Skip to main content
PermitBase

Sign Permit in Yuma, Colorado

The City of Yuma's Resolution #46, Series of 2024 (Fee Schedule, effective 11/19/2024) lists a 'Sign Permit' as its own line item, billed 'Same as building permit fee' — confirmed by rendering the fee schedule's Building Permit Fees page to an image and reading it visually (the plain-text extraction wrapped this table's rows across multiple lines in a way that risked misreading which dollar figure belonged to which row). Beyond that one fee line, this file could not locate a dedicated Sign Code chapter, a standalone sign application form, or any sign-specific design/placement standards after full chasing: Municode/amlegal Title 17 (Zoning Regulations) was checked chapter-by-chapter (17.01 General Provisions, 17.02 Zoning Districts, 17.03 Rules and Definitions, 17.04 Use Regulations, 17.05 Conditional Uses and Variances, 17.06 Special Regulations, 17.07 Fence Regulations, 17.12 AID Airport Influence District) and none is titled or scoped to signs; the City's Permits and Forms webpage was checked directly and lists no sign-specific application PDF (only the general Building Permit Application, Excavation Permit Application, and Roofing/Siding/Window Requirements handout). Signs in Yuma therefore appear to be processed through the same general Building Permit Application used for every other project type in this file, billed at the general valuation-based fee schedule.

Verified 2026-08-14 · Source

When you need this permit

  • No dedicated Sign Permit application form is published separately from the City's general Building Permit Application after full chasing of the Permits and Forms webpage
  • No dedicated Sign Code chapter (design standards, height/area limits, illumination rules, exemptions) was located in Title 15 (Building and Construction) or Title 17 (Zoning Regulations) of the Municipal Code after a chapter-by-chapter check
  • The Resolution #46 Fee Schedule confirms a sign permit is required and is billed at the same rate as a building permit — implying the same general 'Class of Work' Building Permit Application process (New/Addition/Alteration/Repair/Move/Remove/Demolition checkboxes) applies, likely under 'Other' or 'Alteration,' since no distinct 'Sign' checkbox exists on that form
  • Confirm current sign-specific requirements (height, area, illumination, setback) directly with the Building Inspector (970-630-7118) or City Hall (970-848-3878) before finalizing a sign design, since no governing design-standard document could be located publicly

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Sign PermitResolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024 — confirmed by rendering the fee-schedule PDF page to an image and reading the 'Sign Permit / Same as building permit fee' row visually, since the plain-text extraction of this table wrapped rows in a way that risked a misread
Same as building permit fee: $100.00 minimum for valuation $1.00-$500.00; $100.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof) above $500.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Yuma?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Yuma inspection guide — scheduling & re-inspection fees →

    Tips

    • Don't look for a separate Sign Permit Application or printed sign code in Yuma — after full chasing, the only City-published sign-specific document found is the single 'Sign Permit — Same as building permit fee' line in the 2024 Fee Schedule. Call the Building Inspector (970-630-7118) directly to confirm the actual submittal process and any design standards before finalizing a sign design.
    • The fee figure on this entry was confirmed by visually rendering the fee-schedule PDF page — the plain-text extraction of this same table wrapped and reordered rows in a way that could otherwise cause a fee to be misattributed to the wrong permit type.

    Frequently asked questions

    Yuma requires a sign permit for: No dedicated Sign Permit application form is published separately from the City's general Building Permit Application after full chasing of the Permits and Forms webpage; No dedicated Sign Code chapter (design standards, height/area limits, illumination rules, exemptions) was located in Title 15 (Building and Construction) or Title 17 (Zoning Regulations) of the Municipal Code after a chapter-by-chapter check; The Resolution #46 Fee Schedule confirms a sign permit is required and is billed at the same rate as a building permit — implying the same general 'Class of Work' Building Permit Application process (New/Addition/Alteration/Repair/Move/Remove/Demolition checkboxes) applies, likely under 'Other' or 'Alteration,' since no distinct 'Sign' checkbox exists on that form; Confirm current sign-specific requirements (height, area, illumination, setback) directly with the Building Inspector (970-630-7118) or City Hall (970-848-3878) before finalizing a sign design, since no governing design-standard document could be located publicly. If your project isn't listed, confirm with City of Yuma Building Inspection / Code Enforcement at 970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line) before starting work.

    The same as the general Building Permit Fee: $100.00 minimum for valuation up to $500.00, then $100.00 plus $2.00 per additional $1,000.00 of valuation above that, per Resolution #46, Series of 2024.

    Yuma does not publish a plan-review timeline for this permit. Contact City of Yuma Building Inspection / Code Enforcement at 970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line) for current turnaround.

    You'll need: Building Permit Application (Sign scope). See the required-documents checklist on this page for details on each.

    Apply through City of Yuma Building Inspection / Code Enforcement at 320 South Main Street, Yuma, CO 80759 (mailing: PO Box 265, Yuma, CO 80759). Phone: 970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line), email: building.inspector@yumacolo.org. Office hours: Monday to Friday, 8:00 a.m. to 5:00 p.m. (City Hall, 320 South Main Street). Official information: https://cityofyuma.colorado.gov/building-inspection.

