Electric Vehicle (EV) Charger / EVSE Permit — Julesburg, Colorado · Requirements sheet
Reviewed 2026-07-20 · Source: https://files-backend.assets.thrillshare.com/documents/asset/uploaded_file/4502/Toj/aa61098d-cba3-4acb-b376-7f732ef462b0/Title_15_-_Buildings_and_Construnction-UA.pdf?disposition=inline
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Julesburg, Colorado
Julesburg has no dedicated EV charger/EVSE fee line, application, or standard — the Town's Municipal Code Chapter 15.12 (Electrical Code) and Ordinance No. 23-472 publish no EV-specific provisions, and no fee schedule of any kind is published online for any Julesburg permit type (fees are set case-by-case by the Board of Trustees / Town Hall). EV charger circuit installation is treated as ordinary electrical work, requiring the same written permit obtained through the Town's own electrical licensing and inspection program under Chapter 15.12 (Julesburg does not defer to Colorado DORA's State Electrical Board). Julesburg's population (approximately 1,200) is far below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's requirement to adopt a standardized/expedited EV charging system permitting program, so the Town is not required to have adopted a distinct EV permitting track.
Reviewed 2026-07-20 · Source
When you need this permit
- Written permit required before any EV charger circuit installation, wiring alteration, or load increase, obtained from the Town's license-issuing clerk (Municipal Code Section 15.12.050) — the same permit used for any other electrical work
- Contractors/firms must hold a Town of Julesburg electrical license (fee set by the Board of Trustees); individual homeowners performing their own work on their own home are exempt from licensing/bonding but still need the permit
- All electrical construction/materials/apparatus must conform to the National Electrical Code rules in effect when work is performed (Section 15.12.100) — confirm the currently enforced NEC edition and its EV charging (Article 625) provisions directly with Town Hall
- Upon completion, the Electrical Inspector must inspect and issue a certificate of satisfactory inspection before current may be turned on (Section 15.12.120)
- Julesburg's population (approximately 1,200) is well below Colorado HB24-1173's 10,000-resident municipal threshold, so no distinct state-mandated EV charging permit standard applies here
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Inspection and testing of the EV charger circuit and wiring for code compliance by the Town's Electrical Inspector, per Section 15.12.110
- 2
Certificate of Satisfactory Inspection
Issued upon completion and compliant inspection before current may be energized, per Section 15.12.120
See the full Julesburg inspection guide — scheduling & re-inspection fees →
Tips
- Julesburg does not price EV chargers separately from other electrical work, and in fact publishes no dollar-denominated electrical permit fee schedule at all online — call Town Hall (970-474-3344) directly to get a current fee quote before budgeting.
- Julesburg runs its own local electrical licensing/permitting/inspection program (Municipal Code Chapter 15.12) rather than deferring to Colorado DORA's State Electrical Board — confirm requirements directly with the Town's Electrical Inspector.
- As one of this dataset's smallest Colorado jurisdictions, Julesburg is well under the population threshold that would legally require it to adopt a distinct, streamlined EV charging permit process under Colorado HB24-1173.
- Re-chased 2026-07-20: re-fetched the Town's Municipal Code Chapter 15.12 PDF and ran a fresh targeted web search for a Julesburg electrical/building fee resolution -- found only a December 2025 Board of Trustees minutes document addressing an electric utility RATE increase (not a permit fee), confirming no permit fee schedule of any kind is published online. Since Julesburg runs its own local electrical program rather than deferring to Colorado DORA's State Electrical Board (unlike some other small Colorado towns in this dataset), the DORA state fee-schedule fallback does not apply here either. No citable dollar figure exists; genuinely thin documentation, not an oversight.
- Re-chased 2026-07-23, new avenues (not previously exhausted): downloaded and full-text-searched all 13 Town of Julesburg Board of Trustees meeting minutes for calendar year 2025 and all 5 minutes published so far for 2026 (townofjulesburg.com/documents/board-of-trustees) for any resolution establishing an electrical/EV-charger permit or inspection fee -- none exists; the only 2026 fee resolution passed (Resolution No. 2026-03, adopted at the March 2026 meeting) sets a $250 Use-by-Special-Review land-use application fee, unrelated to electrical/EV work. Also fetched and searched Municipal Code Title 3 (Revenue and Finance) in full -- it governs sales/use tax only, not permit fees. Also re-confirmed via the operative Ordinance No. 23-472 text itself that the Town's only 2023 electrical-fee change was administrative/licensure, with no EV-specific provision. 2024 Board minutes were sought via Wayback Machine (the live site no longer links a 2024 minutes folder) but the underlying per-meeting PDF documents were never independently archived by Wayback (confirmed via a direct CDX API lookup returning zero snapshots for each PDF's asset URL), so that year's minutes remain unrecoverable through this avenue. No governing EV-charger fee figure exists after this exhaustive re-chase; still confirm with Town Hall (970-474-3344).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Julesburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Julesburg
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Colorado →
Look up this fee in a different city →