Rooftop Solar Photovoltaic Permit — Julesburg, Colorado · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.townofjulesburg.com/documents/town-of-julesburg-ordinances/558813
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Rooftop Solar Photovoltaic Permit in Julesburg, Colorado
Required for rooftop or ground-mounted solar photovoltaic installations within Julesburg town limits. The Town runs its own genuine building-permit and electrical-inspection program (not deferred to Sedgwick County or Colorado DORA), but publishes no dollar-denominated fee schedule for any permit type online — fees for solar, as for every other permit type in this jurisdiction, are set 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution' with no such resolution published. Notably, the Town's own IRC Appendix Adoption Table (Ordinance No. 23-470, June 2023) explicitly lists Appendix RA (Solar-Ready Zone, Residential) as 'Not Adopted.' Colorado's statewide solar-fee cap (C.R.S. § 24-48.5-113, $500 residential/$1,000 commercial via HB21-1284) still applies as a ceiling on whatever fee the Town assesses.
Reviewed 2026-07-20 · Source
When you need this permit
- Building permit required for the structural/mounting portion of a solar PV installation, submitted on the Town's generic 'Application for Building Permit' one-page form at Town Hall (100 West 2nd Street)
- Electrical interconnection is inspected by the Town's OWN local electrical inspector (Municipal Code Chapter 15.12, 'city electrician') — Julesburg does NOT defer electrical inspection to Colorado DORA's State Electrical Board, unlike many small Colorado towns
- The Town's adopted IRC Appendix RA (Solar-Ready Zone, Residential) is explicitly 'Not Adopted' per Ordinance No. 23-470 — meaning Julesburg does not impose the model code's solar-ready wiring/conduit pre-installation requirements on new construction
- Colorado's statewide C.R.S. § 24-48.5-113 (HB21-1284) caps the aggregate of all fees a local government may charge to install an active solar energy system at $500 for a residential permit and $1,000 for a commercial permit, applying regardless of what the Town's (unpublished) fee resolution otherwise specifies
- Same 180-day permit expiration and blank Permit Fee/Use Tax fields on the paper application apply as with any other Julesburg building permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Confirm current fee directly with Town Hall (970-474-3344). Show full citationHide
Confirm current fee directly with Town Hall (970-474-3344). Subject to Colorado's statewide C.R.S. § 24-48.5-113 cap of $500 (residential) / $1,000 (commercial) on the aggregate of all local fees for an active solar energy system, regardless of what the Town's own unpublished resolution otherwise specifies.Review timeline
Inspection process
- 1
Foundation/Footing (ground-mount) or Framing (rooftop racking)
Structural attachment verified before panels are installed
- 2
Electrical Interconnection (Town Electrical Inspector)
Performed by the Town's own local electrical inspector ('city electrician,' Municipal Code Chapter 15.12), not the Colorado State Electrical Board
See the full Julesburg inspection guide — scheduling & re-inspection fees →
Tips
- Julesburg is one of the few small Colorado towns that runs its OWN local electrical inspection program rather than deferring to Colorado DORA — confirm your electrician is prepared to coordinate with the Town's own 'city electrician,' not the state board.
- The Town's own code explicitly did NOT adopt the IRC's Solar-Ready Zone Appendix (Appendix RA) in its 2023 code update (Ordinance No. 23-470) — this is an explicit local choice, not an oversight.
- No dollar fee is published for any Julesburg permit type, including solar — call ahead for a fee estimate, and note that Colorado's statewide $500 residential solar-fee cap (C.R.S. § 24-48.5-113) applies as a ceiling regardless of what the Town's unpublished resolution otherwise sets.
- Additional context on the fee-schedule gap: (1) townofjulesburg.com's ordinances/documents pages contain no fee schedule. (2) Sedgwick County's own 2024 Building Permit Fee Schedule (archived on Wayback) sets a flat $50.00 fee for any structure valued $2,000+ and no fee for structures under $2,000 -- but the schedule's own text states 'Sedgwick County does not have a building code ordinance,' and residents inside Julesburg town limits are directed to the Town Clerk, not the County, for building permits, meaning the County schedule likely does NOT govern in-town construction and should not be relied on without direct confirmation from the Town. (3) No Town of Julesburg building-code chapter is hosted on Municode, eCode360, or American Legal Publishing. The Town's own ordinance sets fees 'in accordance with a fee schedule adopted from time to time by the Town Board by resolution,' but no such resolution is published online, and the paper application leaves the Permit Fee field blank for Town Hall staff to complete manually. No citable governing dollar figure is published; confirm directly with the Town Clerk, (970) 474-3346.
- The Town's document library index (listing every ordinance/resolution PDF the Town's CMS serves, including Title 2 Administration and Title 3 Revenue and Finance) contains no building/solar permit fee schedule; Title 3 (Revenue and Finance) covers sales/use tax only. None of the 13 Town Board of Trustees meeting minutes for 2025 or the 5 published for 2026 contains a resolution establishing a building-permit or solar-specific fee (2026's only new fee resolution, No. 2026-03, is a $250 Use-by-Special-Review land-use fee, unrelated to building/solar permits). Ordinance No. 23-470's own IBC/IRC Appendix Adoption Table and Section 109.2/R108.2 'Schedule of permit fees' text both explicitly delegate to a future Town Board resolution rather than embedding a dollar table, so no fee figure exists in the ordinance itself. The Town's 2024 Board minutes are no longer linked on the live site and were never archived by the Wayback Machine, so that year's minutes are not publicly recoverable. No governing solar permit-fee figure is published beyond the already-cited statewide C.R.S. § 24-48.5-113 cap; confirm with Town Hall (970-474-3344).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Julesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Julesburg's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Julesburg yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Julesburg lands. Privacy.
Other permits in Julesburg
Rooftop Solar Photovoltaic Permit in other cities
Compare rooftop solar photovoltaic permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Julesburg project checklist
Describe your project once and get every permit, document, and fee it triggers in Julesburg — in one checklist. Free, for any city and any number of projects.
Get started →