Change of Use Permit — Blue River, Colorado · Requirements sheet
Reviewed 2026-08-13 · Source: https://townofblueriver.colorado.gov/sites/g/files/lrnvjt1556/files/Town%20of%20Blue%20River%20Land%20Use%20Code%20Updated%204-2-2025.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use Permit in Blue River, Colorado
Blue River has no standalone 'change of use permit' distinct from its existing Type A/B/C building-permit and Land-Use-Code development-application framework — an honest gap after a genuine chase, not a coverage oversight. The Land Use Code defines 'change of use' only as one qualifying form of 'Development' generally (Sec. 16-3-20), and it does NOT appear as its own line item in the Land Use Code's Chapter 16C development-application classification table (which names 18+ specific improvement categories — Fence, Gazebo, Hot Tub, Sign, Excavation, etc. — each tagged Type A/B/C). Red White & Blue Fire Protection District's adopted 2018 IFC amendment to Sec. 102.4 instead folds 'changes in use' into standard IBC/IRC-compliant construction-permit review. Given this file's existing confirmed finding that Blue River has no usable commercial zoning district on any existing in-town parcel, the classic building-code change-of-use scenario (e.g., converting a commercial tenant space between occupancy classifications) has no real-world applicability here; the closest genuine change-of-use action available to a Blue River property owner is Town of Blue River short-term rental (STR) licensing.
Reviewed 2026-08-13 · Source
When you need this permit
- No permitType named 'Change of Use' appears on the Town's live Type A, Type B, or Type C Permits pages, nor as a distinct item in the Land Use Code's own Chapter 16C development-application classification table — checked directly (2026-08-13); that table enumerates 18+ specific physical-improvement categories, each tagged Type A, B, or C, with no 'Change of Use' line
- The Land Use Code's definition of 'Development' (Sec. 16-3-20) includes 'change of use' as one qualifying form of development alongside construction, alteration, and de-/re-vegetation of land — meaning a change of use IS within the Code's regulatory scope, but only as a component of whichever Type A, B, or C Development Application actually applies to the physical work involved, not as a freestanding permit type of its own
- Red White & Blue Fire Protection District's Resolution 2019-06 (2018 IFC adoption applicable to Blue River) amends IFC Sec. 102.4: 'the design and construction of new structures shall comply with the International Building Code or International Residential Code and the International Fire Code, and any alterations, additions, changes in use or changes in structures required by this code... shall be made in accordance therewith' — a physical change of use is therefore reviewed as a standard Building Permit (Type A, B, or C depending on scope), not through a separate change-of-use permit
- This file's existing NO COMMERCIAL PERMIT TRACK finding independently confirms Blue River's Land Use Code establishes no commercial zoning district usable by any existing in-town parcel (Transitional, R-1, and PRD districts are residential/institutional-only; the sole Mixed-Use District requires 35+ acre annexation after June 20, 2023) — so the classic building-code change-of-use scenario has no applicable parcel in Blue River today
- The closest real change-of-use-style approval that DOES exist and IS separately licensed: a Short-Term Rental (STR) License. Land Use Code Sec. 16A-17-10(b): lease/rental for 30 consecutive days or less is unlawful 'unless such short-term rental is undertaken pursuant to the Town's issuance of a short-term rental license in accordance with Article 1 of Chapter 6 of the Municipal Code'; the Code explicitly states 'the short-term rental of property is not a right of use and is a privilege subject to annual licensing' — a residential-to-STR change of use in Blue River is licensed, not building-permitted, as a 'change of use'
- Confirm directly with the Building Official (SPinspections@caa.inc) whether a specific proposed change of use requires a Type A, B, or C Development Application — classification depends on the physical scope of work involved, not on the use change itself
Required documents
Check off what you have — your progress is saved on this device.
Fee schedule
Review timeline
Inspection process
See the full Blue River inspection guide — scheduling & re-inspection fees →
Tips
- There is no 'change of use permit' to apply for in Blue River — if your project involves construction, you'll go through the same Type A/B/C Building Permit process documented elsewhere in this file, classified by the physical scope of work, not by the fact that a use is changing.
- If your actual goal is converting a home to a short-term rental, that's a Town of Blue River STR License (Municipal Code Chapter 6, Article 1) — a licensing action, not a building-permit 'change of use.'
- Because Blue River has no usable commercial zoning on any existing parcel, don't expect a commercial-to-commercial or residential-to-commercial change-of-use path here at all — see this file's NO COMMERCIAL PERMIT TRACK finding.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Blue River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Blue River
Change of Use Permit in other cities
Compare change of use permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Blue River project checklist
Describe your project once and get every permit, document, and fee it triggers in Blue River — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →