EV Charger / Electric Vehicle Charging Station Permit in Yuma, Colorado
The City of Yuma has no dedicated EV charger/EVSE permit type or fee line. As with rooftop solar, the electrical portion of an EV charger installation (circuit wiring, panel/service upgrade, equipment) is permitted and inspected by the Colorado State Electrical Board (DORA/DPO), not the City's Building Inspector, since Yuma County does not appear on the State's list of counties with a local Electrical Inspection Program. A separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) may apply if the installation involves new construction (e.g., a carport or panel enclosure). No City of Yuma Utilities interconnection fee applies to an EV charger the way it does to solar, since a charger draws power rather than exporting it to the grid. Because Yuma County has no local electrical inspection program, the governing mechanism is the State Electrical Board's direct statutory authority under C.R.S. § 12-115-120(2): a state electrical inspector must inspect the work within three WORKING days of the inspection request (§ 12-115-120(2)(b)), and the Board sets its own fee based on actual inspection cost (§ 12-115-121(1)) rather than a published table. The Board's current rules (3 CCR 710-1) likewise publish no static fee schedule.
Verified 2026-07-20 · Source
When you need this permit
- Apply for the electrical permit covering EV charger circuit wiring and equipment installation directly through the Colorado State Electrical Board's Online Permitting System (dpo.colorado.gov/Electrical) — NOT through the City of Yuma's Building Inspector, which has no electrical-permitting jurisdiction here
- Work must comply with whichever NEC edition the Colorado State Electrical Board currently has adopted
- If the charger installation is bundled with new construction or a structural addition, a separate City of Yuma structural building permit (valuation-based, Resolution #46, Series of 2024) applies for that portion
- A homeowner may self-perform electrical work at their own residence and pull the State permit themselves; a hired Electrical Contractor is responsible for obtaining the permit if one is hired Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
No dedicated EV-specific fee tier exists; Show full citationHide
No dedicated EV-specific fee tier exists; same state-administered mechanism documented in the electrical-permit and rooftop-solar-pv-permit entries. The statutory reference point is § 12-115-121(2)(a)'s cap of $120 (base, CPI-adjusted annually since Jan 1, 2021) plus up to an 8% valuation-based surcharge, which governs LOCAL government fees — not the State Board's own direct-inspection fee for jurisdictions like Yuma CountyReview timeline
Inspection process
- 1
State Electrical Inspection
Scheduled directly with the assigned State Electrical Inspector (not the City of Yuma Building Inspector) after permit purchase, to verify the EV charger circuit and equipment installation
See the full Yuma inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply for EV charger electrical work through City of Yuma's Building Inspector — electrical work in Yuma is governed by the State Electrical Board, purchased through the State's own Online Permitting System, the same pathway documented in the electrical-permit and rooftop-solar-pv-permit entries.
- The governing statutory inspection timeline is C.R.S. § 12-115-120(2)(b) — a 3-working-day inspection turnaround after the request is filed — since Yuma County has no local electrical inspection program of its own.
- Unlike rooftop solar, an EV charger does not export power to the grid, so City of Yuma Utilities' $250/$500 interconnection processing fee and Facilities Interconnection Agreement do not apply to a standalone charger installation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yuma building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Yuma's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Yuma yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Yuma lands. Privacy.
Other permits in Yuma
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →