Required for moving a structure from one site to another, or destruction/demolition of a structure for disposal, in Hailey. Structures built wholly or in part before 1941 are treated as "historic structures" and trigger an additional 120-day review process before a demolition permit can be issued.

Verified 2026-07-07 · Source

When you need this permit

  • Permit application must include owner, address, property description, phone number, description of scope, and time frame
  • Acknowledgment of the demolition by utility companies, the Blaine County Assessor's office, and the building official (if other than City of Hailey) is required
  • For historic structures (built wholly or in part before 1941): application is routed to Hailey Planning, Fire Department, and the Hailey Arts and Historic Preservation Commission for a 120-day review
  • Applicant must demonstrate the building's age using reliable records (e.g., Blaine County Assessor records)
  • Following demolition, the site must be revegetated with drought-resistant grasses/shrubs within one month, including noxious weed abatement

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition PermitFY2026 Hailey Municipal Fee Schedule, effective October 1, 2025 (up from $155 in FY2025)
$160
Historic Demolition Permit — base feeFY2026 Hailey Municipal Fee Schedule, effective October 1, 2025
$163, plus $57 publication cost and $38 onsite posting per notice

Review timeline

Plan reviewHailey’s published plan-review target
1–120 business days

How long did your Demolition Permit permit actually take in Hailey?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Hailey inspection guide — scheduling & re-inspection fees →

    Tips

    • Demolition permits are only valid for 90 days.
    • Any structure built wholly or in part before 1941 is treated as a 'historic structure' and requires a mandatory 120-day interagency review (Planning, Fire, Arts and Historic Preservation Commission) before the permit can issue — this 120-day period is set explicitly in Hailey Municipal Code 15.08.020(A)(5) and can only be shortened under specific findings (economic infeasibility, relocation, dangerous-building designation, or Commission recommendation).
    • Revegetation of the demolished site (drought-resistant grasses/shrubs, noxious weed abatement) is required within one month of permitted work.

    Frequently asked questions

    Hailey requires a demolition permit for: Permit application must include owner, address, property description, phone number, description of scope, and time frame; Acknowledgment of the demolition by utility companies, the Blaine County Assessor's office, and the building official (if other than City of Hailey) is required; For historic structures (built wholly or in part before 1941): application is routed to Hailey Planning, Fire Department, and the Hailey Arts and Historic Preservation Commission for a 120-day review; Applicant must demonstrate the building's age using reliable records (e.g., Blaine County Assessor records); Following demolition, the site must be revegetated with drought-resistant grasses/shrubs within one month, including noxious weed abatement. If your project isn't listed, confirm with City of Hailey Community Development Department — Building Services at (208) 788-9815 before starting work.

    In Hailey, the published Demolition Permit is: $160. Additional published fees: Historic Demolition Permit — base fee — $163, plus $57 publication cost and $38 onsite posting per notice. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    For structures built wholly or in part before 1941, Hailey Municipal Code requires a 120-day interagency review period (Planning, Fire, and the Arts and Historic Preservation Commission) before a demolition permit can be issued, running from the date the application is transmitted to those departments. This period may be shortened only under specific findings set out in the code.

    You'll need: Demolition Permit Application. Depending on your project, Hailey may also ask for: Historic Structure Documentation. See the required-documents checklist on this page for details on each.

    Apply through City of Hailey Community Development Department — Building Services at 115 S Main Street, Hailey, ID 83333. Phone: (208) 788-9815, email: yadira.ward@haileycityhall.org. Office hours: Mon–Thu 9:00 AM – 5:00 PM; Fri 9:00 AM – 12:00 PM (closed weekends and holidays). Official information: https://haileycityhall.org/community-development/building-services/.

    Hailey, Idaho has adopted: 2018 International Building Code (IBC), as amended by the Idaho Building Code Board, including new Appendix O (Radon Control Methods); 2018 International Residential Code (IRC), Parts I–III and IX, as amended by the Idaho Building Code Board, including Appendix F (Radon Control Methods), Appendix Q (Tiny Houses), and Appendix T (Solar Ready Provisions — Detached One- and Two-Family Dwellings and Townhouses); 2018 International Energy Conservation Code (IECC), as amended by the Idaho Building Code Board; 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Existing Building Code (IEBC), as amended by the Idaho Building Code Board; Idaho State Plumbing Code (ISPC), as adopted and amended by the Idaho Plumbing Board — required plumbing fixture counts per IBC Table 2902.1; National Electrical Code (NEC), latest edition approved by the Idaho Electrical Board — administered and inspected by the State of Idaho, not the City of Hailey. Local amendments apply — see the Hailey overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-07.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.