Building Permit (New Construction, Addition, Alteration, Repair) in Yuma, Colorado

City of Yuma issues a single general-purpose Building Permit Application covering new construction, additions, alterations, and repairs to residential structures, selected via a 'Class of Work' checkbox (New / Addition / Alteration / Repair / Move / Remove / Demolition) on one shared form. Reviewed under the 2015 IBC/IRC as adopted. No separate application exists per project type.

Verified 2026-07-06 · Source

When you need this permit

  • Complete the City of Yuma Building Permit Application, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition)
  • Provide owner name/address, contractor name and license number (where applicable to the trade), type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of project
  • Attach a sketch of the project if applicable (sketch-attached checkbox on the form)
  • Plans filed as required for the scope of work; the Building Inspector determines plan submittal requirements case by case (no separate published plan-submittal checklist was found distinct from the application form itself)
  • Required inspections must be requested one working day in advance (call 970-848-3878)
  • Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00Resolution #46, Series of 2024, City of Yuma Fee Schedule, effective 11/19/2024
$100.00
Building Permit Fee — valuation $501.00 and upResolution #46, Series of 2024
$100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof)
Penalty — work started prior to obtaining a building permitResolution #46, Series of 2024
$150.00

Review timeline

Plan review
Not published — contact the department

How long did your Building Permit (New Construction, Addition, Alteration, Repair) permit actually take in Yuma?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Inspections as required by scope of work

    Required inspections must be requested one working day in advance; the Building Inspector determines the specific inspection sequence (e.g. foundation, framing, rough trades, final) based on the project's class of work

  2. 2

    Final Inspection

    Completed work verified against approved permit and applicable code

See the full Yuma inspection guide — scheduling & re-inspection fees →

Tips

  • Yuma uses ONE Building Permit Application form for new construction, additions, alterations, repairs, moves, removals, and demolitions — select the correct 'Class of Work' checkbox rather than looking for a separate form per project type.
  • The City's fee schedule (2024) supersedes the older Uniform-Building-Code-era rate language pre-printed on the paper application form — use the current $100 minimum / $2.00-per-$1,000-above-$500 formula from Resolution #46, not the legacy form text.
  • Contractor license number is requested on the form but the City's Roofing/Siding/Window guidance states no contractor license is required for those specific trades — confirm with the Building Inspector (970-630-7118) whether your specific scope of work requires a licensed contractor. Contractor

Frequently asked questions

Yuma requires a building permit (new construction, addition, alteration, repair) for: Complete the City of Yuma Building Permit Application, selecting the applicable Class of Work checkbox (New, Addition, Alteration, Repair, Move, Remove, or Demolition); Provide owner name/address, contractor name and license number (where applicable to the trade), type of construction, occupancy group/division, zone, fire zone, zoning, and total estimated cost of project; Attach a sketch of the project if applicable (sketch-attached checkbox on the form); Plans filed as required for the scope of work; the Building Inspector determines plan submittal requirements case by case (no separate published plan-submittal checklist was found distinct from the application form itself); Required inspections must be requested one working day in advance (call 970-848-3878); Work must be commenced within 6 months of permit issuance or the permit becomes invalid; work suspended or abandoned for 1 year likewise invalidates the permit. If your project isn't listed, confirm with City of Yuma Building Inspection / Code Enforcement at 970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line) before starting work.

In Yuma, the published Building Permit Fee — valuation $1.00 to $500.00 is: $100.00. Additional published fees: Building Permit Fee — valuation $501.00 and up — $100.00 for the first $500.00 plus $2.00 for each additional $1,000.00 of valuation (or fraction thereof); Penalty — work started prior to obtaining a building permit — $150.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The City does not publish a numeric review-timeline commitment for building permits. Colorado is a home-rule state with no statewide review-time statute, and none of the City's public materials (Building Inspection page, Permits and Forms page, Building Permit Application, or 2024 Fee Schedule) state an SLA.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Yuma requires 2 inspection(s) for a building permit (new construction, addition, alteration, repair), in order: Inspections as required by scope of work, Final Inspection. Schedule each through City of Yuma Building Inspection / Code Enforcement (970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line)).

Apply through City of Yuma Building Inspection / Code Enforcement at 320 South Main Street, Yuma, CO 80759 (mailing: PO Box 265, Yuma, CO 80759). Phone: 970-848-3878 (City Hall); 970-630-7118 (Building Inspector direct line), email: building.inspector@yumacolo.org. Office hours: Monday to Friday, 8:00 a.m. to 5:00 p.m. (City Hall, 320 South Main Street). Official information: https://cityofyuma.colorado.gov/building-inspection.

