Skip to main content
PermitBase

City of St. Maries building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in City of St. Maries, Idaho.

Verified 2026-07-19 · Source

How to schedule

Inspections are requested through the building department below.

Address
602 College Avenue, St. Maries, ID 83861
Phone
(208) 245-2577
Office hours
Monday-Thursday 8:00 AM to 5:00 PM; Friday 8:00 AM to 3:00 PM, per City of St. Maries Building Department and Forms pages.

Inspection sequence

Applies to: Building Permit

  1. 1

    Designated Points of Construction

    St. Maries City Code 9-2-6 requires the Building Inspector to inspect the structure at 'designated points of construction as set forth in the building code adopted by the city,' and prohibits construction from proceeding beyond each designated inspection point until the inspection is completed and signified on the building permit. The city code does not separately enumerate a discrete checklist (e.g., footing/framing/final) beyond this general requirement as of 2026-07-19; the adopted 2018 IBC/IRC govern the specific inspection points.

  2. 2

    Final / Certificate of Compliance

    A Certificate of Compliance (a copy of the signed and dated inspection record) is issued once the Building Inspector is satisfied all codes and requirements are met, and must be issued prior to use and/or occupancy — St. Maries City Code 9-2-8.

Applies to: Electric Vehicle (EV) Charging Station Permit

  1. 1

    Electrical Rough-In / Final

    Charger circuit, disconnect, and any panel work inspected per the 2017 NEC as locally adopted; no EV-specific inspection checklist is separately published by the City, so this follows the general Building Permit inspection framework at St. Maries City Code 9-2-6.

  2. 2

    Final / Certificate of Compliance

    Certificate of Compliance issued once the Building Inspector is satisfied all codes and requirements are met, per St. Maries City Code 9-2-8 — applied to EV charger installations the same as any other building permit.

Applies to: Residential/Commercial Solar Photovoltaic (PV) Permit

  1. 1

    Electrical Rough-In / Interconnection

    Panel, disconnect, and interconnection wiring inspected per the 2017 NEC as locally adopted; no solar-specific inspection checklist is separately published by the City, so this follows the general Building Permit inspection framework at St. Maries City Code 9-2-6.

  2. 2

    Final / Certificate of Compliance

    Certificate of Compliance issued once the Building Inspector is satisfied all codes and requirements are met, per St. Maries City Code 9-2-8 — applied to solar PV the same as any other building permit.

Final inspection only: Demolition Permit

Re-inspection fees

Building PermitReinspection — 1st reinspection · City Fee Schedule, Table 3. A reinspection is an inspection following a failed inspection; the fee schedule permits one (1) failed inspection per required inspection.
$0
Building PermitReinspection — 2nd and subsequent reinspection · City Fee Schedule, Table 3.
$50.00 or 10% of the Building Permit fee, whichever is lower

City of St. Maries building permits

Get alerts for City of St. Maries

We'll email you when City of St. Maries's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.