Kuna building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Kuna, Idaho.
Last verified 2026-06-29 · Source · Embed this page’s badge · Version history
Building department
- Address
- 751 W. 4th Street, P.O. Box 13, Kuna, ID 83634
- Phone
- (208) 922-5546
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM; inspection requests must be submitted prior to 4:00 PM for next business day
- Website
- Official site
- Permit portal
- Apply online at Kuna's portal
Inspection guide
See how inspections work in Kuna — sequence, scheduling & re-inspection fees.
Codes adopted
Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.
- 2018 International Building Code (IBC) — adopted statewide per Idaho Building Code Act
- 2018 International Residential Code (IRC, Parts I, II, III and IX) — adopted statewide
- 2018 International Energy Conservation Code (IECC) — adopted statewide
- 2018 International Existing Building Code (IEBC) — adopted statewide
- 2018 International Mechanical Code (IMC) — adopted statewide
- 2018 International Fuel Gas Code (IFGC) — adopted statewide
- 2023 National Electrical Code (NEC/NFPA 70) — adopted via Idaho Electrical Board
- 2017 Idaho State Plumbing Code (ISPC) — based on 2015 Uniform Plumbing Code
- 2018 International Fire Code (IFC) — administered by Idaho Fire Marshal
Permit types & fees
Residential Building Permit
Required for new residential construction and certain improvements in Kuna, including new residences, mobile homes, accessory dwelling units, accessory structures over 200 sq ft, additions, decks over 30 inches above grade, retaining walls over 4 feet, fences, heating/cooling systems, and demolition. Submit plans by email to BuildingPermits@KunaID.gov (application and individual PDFs) plus construction plans (24x36) to Dropbox link provided by the Building Department after application is received. (Re-verified 2026-07-16: all fees, department contact info, and FAQs confirmed unchanged against live sources; Residential Permit Application PDF confirmed still dated Jan 2025.)
Commercial Building Permit
Required for new commercial structures, tenant improvements, change of occupancy, rooftop unit additions/replacements, fencing, and accessory structures over 120 square feet. Commercial submittals must be stamped by a licensed design professional. Civil plans require Public Works approval before submitting to the Building Department. Submit application and individual PDFs to CommercialPermits@KunaID.gov; construction plans (24x36) and engineering/structural calcs via Dropbox. Kuna Fire Department review is required and is a separate process. (Verified 2026-07-16: two additional plan-review-fee tiers found on the live fee schedule PDF and added below.)
Mechanical / HVAC Permit
Required for any mechanical equipment installation in Kuna. It is unlawful to perform any mechanical equipment installation without first obtaining a mechanical permit from the City of Kuna. Applies to residential and commercial work. (Verified 2026-07-16: re-rendered the live fee schedule PDF to image; the commercial/industrial ×0.02 formula is confirmed exact as printed, not drift — prior audit flag was a false alarm.)
Electrical Permit
Required for all electrical installations in Kuna. The Electrical Program exists to protect life, health, and property by ensuring electrical installations comply with the current safety codes. A permit must be obtained prior to commencement of work. Electrical permits are available at the City of Kuna Building Department. (Verified 2026-07-16: commercial/industrial/solar ×0.02 formula confirmed exact on the live fee schedule PDF, not drift; two additional fee tiers above $10,000 were found on the same table and added below.)
Solar Photovoltaic (PV) Permit
Required for rooftop or ground-mounted solar photovoltaic installations in Kuna. The City's own Electrical Program fee schedule (Resolution R74-2023A) explicitly bundles solar with commercial/industrial electrical work into a single tiered, contract-value-based fee category — 'Commercial/Industrial/Solar' — rather than pricing solar as its own separate line item or under the residential per-square-foot electrical tiers. Structural/racking attachment is reviewed under the general Building Permit.
EV Charger / EVSE Permit
Electric vehicle charging equipment (EVSE) installation in Kuna is an electrical installation, permitted through the City of Kuna Building Department's Electrical Program under the same Electrical Permit Application and Resolution R74-2023A fee schedule used for all other electrical work. The fee schedule has no distinct EV-charger/EVSE line item — a Level 2 EVSE circuit added to an existing residence is billed under the schedule's 'Existing Residence' branch-circuit tier, one installed with new construction falls under the New Single Family Dwelling square-footage tier, and a standalone commercial charging station is billed under the same 'Commercial/Industrial/Solar' contract-value tier used for solar and other commercial electrical work.
Plumbing Permit
Required for all plumbing installations in Kuna. The Plumbing Program ensures plumbing practices comply with the Idaho State Plumbing Code (based on the Uniform Plumbing Code). A plumbing permit must be obtained prior to any commencement of work. Plumbing permits are available at the City of Kuna Building Department. (Verified 2026-07-16: commercial/industrial ×0.02 formula confirmed exact on the live fee schedule PDF, not drift; two additional fee tiers above $10,000 were found on the same table and added below.)
Demolition Permit
Required for demolition or relocation of structures in Kuna. A separate demolition permit must be obtained before commencing demolition work. (Re-verified 2026-07-16: $30 fee and Jan 2025 application-form date both confirmed unchanged on live sources.)
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 150units
150 buildings · $30.1M valuation
- Trailing 12 months
- 1,369units
12 of 12 months reported · #4 in Idaho coverage by units
- Year to date (2026 YTD through 2026-05)
- 690units
667 buildings · $144.7M valuation
5 month(s) reported to Census
- Full year 2025
- 1,208units
1,069 buildings · $257.8M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity
Tips & gotchas
- Inspection requests must be submitted prior to 4:00 PM for next business day scheduling — requests received after 4 PM will not be scheduled for the following work day
- All plans, permit inspection record, and applicable calculations must be on-site for all inspections
- Construction is prohibited during quiet hours (11:00 PM to 7:00 AM) per Kuna City Code 10-6-3
- Sites must be cleaned nightly during construction
- Permits must be picked up within 180 days of issuance or will be voided out
- Work must commence or resume within 180 days or the permit becomes invalid
- Residential submittals: email individual PDFs then submit construction plans (24x36) to a Dropbox folder provided after application is received
- Commercial submittals require Kuna Fire Department payment certification AND ACHD impact fee payment receipt before permit can be picked up — factor in processing time for both agencies
- Detached storage buildings under 200 sq ft are exempt from building permits; commercial accessory structures under 120 sq ft are exempt
- Inspections are scheduled online at portal.iworq.net/KUNA/permits/600
- City is closed on: New Year's Day, Human Rights Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and the day after, and Christmas Day — no inspections performed on these days
- 2026-07-16 rotation audit: all 6 permitTypes' fees, the statewide codesAdopted list, and department contact info re-verified live and updated where needed (see per-permitType notes); Municode city code and the iWorQ inspection portal were NOT independently re-fetched this session, so file-level lastVerified below is intentionally left unchanged pending that check