Historic Preservation Alteration Certificate (Certificate of Appropriateness) — Yuma, Colorado · Requirements sheet
Reviewed 2026-08-02 · Source: https://library.municode.com/co/yuma/codes/municipal_code?nodeId=TIT16HIPR
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Historic Preservation Alteration Certificate (Certificate of Appropriateness) in Yuma, Colorado
Discovered on a dedicated 2026-08-02 adversarial re-verification pass: Municode TITLE 16 — HISTORIC PRESERVATION (Chapter 16.01, created by Ord. 1-2018) was never checked by any prior pass on this file — every source list previously jumped straight from Title 15 to Title 17. Title 16 creates a seven-member Historic Preservation Commission that issues Alteration Certificates for locally-designated historic structures, sites, and districts. Critically, §16.01.090.B states: 'The Building Department shall not issue a building permit for work on designated structures or features until an alteration certificate or exemption certificate has been obtained by the property owner' — a genuine, codified building-permit-blocking gate. However, this gate only binds properties that have gone through Yuma's own LOCAL historic-designation process (separate from listing on the National or State Register); the City's own Historic Preservation Committee webpage, read directly 2026-08-02, states 'there has not been a process in place for a local designation' and describes the Commission's current work as still an identification/planning phase, so this file could not confirm how many (if any) properties are currently subject to this gate in practice — the designated-properties list is kept at the Yuma Public Library (970-848-2368), not published online.
Reviewed 2026-08-02 · Source
When you need this permit
- This chapter only applies to a structure, site, or district that has gone through Yuma's LOCAL historic-designation process: nomination on City-provided forms (75% property-owner approval required for a district nomination), a Historic Preservation Commission public hearing held within 60 days of the nomination being deemed complete, a Commission decision within 30 days after the hearing concludes, and recording of the designation resolution with the Yuma County Clerk and Recorder (§§16.01.060, .070, .080)
- For a LOCALLY-DESIGNATED structure/site/feature: no construction, alteration, restoration, removal, or demolition may occur, and the Building Department will not issue a building permit for the work, until an Alteration Certificate (or a Certificate of Exemption) is obtained from the Commission (§16.01.090.A-B)
- File a 'Historic Preservation Committee Review Application (Request for a Certificate of Appropriateness)' with the Commission (c/o Yuma Public Library, PO Box 291, Yuma CO 80759, 970-848-2368) before starting work; the Commission meets the 3rd Monday of each month when there is something to review, with a submittal deadline of the last day of the month prior to the target meeting
- Required submittal items per the application form: detailed project description (scope, materials, design elements, colors), proof of ownership, historic and present photos of the property, a site plan (if applicable, showing access/property lines/setbacks/driveways/parking), and elevations with height indicated (if applicable)
- Administrative staff approval (without a full Commission hearing) is available for: repainting in approved colors, minor repairs that don't affect exterior appearance, normal maintenance, interior work, and pruning/removal of dead landscape materials (application form, page 2)
- The owner or authorized agent must be present at the HPC review hearing; an approved Alteration Certificate is valid for one year and void thereafter
- A Commission denial (or an approval with unacceptable conditions) may be appealed in writing to the City Council within 20 days of the Commission's decision (§16.01.090.G, §16.01.110)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Property access/inspection (as needed)
By submitting the application, the owner/agent consents to City Staff or their designees entering onto and inspecting the subject property at any reasonable time without obtaining prior consent (application form, page 1); no separate numbered inspection sequence is published
See the full Yuma inspection guide — scheduling & re-inspection fees →
Tips
- This gate does NOT apply to most properties in Yuma today — treat it as real but conditional/dormant-until-designated, not universal: the City's own Historic Preservation Committee webpage describes the Committee's current work as still an identification/planning-stage effort, even though the enabling ordinance (2018) and application form (2019) are both fully in place.
- Being listed on the National or State Register of Historic Places does NOT by itself trigger this gate — §16.01.070.B states such sites 'shall be deemed to qualify for local designation' but 'shall not be locally designated until an application for nomination is filed and processed' under this chapter, so a separate LOCAL designation must occur first.
- If it does apply, this gate blocks the ordinary Building Permit Application (documented in this file's residential-building-permit entry, which also governs commercial construction) until the Alteration Certificate or a Certificate of Exemption is obtained — confirmed directly from municipal code text, not inferred.
- For a commercial building specifically: 'Old Town Yuma' is referenced on the City's Historic Preservation Committee webpage in connection with a 'Historic Architectural Resource Survey,' suggesting downtown/commercial-core buildings are plausible future candidates for local designation — verify a specific commercial property's current designation status directly with the Yuma Public Library (970-848-2368) before assuming this gate does or doesn't apply.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Yuma
Look up this fee in a different city →
Now live
Build your Yuma project checklist
Describe your project once and get every permit, document, and fee it triggers in Yuma — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →