Building Permit — City of St. Maries, Idaho · Requirements sheet
Verified 2026-07-19 · Source: https://cityofstmaries.org/building-department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Building Permit in City of St. Maries, Idaho
Required for construction, improvement, extension, alteration, or other action regulated by the city-adopted building codes, within St. Maries city limits — St. Maries City Code 9-2-1(A). The single Building Permit Application covers a broad range of project types (the form's 'Building Type' checkboxes include Commercial, Single Family Dwelling, Duplex, Garage, Town Home, Multi-Family Dwelling, Shop, Shed, and Other) and 'Scope of Work' options (New Build, Addition, Remodel, Reroof, Change of Use, Other). Fees are valuation-based per the City's adopted Fee Schedule.
Verified 2026-07-19 · Source
When you need this permit
- Unlawful to construct, improve, extend, or alter any structure requiring a building permit within St. Maries city limits without first procuring the permit — St. Maries City Code 9-2-1(A).
- A written statement from a licensed surveyor, certifying a completed field survey with property corners located and marked, must be submitted with the application, unless the work is demolition-only, is fully contained within the existing building envelope, or an acceptable prior survey with visible original corner markers already exists — St. Maries City Code 9-2-1(A)(1)-(2).
- No building permit shall be issued until all city requirements for extension of streets, water, and sewer are complied with — St. Maries City Code 9-2-4.
- Architectural drawings sufficient to meet a recognized financial lending agency's requirements are required for all building permit applications not concerning a simple boundary structure (fence/wall) — St. Maries City Code 9-2-2(A).
- A survey plat completed and filed by a licensed surveyor, with property pins visibly positioned (and, where appropriate, sewer/water hookup points and structure location shown), must accompany the application — St. Maries City Code 9-2-2(B).
- Separate electrical, plumbing, and mechanical permits are required — noted as an 'Important Notice' on the Building Permit Application; the City's own Fee Schedule does not list separate city-issued electrical/plumbing/mechanical permit fee lines, consistent with these trade permits being administered outside the City Building Department (commonly via the state) rather than confirmed as separately city-issued.
- Initial applications may require review by the Planning and Zoning Commission for compliance with Title 11 (Zoning and Subdivisions) of the city code — St. Maries City Code 9-2-2(E).
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Designated Points of Construction
St. Maries City Code 9-2-6 requires the Building Inspector to inspect the structure at 'designated points of construction as set forth in the building code adopted by the city,' and prohibits construction from proceeding beyond each designated inspection point until the inspection is completed and signified on the building permit. The city code does not separately enumerate a discrete checklist (e.g., footing/framing/final) beyond this general requirement as of 2026-07-19; the adopted 2018 IBC/IRC govern the specific inspection points.
- 2
Final / Certificate of Compliance
A Certificate of Compliance (a copy of the signed and dated inspection record) is issued once the Building Inspector is satisfied all codes and requirements are met, and must be issued prior to use and/or occupancy — St. Maries City Code 9-2-8.
See the full City of St. Maries inspection guide — scheduling & re-inspection fees →
Tips
- The permit becomes null and void if work is not commenced within 180 days of issuance, or if work is suspended/abandoned for 180 days at any point after commencement, unless the City grants a written extension — Building Permit Application, page 2 ('Expiration and Abandonment').
- No changes to submitted plans or additional work are permitted without prior written approval from the City — Building Permit Application, page 2 ('Plan Alterations').
- Any person may appeal a Building Inspector action to the Administration Committee, in writing, within ten (10) days of the action; the Committee's decision may then be appealed to the full City Council within thirty (30) days — St. Maries City Code 9-2-9.
- Roof drains may not be connected to the city sanitary sewer system; doing so is a building-code violation subject to civil and criminal penalties — St. Maries City Code 9-2-7.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of St. Maries building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of St. Maries
Building Permit in other cities
Compare building permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your City of St. Maries project checklist
Describe your project once and get every permit, document, and fee it triggers in City of St. Maries — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →