Demolition Permit in City of St. Maries, Idaho
Required for demolition of commercial or residential structures within St. Maries, via a dedicated Demolition Permit Application distinct from the general Building Permit Application. Covers interior-only, partial, or complete demolition, and structures with or without a basement.
Verified 2026-07-19 · Source
When you need this permit
- Submit the completed Demolition Permit Application and fee (cash or check) to City Hall, 602 College Avenue — Demolition Permit Application.
- A site plan is required for a complete demolition and/or if the structure has a basement; a floor plan showing the specific location and scope of work is required for a partial or interior-only demolition — Demolition Permit Application.
- Applicant must contact City Hall both before starting and upon completion of demolition; demolition must be completed within 120 days of the issued permit date — Demolition Permit Application.
- If the structure has a connection to the City water and wastewater system, City Public Works must inspect and preserve/protect the existing sewer and water line before demolition begins — schedule via City Hall, (208) 245-2577.
- Applicant is advised they may need to separately contact the U.S. Environmental Protection Agency (EPA) regarding possible asbestos-containing materials on site — Demolition Permit Application.
- A field survey is NOT required for demolition-only work, per the general Building Permit survey-exception at St. Maries City Code 9-2-1(A)(2)(a).
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sewer/Water Line Preserve and Protect Inspection
Required before demolition begins if the structure is connected to the City water and wastewater system; scheduled with City Public Works via City Hall. The Demolition Permit Application itself includes a sign-off line: 'Preserve/Protect Inspected and Approved By.'
See the full City of St. Maries inspection guide — scheduling & re-inspection fees →
Tips
- Demolition must be completed within 120 days of the issued permit date — Demolition Permit Application.
- Unlike a standard Building Permit, no licensed-surveyor field survey is required for demolition-only work — St. Maries City Code 9-2-1(A)(2)(a).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of St. Maries building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of St. Maries
Demolition Permit in other cities
Compare demolition permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your City of St. Maries project checklist
Describe your project once and get every permit, document, and fee it triggers in City of St. Maries — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →