Victor building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Victor, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
500 Victor Ave (also published as 500 W. Victor Ave.), PO Box 86, Victor, CO 80860
Phone
719-689-2284
Email
Office hours
Monday - Thursday: 8am to 5pm, Friday: 8am to Noon. The City contracts with Shums Coda Associates (ShumsCoda) as its Building Official for plan review and inspections; general/code-interpretation questions are directed to the Building Department main line above.

Published scheduling rules

  • The City's Building Official function is contracted out to Shums Coda Associates; plan review and inspection scheduling should be coordinated through the City Building Department's main line (719-689-2284). (Residential Building Permit (New Single-Family Construction))

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Construction)

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost depth and soils report design

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans; Certificate of Occupancy issued upon passing

Applies to: Deck / Covered Patio / Carport Permit

  1. 1

    Footing/Foundation

    Before concrete pour, for structures requiring new footings

  2. 2

    Framing

    Structural framing complete before cover, for covered/enclosed structures

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation (additions with new footings only)

    Before concrete pour, per 36-inch minimum frost depth or matching existing foundation type

  2. 2

    Rough Frame / Rough Trade

    Framing and electrical/plumbing/mechanical rough-ins before concealment

  3. 3

    Final Inspection

    All work complete per approved plans

Applies to: Electric Vehicle (EV) Charging Station / EVSE Permit

  1. 1

    Rough Electrical

    EVSE circuit wiring and panel/disconnect installed before concealment

  2. 2

    Final Inspection

    Charging equipment installed, system energized and verified per 2014 NEC Article 625

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, and equipment placement before concealment

  2. 2

    Final Inspection

    Equipment operational, combustion air and venting verified

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

Applies to: Solar Panel (Rooftop Photovoltaic) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before cover

  2. 2

    Final Inspection

    Racking, roof penetrations, and electrical connections verified

Re-inspection fees

Electrical PermitBuilding/Electrical Re-inspection Fee
$100.00
Electric Vehicle (EV) Charging Station / EVSE PermitBuilding/Electrical Re-inspection Fee
$100.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Victor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Victor building permits

Get alerts for Victor

We'll email you when Victor's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.