Victor building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Victor, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 500 Victor Ave (also published as 500 W. Victor Ave.), PO Box 86, Victor, CO 80860
- Phone
- 719-689-2284
- Office hours
- Monday - Thursday: 8am to 5pm, Friday: 8am to Noon. The City contracts with Shums Coda Associates (ShumsCoda) as its Building Official for plan review and inspections; general/code-interpretation questions are directed to the Building Department main line above.
- Website
- Official site
Published scheduling rules
- The City's Building Official function is contracted out to Shums Coda Associates; plan review and inspection scheduling should be coordinated through the City Building Department's main line (719-689-2284). (Residential Building Permit (New Single-Family Construction))
Inspection sequence
Applies to: Residential Building Permit (New Single-Family Construction)
- 1
Foundation
Before concrete pour, per 36-inch minimum frost depth and soils report design
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans; Certificate of Occupancy issued upon passing
Applies to: Deck / Covered Patio / Carport Permit
- 1
Footing/Foundation
Before concrete pour, for structures requiring new footings
- 2
Framing
Structural framing complete before cover, for covered/enclosed structures
- 3
Final Inspection
All work complete per approved plans
Applies to: Residential Addition / Remodel Permit
- 1
Foundation (additions with new footings only)
Before concrete pour, per 36-inch minimum frost depth or matching existing foundation type
- 2
Rough Frame / Rough Trade
Framing and electrical/plumbing/mechanical rough-ins before concealment
- 3
Final Inspection
All work complete per approved plans
Applies to: Electric Vehicle (EV) Charging Station / EVSE Permit
- 1
Rough Electrical
EVSE circuit wiring and panel/disconnect installed before concealment
- 2
Final Inspection
Charging equipment installed, system energized and verified per 2014 NEC Article 625
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment
- 2
Final Inspection
Devices installed, panel labeled, system energized and verified
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Solar Panel (Rooftop Photovoltaic) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical connections verified
Final inspection only: Demolition Permit, Roofing Permit (Re-Roof)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Victor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Victor building permits
Get alerts for Victor
We'll email you when Victor's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.