees directly with Town Hall (970-474-3344) before budgeting — omitted rather than invented, per this corpus's zero-tolerance data policy.. Local amendments apply — see the Julesburg overview page for the full list.

The Town's own local electrical inspector ('city electrician,' Municipal Code Chapter 15.12) — Julesburg runs its own electrical licensing and inspection program and does not defer to the Colorado State Electrical Board (DORA), unlike many small Colorado towns.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Julesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.