Boundary Structure Permit (Fences and Retaining Walls) — City of St. Maries, Idaho · Requirements sheet
Verified 2026-07-19 · Source: https://codelibrary.amlegal.com/codes/saintmariesid/latest/saintmaries_id/0-0-0-1676
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Boundary Structure Permit (Fences and Retaining Walls) in City of St. Maries, Idaho
Required for construction, extension, or alteration (other than routine maintenance) of a boundary structure — defined as a fence, retaining wall, or other such structure located on or within 10 feet of a city street or alley — within St. Maries city limits. Unlike a general Building Permit, a Boundary Structure Permit is issued by the City Clerk rather than the Building Inspector, per St. Maries City Code 9-2-1(B). Trees and hedges are not considered boundary structures and do not require this permit.
Verified 2026-07-19 · Source
When you need this permit
- Required for any fence, retaining wall, or similar structure located on or within 10 feet of a city street or alley — St. Maries City Code 9-2-1(B), (D).
- A field survey in accordance with 9-2-1(A)(1) is generally required, unless an original licensed-surveyor corner marking is already in place and visible, or the property owner signs a liability waiver acknowledging potential city right-of-way encroachment and agreeing to remove the structure if later found to encroach — St. Maries City Code 9-2-1(B)(1)-(2).
- If a field survey is provided showing the structure entirely on the owner's property, the City Clerk shall issue the permit; if no survey is provided or the structure is shown encroaching on the right-of-way, the City Clerk may only issue the permit if the owner signs the liability waiver AND the City Clerk determines the structure will not interfere with sight lines, street maintenance, snow removal, or utility maintenance/monitoring — St. Maries City Code 9-2-1(B)(3).
- A denied Boundary Structure Permit may be appealed to City Council at its next regularly scheduled meeting — St. Maries City Code 9-2-1(B)(3)(c).
- Each boundary structure waiver/acknowledgement/removal agreement must be recorded by the City Clerk within 30 days of permit approval and runs with the land — St. Maries City Code 9-2-1(B)(3)(d).
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full City of St. Maries inspection guide — scheduling & re-inspection fees →
Tips
- This is a genuinely distinct permit and approval pathway from the standard Building Permit — it is issued by the City Clerk, not the Building Inspector, and has its own survey-exception and right-of-way-encroachment review criteria under St. Maries City Code 9-2-1(B).
- Trees and hedges are explicitly excluded from the 'boundary structure' definition and do not require this permit — St. Maries City Code 9-2-1(D).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of St. Maries building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of St. Maries
Compare boundary structure permit (fences and retaining walls) fees across Idaho →
Look up this fee in a different city →
Now live
Build your City of St. Maries project checklist
Describe your project once and get every permit, document, and fee it triggers in City of St. Maries — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →