Demolition Permit in Kuna, Idaho

Required for demolition or relocation of structures in Kuna. A separate demolition permit must be obtained before commencing demolition work. (Re-verified 2026-07-16: $30 fee and Jan 2025 application-form date both confirmed unchanged on live sources.)

Verified 2026-07-16 · Source

When you need this permit

  • Demolition permit required before commencing demolition of any structure
  • Submit Demolition Permit Application (PDF) to the Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeePer fee schedule
$30

Review timeline

Plan reviewTypical estimate — confirm current times with the Kuna building department
~1–5 business days

How long did your Demolition Permit permit actually take in Kuna?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Demolition

    Final inspection confirming complete demolition and site preparation

See the full Kuna inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition permit required in addition to building permit if structure is to be replaced

Frequently asked questions

Kuna requires a demolition permit for: Demolition permit required before commencing demolition of any structure; Submit Demolition Permit Application (PDF) to the Building Department. If your project isn't listed, confirm with City of Kuna Building Department at (208) 922-5546 before starting work.

In Kuna, the published Demolition Permit Fee is: $30. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a demolition permit in Kuna typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with City of Kuna Building Department at (208) 922-5546.

You'll need: Demolition Permit Application (PDF). See the required-documents checklist on this page for details on each.

Kuna requires 1 inspection(s) for a demolition permit, in order: Final Demolition. Schedule each through City of Kuna Building Department ((208) 922-5546).

Apply through City of Kuna Building Department at 751 W. 4th Street, P.O. Box 13, Kuna, ID 83634. Phone: (208) 922-5546, email: BuildingPermits@KunaID.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM; inspection requests must be submitted prior to 4:00 PM for next business day. Official information: https://kunacity.id.gov/119/Building-Department.

Kuna, Idaho has adopted: 2018 International Building Code (IBC) — adopted statewide per Idaho Building Code Act; 2018 International Residential Code (IRC, Parts I, II, III and IX) — adopted statewide; 2018 International Energy Conservation Code (IECC) — adopted statewide; 2018 International Existing Building Code (IEBC) — adopted statewide; 2018 International Mechanical Code (IMC) — adopted statewide; 2018 International Fuel Gas Code (IFGC) — adopted statewide; 2023 National Electrical Code (NEC/NFPA 70) — adopted via Idaho Electrical Board; 2017 Idaho State Plumbing Code (ISPC) — based on 2015 Uniform Plumbing Code; 2018 International Fire Code (IFC) — administered by Idaho Fire Marshal. Local amendments apply — see the Kuna overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kuna building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.