Required for erecting, constructing, enlarging, altering, repairing, moving, improving, removing, converting, or demolishing any part of a building in Hailey, including new single-family and multi-family residential construction, commercial construction, and residential remodels. Painting, residing, and replacing floor coverings are exempt; window replacement requires a permit.

Verified 2026-07-07 · Source

When you need this permit

  • New construction (commercial, single-family residential, or multi-family residential)
  • Remodels (commercial or residential)
  • Garages, basements, carports, foundations
  • Accessory structures over 120 square feet (sheds, decks, pergolas, porches)
  • Window replacement
  • Construction documents must be submitted electronically for residential projects; two or more paper sets for commercial projects, prepared by an Idaho-licensed architect or structural engineer where required

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation $1 to $500Hailey Building Permit Fee Table 1-A, effective October 1, 2025
$27.78
Building Permit — valuation $501 to $2,000
$27.78 for the first $500, plus $3.23 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $25,000
$124.23 for the first $2,000, plus $19.65 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001 to $50,000
$556.84 for the first $25,000, plus $12.93 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001 to $100,000
$915.03 for the first $50,000, plus $5.74 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,000
$1,412.52 for the first $100,000, plus $7.11 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,000
$4,596.45 for the first $500,000, plus $6.14 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation $1,000,001 and up
$7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof
Plan Check FeePer Hailey Municipal Fee Schedule effective October 1, 2025 and confirmed on the Building Permit Application (rev. 12/01/2025)
67% of the base Building Permit Fee
Planning Review FeePer Building Permit Application (rev. 12/01/2025)
34% of the Plan Check Fee
Hailey Fire Dept. Plan Review FeePer Hailey Municipal Fee Schedule effective October 1, 2025 and the Building Permit Application (rev. 12/01/2025)
44% of the Plan Check Fee, where applicable
Development Impact Fee — new single-family dwelling, 600 sq ft or less net floor areaDevelopment Impact Fee Schedule effective 12/01/2025; scales up to $12,465 per unit for 3,001+ sq ft
$3,464 per dwelling unit (Parks & Recreation $898 + Circulation $1,407 + Fire $1,018 + Police $141)
Hailey Clean Energy Deposit — new single-family, ADU associated with new construction, or townhomeClean Energy Deposit Fee effective 05/18/2022, confirmed at $1,288 in the FY2026 Municipal Fee Schedule
$1,288.00 flat
Building Permit Extension (180-day extension)FY2026 Hailey Municipal Fee Schedule; up to 4 extensions permitted
$170

Review timeline

Plan reviewHailey’s published plan-review target
10–10 business days

How long did your Building Permit (New Construction, Additions, Remodels) permit actually take in Hailey?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footings

    Before concrete pour — verify forms, rebar, and anchor bolts meet 24-inch minimum frost depth

  2. 2

    Framing

    After framing and rough-in trades are complete, before insulation or wall cover

  3. 3

    Insulation / Energy

    Insulation and IECC Climate Zone 16 compliance verified before drywall

  4. 4

    Final

    All work complete per approved plans, ready for occupancy

See the full Hailey inspection guide — scheduling & re-inspection fees →

Tips

  • Idaho Code 39-4117 (effective 2025) requires a local government to determine whether a residential building permit application is complete within 10 business days of receipt (20 business days for commercial); this is a completeness-review timeframe, not a full plan-approval SLA — Hailey has not published its own full plan-review-to-issuance turnaround time.
  • Electrical and plumbing permits/inspections in Hailey are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City — schedule DOPL inspections at 1-208-332-4700 or edopl.idaho.gov/OnlineServices.
  • Hailey's fee schedule folds the plan check fee (67%), planning review fee (34% of plan check), and fire department review fee (44% of plan check, where applicable) on top of the base Table 1-A permit fee — budget for all four line items.
  • Original permits are valid for 548 days; a maximum of four 180-day extensions are allowed; a permit becomes null and void if inspections have not been completed for 180 days.
  • The Hailey Clean Energy Deposit ($1,288 flat for new single-family/ADU/townhome) is separate from and in addition to the Development Impact Fee.

Frequently asked questions

Yes. Hailey requires a permit to erect, construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any part of a building. Painting, residing, and floor covering replacement are exempt, but window replacement does require a permit.

In Hailey, the published Building Permit — valuation $1 to $500 is: $27.78. Additional published fees: Building Permit — valuation $501 to $2,000 — $27.78 for the first $500, plus $3.23 for each additional $100 or fraction thereof, to and including $2,000; Building Permit — valuation $2,001 to $25,000 — $124.23 for the first $2,000, plus $19.65 for each additional $1,000 or fraction thereof, to and including $25,000; Building Permit — valuation $25,001 to $50,000 — $556.84 for the first $25,000, plus $12.93 for each additional $1,000 or fraction thereof, to and including $50,000; Building Permit — valuation $50,001 to $100,000 — $915.03 for the first $50,000, plus $5.74 for each additional $1,000 or fraction thereof, to and including $100,000; Building Permit — valuation $100,001 to $500,000 — $1,412.52 for the first $100,000, plus $7.11 for each additional $1,000 or fraction thereof, to and including $500,000; Building Permit — valuation $500,001 to $1,000,000 — $4,596.45 for the first $500,000, plus $6.14 for each additional $1,000 or fraction thereof, to and including $1,000,000; Building Permit — valuation $1,000,001 and up — $7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof; Plan Check Fee — 67% of the base Building Permit Fee; Planning Review Fee — 34% of the Plan Check Fee; Hailey Fire Dept. Plan Review Fee — 44% of the Plan Check Fee, where applicable; Development Impact Fee — new single-family dwelling, 600 sq ft or less net floor area — $3,464 per dwelling unit (Parks & Recreation $898 + Circulation $1,407 + Fire $1,018 + Police $141); Hailey Clean Energy Deposit — new single-family, ADU associated with new construction, or townhome — $1,288.00 flat; Building Permit Extension (180-day extension) — $170. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Idaho Code 39-4117 requires the City to determine whether a residential application is complete within 10 business days of submission (20 business days for commercial). The City of Hailey has not published a separate full plan-review-to-approval timeframe beyond this statutory completeness-review requirement.

You'll need: Application for Building Permit; Construction Drawings; Zoning Review Checklist. Depending on your project, Hailey may also ask for: Floodplain Development Permit Application. See the required-documents checklist on this page for details on each.

Hailey requires 4 inspection(s) for a building permit (new construction, additions, remodels), in order: Foundation / Footings, Framing, Insulation / Energy, Final. Schedule each through City of Hailey Community Development Department — Building Services ((208) 788-9815).

Apply through City of Hailey Community Development Department — Building Services at 115 S Main Street, Hailey, ID 83333. Phone: (208) 788-9815, email: yadira.ward@haileycityhall.org. Office hours: Mon–Thu 9:00 AM – 5:00 PM; Fri 9:00 AM – 12:00 PM (closed weekends and holidays). Official information: https://haileycityhall.org/community-development/building-services/.

Hailey, Idaho has adopted: 2018 International Building Code (IBC), as amended by the Idaho Building Code Board, including new Appendix O (Radon Control Methods); 2018 International Residential Code (IRC), Parts I–III and IX, as amended by the Idaho Building Code Board, including Appendix F (Radon Control Methods), Appendix Q (Tiny Houses), and Appendix T (Solar Ready Provisions — Detached One- and Two-Family Dwellings and Townhouses); 2018 International Energy Conservation Code (IECC), as amended by the Idaho Building Code Board; 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Existing Building Code (IEBC), as amended by the Idaho Building Code Board; Idaho State Plumbing Code (ISPC), as adopted and amended by the Idaho Plumbing Board — required plumbing fixture counts per IBC Table 2902.1; National Electrical Code (NEC), latest edition approved by the Idaho Electrical Board — administered and inspected by the State of Idaho, not the City of Hailey. Local amendments apply — see the Hailey overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Compare building permit (new construction, additions, remodels) fees across Idaho

Look up this fee in a different city →

Embed this data card →

Now live

Build your Hailey project checklist

Describe your project once and get every permit, document, and fee it triggers in Hailey — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

Get started →