Inspection sequence, scheduling, and re-inspection fees for building permits in Yuma, Colorado.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
320 South Main Street, Yuma, CO 80759 (mailing: PO Box 265, Yuma, CO 80759)
Phone
970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line)
Office hours
Monday to Friday, 8:00 a.m. to 5:00 p.m. (City Hall, 320 South Main Street)

Published scheduling rules

  • Required inspections must be requested one working day in advance (call 970-848-3878) (Building Permit (New Construction, Addition, Alteration, Repair))

Inspection sequence

Applies to: Building Permit (New Construction, Addition, Alteration, Repair)

  1. 1

    Inspections as required by scope of work

    Required inspections must be requested one working day in advance; the Building Inspector determines the specific inspection sequence (e.g. foundation, framing, rough trades, final) based on the project's class of work

  2. 2

    Final Inspection

    Completed work verified against approved permit and applicable code

Applies to: Demolition Permit

  1. 1

    Asbestos Inspection (State requirement, prior to City final inspection)

    Required statewide by CDPHE Air Pollution Control Division: the building/area to be demolished must be inspected for asbestos by a Colorado-certified asbestos inspector before demolition, independent of the City's own inspection process

  2. 2

    Final Inspection

    Site inspected following demolition to confirm work matches the approved City permit scope

Applies to: Re-Roof Permit

  1. 1

    Mid-Roof Inspection

    Onsite visit by the Building Inspector (call 970-630-7118 to schedule) OR submission of photos of all roof slopes and the building front once underlayment is installed, emailed or texted to building.inspector@yumacolo.org / 970-630-7118

  2. 2

    Final Roof Inspection

    In-person final inspection by the Building Inspector once the roof is completed; contractor notified of results via email or text

Applies to: Rooftop Solar / Photovoltaic Permit

  1. 1

    State Electrical Inspection

    Performed by the State Electrical Board (not a City inspector) to verify safe connection of the PV system

  2. 2

    Utility Interconnection Inspection/Verification

    City of Yuma Utilities verifies the meter socket and disconnect switch installation and confirms utility safety/operational requirements before allowing grid connection

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Yuma building permits

Get alerts for Yuma

We'll email you when Yuma's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.