    Yuma, Colorado has adopted: 2015 International Building Code (IBC) — per the City's own 'Roofing, Siding and Window Requirements' handout ('All projects must conform to Chapter 15 of the 2015 IBC, IRC and ICC as specified'; Siding requirements cite '2015 IBC Chapter 14 section 1403'); this is the most current, actively-maintained City-published statement of adopted edition found after full chasing.; 2015 International Residential Code (IRC) — same source as above.; 2015 International Existing Building Code (IEBC) — RE-VERIFIED 2026-07-23 on a live primary source: Municode Chapter 15.28 (§15.28.010, 'Adopted') was read directly via the Browser pane (which renders Municode's Angular SPA server-side content client-side, unlike a plain fetch/curl request, which still returns only the app shell), current through Supplement No. 5 (codified through Ordinance No. 5-2025, adopted 4-15-2025; online content updated 7-25-2025). Full section text confirmed verbatim: 'There is hereby adopted by reference the International Existing Building Code, 2015 edition, as published by the International Code Council, as the Existing Building Code of the City of Yuma, Colorado, regulating and governing the repair, alteration, change of occupancy, addition and relocation of existing buildings...' (Ord. 17-2018, 2018). This closes the prior partial-confidence flag, which had relied only on a search-engine-indexed snippet rather than a directly re-read chapter body.; 2015 International Fire Code (IFC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.16 (§15.16.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Fire Code, 2015 edition, as published by the International Code Council, as the Fire Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) (administered by Fire Department, not modeled in this file's permitTypes).; 2015 International Property Maintenance Code (IPMC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.30 (§15.30.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Property Maintenance Code, 2015 edition...' (Ord. 17-2018, 2018) (administered by Code Enforcement, not modeled in this file's permitTypes).; Most recent International Plumbing Code (IPC) as adopted by the State of Colorado, adopted by reference by the City of Yuma — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.32 (§15.32.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the most recent International Plumbing Code, adopted by the State of Colorado, as published by the International Code Council, as the Plumbing Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) — confirming the City ties its plumbing code edition to whatever the State of Colorado has adopted rather than naming a fixed edition year itself; see localAmendments for why plumbing permits/inspections are administered by the State Plumbing Board (DORA/DPO), not the City, for Yuma jurisdiction.; 2015 International Energy Conservation Code (IECC), with the 2015 IECC/IRC Table R402.1.2/N1102.1.2 U-factor/SHGC table and the 2012 IECC/IRC Table R402.1.1/N1102.1.1 table both cited as applicable (values stated as identical between the two editions) in the City's 'Roofing, Siding and Window Requirements' handout, for window replacement energy compliance specifically.; 2023 National Electrical Code (NEC) as adopted by the Colorado State Electrical Board — City of Yuma does not run its own local electrical program (see localAmendments); wiring work is governed by whatever NEC edition the State Electrical Board has adopted, verify current edition directly with the State Electrical Board (dpo.colorado.gov/Electrical) at time of permit, since the City does not separately publish or amend an NEC edition of its own.; No newer code-edition cycle (e.g. 2018, 2021, or 2024 IBC/IRC family) is referenced anywhere on the City's Building Inspection page, Permits and Forms page, Roofing/Siding/Window Requirements handout, or Building Permit Application form after full chasing (page fetch via full-header curl, PDF text extraction, and Municode search-index snippet) — the City's actively-maintained public materials consistently cite the 2015 ICC family, so this file records 2015 IBC/IRC/IEBC/IFC/IPMC as the governing adopted editions rather than assuming a later cycle. RE-VERIFIED 2026-07-23 with a genuinely new avenue — the Municode Library's own live Supplement History Table (nodeId=SUHITA, read directly via the Browser pane) — confirms the CURRENT codification is Supplement No. 5 (online content updated 7-25-2025), which lists every ordinance considered for codification through Ordinance No. 5-2025 (adopted 4-15-2025) as either 'Included' or 'Omitted'; no ordinance postdating 4-15-2025 (including no Dec-2025-era ordinance) appears anywhere in that table, and a direct read of every Title 15 code-adoption chapter (15.04, 15.10, 15.12, 15.16, 15.24, 15.28, 15.30, 15.32, 15.36, 15.40, 15.41) confirms each still cites its original 2015-cycle edition (or, for Chapter 15.24, the 1997 UCADB), with the only post-2018 touch to any of these chapters being the identical, uniform Ord. No. 3-2025 (4-1-2025) penalty-cross-reference amendment applied chapter-by-chapter — not a code-edition update. This is a live, direct, chapter-by-chapter confirmation (not an inference from absence), and closes this line to full confidence: as of 2026-07-23, Yuma has adopted no newer I-code cycle than 2015.. Local amendments apply — see the Yuma overview page for the full list.

    No dedicated Sign Permit application form or Sign Code chapter was found after full chasing of the City's Permits and Forms page and the Municipal Code (Titles 15 and 17). The 2024 Fee Schedule confirms a Sign Permit is required and billed at the same rate as a building permit, implying it is processed through the same general Building Permit Application used for every other project type.

    Sources & verification

    Verified against official sources. Last reviewed 2026-08-14.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.