How to schedule
Inspections are requested through the building department below.
- Address
- 751 W. 4th Street, P.O. Box 13, Kuna, ID 83634
- Phone
- (208) 922-5546
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM; inspection requests must be submitted prior to 4:00 PM for next business day
- Website
- Official site
Published scheduling rules
- Inspection requests must be submitted prior to 4:00 PM to receive them the next business day; requests after 4 PM will not be scheduled for the following work day (Residential Building Permit)
- Schedule inspections online at portal.iworq.net/KUNA/permits/600 (Residential Building Permit)
- Inspection requests must be submitted prior to 4:00 PM for next business day scheduling — requests received after 4 PM will not be scheduled for the following work day (General)
- Inspections are scheduled online at portal.iworq.net/KUNA/permits/600 (General)
- 2026-07-16 rotation audit: all 6 permitTypes' fees, the statewide codesAdopted list, and department contact info re-verified live and updated where needed (see per-permitType notes); Municode city code and the iWorQ inspection portal were NOT independently re-fetched this session, so file-level lastVerified below is intentionally left unchanged pending that check (General)
Inspection sequence
Applies to: Commercial Building Permit
- 1
Foundation/Slab
Inspection of foundation prior to concrete pour
- 2
Framing/Rough-In
Structural framing, rough-in mechanical, electrical, and plumbing
- 3
Fire/Life Safety
Kuna Fire review for life safety compliance (separate from Building Department inspections)
- 4
Final
Final inspection of completed project for Certificate of Occupancy
Applies to: Residential Building Permit
- 1
Footing/Foundation
Inspection of footing and foundation prior to concrete pour
- 2
Framing
Inspection of framing, sheathing, and rough-in systems before insulation or drywall
- 3
Insulation
Inspection of insulation installation for energy compliance
- 4
Final
Final inspection of completed structure for Certificate of Occupancy
Applies to: Electrical Permit
- 1
Rough-In Electrical
Inspection of rough-in wiring before walls are closed
- 2
Final Electrical
Final inspection of all electrical installations
Applies to: EV Charger / EVSE Permit
- 1
Rough-In Electrical
Inspection of rough-in wiring/circuit before walls are closed, where applicable
- 2
Final Electrical
Final inspection of the completed EVSE circuit and breaker/disconnect per NEC Article 625
Applies to: Mechanical / HVAC Permit
- 1
Rough-In Mechanical
Inspection of mechanical rough-in prior to covering
- 2
Final Mechanical
Final inspection of mechanical installation
Applies to: Plumbing Permit
- 1
Rough-In Plumbing
Inspection of rough-in plumbing before walls are closed
- 2
Final Plumbing
Final inspection of all plumbing installations
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical / Racking
Racking attachment and rough electrical wiring inspected before panels are energized
- 2
Final Electrical
Final inspection of the completed electrical interconnection
Final inspection only: Demolition Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kuna building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kuna building permits
Get alerts for Kuna
We'll email you when Kuna's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.