Yuma, Colorado has adopted: 2015 International Building Code (IBC) — per the City's own 'Roofing, Siding and Window Requirements' handout ('All projects must conform to Chapter 15 of the 2015 IBC, IRC and ICC as specified'; Siding requirements cite '2015 IBC Chapter 14 section 1403'); this is the most current, actively-maintained City-published statement of adopted edition found after full chasing.; 2015 International Residential Code (IRC) — same source as above.; 2015 International Existing Building Code (IEBC) — RE-VERIFIED 2026-07-23 on a live primary source: Municode Chapter 15.28 (§15.28.010, 'Adopted') was read directly via the Browser pane (which renders Municode's Angular SPA server-side content client-side, unlike a plain fetch/curl request, which still returns only the app shell), current through Supplement No. 5 (codified through Ordinance No. 5-2025, adopted 4-15-2025; online content updated 7-25-2025). Full section text confirmed verbatim: 'There is hereby adopted by reference the International Existing Building Code, 2015 edition, as published by the International Code Council, as the Existing Building Code of the City of Yuma, Colorado, regulating and governing the repair, alteration, change of occupancy, addition and relocation of existing buildings...' (Ord. 17-2018, 2018). This closes the prior partial-confidence flag, which had relied only on a search-engine-indexed snippet rather than a directly re-read chapter body.; 2015 International Fire Code (IFC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.16 (§15.16.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Fire Code, 2015 edition, as published by the International Code Council, as the Fire Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) (administered by Fire Department, not modeled in this file's permitTypes).; 2015 International Property Maintenance Code (IPMC) — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.30 (§15.30.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the International Property Maintenance Code, 2015 edition...' (Ord. 17-2018, 2018) (administered by Code Enforcement, not modeled in this file's permitTypes).; Most recent International Plumbing Code (IPC) as adopted by the State of Colorado, adopted by reference by the City of Yuma — RE-VERIFIED 2026-07-23 by directly reading Municode Chapter 15.32 (§15.32.010, 'Adopted') via the Browser pane, current through Supplement No. 5: 'There is hereby adopted by reference the most recent International Plumbing Code, adopted by the State of Colorado, as published by the International Code Council, as the Plumbing Code of the City of Yuma, Colorado...' (Ord. 17-2018, 2018) — confirming the City ties its plumbing code edition to whatever the State of Colorado has adopted rather than naming a fixed edition year itself; see localAmendments for why plumbing permits/inspections are administered by the State Plumbing Board (DORA/DPO), not the City, for Yuma jurisdiction.; 2015 International Energy Conservation Code (IECC), with the 2015 IECC/IRC Table R402.1.2/N1102.1.2 U-factor/SHGC table and the 2012 IECC/IRC Table R402.1.1/N1102.1.1 table both cited as applicable (values stated as identical between the two editions) in the City's 'Roofing, Siding and Window Requirements' handout, for window replacement energy compliance specifically.; 2023 National Electrical Code (NEC) as adopted by the Colorado State Electrical Board — City of Yuma does not run its own local electrical program (see localAmendments); wiring work is governed by whatever NEC edition the State Electrical Board has adopted, verify current edition directly with the State Electrical Board (dpo.colorado.gov/Electrical) at time of permit, since the City does not separately publish or amend an NEC edition of its own.; No newer code-edition cycle (e.g. 2018, 2021, or 2024 IBC/IRC family) is referenced anywhere on the City's Building Inspection page, Permits and Forms page, Roofing/Siding/Window Requirements handout, or Building Permit Application form after full chasing (page fetch via full-header curl, PDF text extraction, and Municode search-index snippet) — the City's actively-maintained public materials consistently cite the 2015 ICC family, so this file records 2015 IBC/IRC/IEBC/IFC/IPMC as the governing adopted editions rather than assuming a later cycle. RE-VERIFIED 2026-07-23 with a genuinely new avenue — the Municode Library's own live Supplement History Table (nodeId=SUHITA, read directly via the Browser pane) — confirms the CURRENT codification is Supplement No. 5 (online content updated 7-25-2025), which lists every ordinance considered for codification through Ordinance No. 5-2025 (adopted 4-15-2025) as either 'Included' or 'Omitted'; no ordinance postdating 4-15-2025 (including no Dec-2025-era ordinance) appears anywhere in that table, and a direct read of every Title 15 code-adoption chapter (15.04, 15.10, 15.12, 15.16, 15.24, 15.28, 15.30, 15.32, 15.36, 15.40, 15.41) confirms each still cites its original 2015-cycle edition (or, for Chapter 15.24, the 1997 UCADB), with the only post-2018 touch to any of these chapters being the identical, uniform Ord. No. 3-2025 (4-1-2025) penalty-cross-reference amendment applied chapter-by-chapter — not a code-edition update. This is a live, direct, chapter-by-chapter confirmation (not an inference from absence), and closes this line to full confidence: as of 2026-07-23, Yuma has adopted no newer I-code cycle than 2015.. Local amendments apply — see the Yuma overview page for the full list.

No. The City uses a single Building Permit Application with a 'Class of Work' checkbox section (New, Addition, Alteration, Repair, Move, Remove, Demolition) rather than separate forms per project type.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.