Required for new commercial building construction and additions to existing commercial buildings within Victor city limits. The City's Permit Requirement Quick Guide lists a distinct 'COMMERCIAL CONSTRUCTION' category (separate from New Residential Construction and Residential Remodel) with 'New' and 'Addition' rows requiring the fullest document package of any category in the Guide -- notably more than any residential row. Governed by the 2012 IBC as locally adopted (with amendments per Ordinance No. 485), the City's Design Criteria commercial wind-speed table (2012 IBC Table 1604.5, by risk category), and COMcheck/Performance energy compliance rather than the residential Manual J/prescriptive path. Plan review and inspections are performed by the City's contracted Building Official, Shums Coda Associates.

Reviewed 2026-08-02 · Source

When you need this permit

  • Building Permit Application and required plans submitted in person at Victor City Hall along with permit fees -- there is no separate commercial-only application form; the same Building Permit Application used for residential projects is used for commercial
  • Per the Permit Requirement Quick Guide's COMMERCIAL CONSTRUCTION > New row, new commercial construction requires: Permit, Application/Fee, Engineered Plans (2 sets + electronic), Drawings (2 sets + electronic), Boundary Survey, Soils Test (wet-stamped), Water and Sanitation Availability confirmation, Foundation Plans, Structural Plans (wet-stamped), Engineered Truss Drawings (if trusses used), Plot/Site Plan with setbacks, COMcheck/Performance energy compliance, and Electrical/Plumbing/Mechanical plans -- more marked requirement columns than any other category (residential or commercial) in the Guide
  • The Addition row lists a very similar but slightly reduced package relative to New commercial construction (the Quick Guide's flattened table format does not preserve unambiguous column-by-column alignment for this row, so the exact 1-2 omitted items cannot be stated with certainty from this source alone) -- most plausibly a new Boundary Survey and/or Water and Sanitation Availability confirmation are not required for additions since those would already be established from the original building's construction, consistent with how the Guide treats residential additions
  • Commercial buildings must be designed to the City's wind speed by risk category per 2012 IBC Table 1604.5: 105 mph (Risk Category I), 115 mph (Risk Category II), 120 mph (Risk Category III), 120 mph (Risk Category IV); Exposure C assumed unless Exposure B is proven for the location
  • Additions must use the same foundation type as the existing structure, or provide stamped/signed engineering for a different foundation type
  • A soils test report from a qualified Geotechnical Engineer is required for new buildings per IBC 1803.1, and foundation plans must use that report's design
  • Foundations must rest at or below the 36-inch frost depth per the City's Design Criteria, unless a code-approved exception applies
  • Construction may not commence until the permit is issued and posted on the property; permits become null and void after 365 days without an inspection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 8 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (covers building, plumbing, mechanical) -- valuation $1.00 to $500.00City of Victor Fee & Fine Schedule, Chapter 18 -- same combined table used for both residential and commercial projects; the Fee & Fine Schedule does not distinguish building type for this fee
$23.50
Building Permit Fee -- valuation $501.00 to $2,000.00
$23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000.00
Building Permit Fee -- valuation $2,001.00 to $25,000.00
$69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000.00
Building Permit Fee -- valuation $25,001.00 to $50,000.00
$391.25 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000.00
Building Permit Fee -- valuation $50,001.00 to $100,000.00
$643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000.00
Building Permit Fee -- valuation $100,001.00 to $500,000.00
$993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000.00
Building Permit Fee -- valuation $500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000.00
Building Permit Fee -- valuation $1,000,001.00 and up
$5,608.75 for the first $1,000,000 plus $3.15 for each additional $1,000 or fraction thereof
Building Plan Review Fee (if required)
65% of the building permit fee for the initial and second review; actual code-consultant costs for any additional review
Electric Permit Fee, Nonresidential Buildings -- valuation $0.00 to $2,000.00Commercial electrical work bills under the 'Nonresidential Buildings and Residential Alteration or Addition' valuation-based table -- NOT the flat square-footage table used for new residential buildings
$115.00
Electric Permit Fee, Nonresidential Buildings -- valuation $2,001.00 or more
$115.00 plus $11.50 per $1,000.00 or portion thereof of valuation
Electrical Plan Review Fee
65% of the electrical permit fee for the initial and second review; actual code-consultant costs for any additional review
Investigation Fee (work started without a permit)Waivable in limited emergency/notice-cure circumstances per the Fee & Fine Schedule
Equal to the permit fee, in addition to required permit fees

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction & Addition) permit actually take in Victor?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 36-inch minimum frost depth and soils report design

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  4. 4

    Final Inspection

    All work complete per approved plans; Certificate of Occupancy issued upon passing

See the full Victor inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial New Construction and Additions require the fullest document package in Victor's Permit Requirement Quick Guide -- more marked requirements than any residential category -- budget for a boundary survey, wet-stamped soils/structural/foundation engineering, and COMcheck energy compliance in addition to trade plans.
  • There is no separate commercial-only Building Permit Fee table -- the same combined valuation-based schedule (covering building, plumbing, and mechanical work) applies to both residential and commercial projects. Only the electrical fee differs: commercial/nonresidential electrical work bills on the valuation-based 'Nonresidential' table rather than the flat square-footage table used for new residential buildings.
  • Applications are submitted IN PERSON at Victor City Hall -- there is no published online permit portal for commercial projects, same as every other permit type in this jurisdiction.
  • Victor's population (~400) puts commercial construction here at small-town scale -- confirm your design professional is referencing the 2012 IBC and the City's specific Design Criteria wind-speed-by-risk-category table, not a newer code cycle or a generic regional assumption.

Frequently asked questions

Victor requires a commercial building permit (new construction & addition) for: Building Permit Application and required plans submitted in person at Victor City Hall along with permit fees -- there is no separate commercial-only application form; the same Building Permit Application used for residential projects is used for commercial; Per the Permit Requirement Quick Guide's COMMERCIAL CONSTRUCTION > New row, new commercial construction requires: Permit, Application/Fee, Engineered Plans (2 sets + electronic), Drawings (2 sets + electronic), Boundary Survey, Soils Test (wet-stamped), Water and Sanitation Availability confirmation, Foundation Plans, Structural Plans (wet-stamped), Engineered Truss Drawings (if trusses used), Plot/Site Plan with setbacks, COMcheck/Performance energy compliance, and Electrical/Plumbing/Mechanical plans -- more marked requirement columns than any other category (residential or commercial) in the Guide; The Addition row lists a very similar but slightly reduced package relative to New commercial construction (the Quick Guide's flattened table format does not preserve unambiguous column-by-column alignment for this row, so the exact 1-2 omitted items cannot be stated with certainty from this source alone) -- most plausibly a new Boundary Survey and/or Water and Sanitation Availability confirmation are not required for additions since those would already be established from the original building's construction, consistent with how the Guide treats residential additions; Commercial buildings must be designed to the City's wind speed by risk category per 2012 IBC Table 1604.5: 105 mph (Risk Category I), 115 mph (Risk Category II), 120 mph (Risk Category III), 120 mph (Risk Category IV); Exposure C assumed unless Exposure B is proven for the location; Additions must use the same foundation type as the existing structure, or provide stamped/signed engineering for a different foundation type; A soils test report from a qualified Geotechnical Engineer is required for new buildings per IBC 1803.1, and foundation plans must use that report's design; Foundations must rest at or below the 36-inch frost depth per the City's Design Criteria, unless a code-approved exception applies; Construction may not commence until the permit is issued and posted on the property; permits become null and void after 365 days without an inspection. If your project isn't listed, confirm with City of Victor Building Department at 719-689-2284 before starting work.

No. The Building Permit Fee (covering building, plumbing, and mechanical work) uses the same valuation-based schedule for both residential and commercial projects. Only the electrical permit fee differs by building type -- commercial/nonresidential electrical work is billed under a valuation-based table rather than the flat square-footage table used for new residential buildings.

Victor does not publish a plan-review timeline for this permit. Contact City of Victor Building Department at 719-689-2284 for current turnaround.

You'll need: Building Permit Application; Engineering and Drawing Plan Sets (2 electronic sets each); Boundary Survey; Soils/Geotechnical Report (wet-stamped); Structural and Foundation Plans (wet-stamped); Plot/Site Plan with setbacks; COMcheck/Performance Energy Compliance Documentation; Electrical, Plumbing, and Mechanical Plans. See the required-documents checklist on this page for details on each.

Victor requires 4 inspection(s) for a commercial building permit (new construction & addition), in order: Foundation, Framing, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through City of Victor Building Department (719-689-2284).

Apply through City of Victor Building Department at 500 Victor Ave (also published as 500 W. Victor Ave.), PO Box 86, Victor, CO 80860. Phone: 719-689-2284. Office hours: Monday - Thursday: 8am to 5pm, Friday: 8am to Noon. The City contracts with Shums Coda Associates (ShumsCoda) as its Building Official for plan review and inspections; general/code-interpretation questions are directed to the Building Department main line above.. Official information: https://www.cityofvictor.com/building-department.

Victor, Colorado has adopted: 2012 International Building Code (IBC) — City of Victor Design Criteria document (Building Department page, 'Adopted Codes' section); 2012 International Residential Code (IRC); 2012 International Plumbing Code (IPC); 2012 International Mechanical Code (IMC); 2012 International Fuel Gas Code (IFGC); 2012 International Energy Conservation Code (IECC); 2014 National Electrical Code (NEC); Local amendments to the above codes are adopted by Ordinance No. 485; the Design Criteria document's direct link to the Ordinance No. 485 PDF (hosted on the City's legacy cityofvictor.com/downloads path) returned a connection error on re-check and could not be independently re-verified as still live — the amendment's EXISTENCE and code-cycle citation is confirmed via the current Design Criteria document itself (a live, actively-published Building Department resource), but its full text could not be retrieved during this pass.; Colorado Wildfire Resiliency Code: Ordinance No. 526 (adopted 3/19/2026) amends Chapter 18 of the Victor Municipal Code by adding a new Article 12 adopting the Colorado Wildfire Resiliency Code with local amendments — confirmed via the Municode Library's 'Adopted Ordinances Not Yet Codified' index for Victor, CO (ordinance not yet folded into the codified Chapter 18 text, which remains current only through Ordinance No. 511/2019 in the online codified view). This aligns with SB23-166's statewide Wildfire Resiliency Code Board mandate requiring local governments in the Wildland-Urban Interface to adopt minimum wildfire-resiliency structure-hardening and defensible-space standards by April 1, 2026.; The Design Criteria document (undated on-page, but the only live current-codes statement the Building Department publishes) is treated as the governing adopted-code list; it does not reference the 2024 code cycle used by some other Colorado jurisdictions in this corpus (e.g. Vail) — Victor's own document names 2012 I-Codes and 2014 NEC specifically, and no newer supersession was found on the Building Department, Building Permits, Ordinances and Resolutions, or Forms pages during this review.. Local amendments apply — see the Victor overview page for the full list.

No. Commercial projects use the same City of Victor Building Permit Application used for residential projects; the required plan/document set is determined by the Permit Requirement Quick Guide's COMMERCIAL CONSTRUCTION category rather than a different application form.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Victor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Victor.