Building Permit (New Construction, Additions, Remodels) — Hailey, Idaho · Requirements sheet
Verified 2026-07-07 · Source: https://haileycityhall.org/community-development/building-services/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Building Permit (New Construction, Additions, Remodels) in Hailey, Idaho
Required for erecting, constructing, enlarging, altering, repairing, moving, improving, removing, converting, or demolishing any part of a building in Hailey, including new single-family and multi-family residential construction, commercial construction, and residential remodels. Painting, residing, and replacing floor coverings are exempt; window replacement requires a permit.
Verified 2026-07-07 · Source
When you need this permit
- New construction (commercial, single-family residential, or multi-family residential)
- Remodels (commercial or residential)
- Garages, basements, carports, foundations
- Accessory structures over 120 square feet (sheds, decks, pergolas, porches)
- Window replacement
- Construction documents must be submitted electronically for residential projects; two or more paper sets for commercial projects, prepared by an Idaho-licensed architect or structural engineer where required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footings
Before concrete pour — verify forms, rebar, and anchor bolts meet 24-inch minimum frost depth
- 2
Framing
After framing and rough-in trades are complete, before insulation or wall cover
- 3
Insulation / Energy
Insulation and IECC Climate Zone 16 compliance verified before drywall
- 4
Final
All work complete per approved plans, ready for occupancy
See the full Hailey inspection guide — scheduling & re-inspection fees →
Tips
- Idaho Code 39-4117 (effective 2025) requires a local government to determine whether a residential building permit application is complete within 10 business days of receipt (20 business days for commercial); this is a completeness-review timeframe, not a full plan-approval SLA — Hailey has not published its own full plan-review-to-issuance turnaround time.
- Electrical and plumbing permits/inspections in Hailey are handled directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City — schedule DOPL inspections at 1-208-332-4700 or edopl.idaho.gov/OnlineServices.
- Hailey's fee schedule folds the plan check fee (67%), planning review fee (34% of plan check), and fire department review fee (44% of plan check, where applicable) on top of the base Table 1-A permit fee — budget for all four line items.
- Original permits are valid for 548 days; a maximum of four 180-day extensions are allowed; a permit becomes null and void if inspections have not been completed for 180 days.
- The Hailey Clean Energy Deposit ($1,288 flat for new single-family/ADU/townhome) is separate from and in addition to the Development Impact Fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hailey
Building Permit (New Construction, Additions, Remodels) in other cities
Compare building permit (new construction, additions, remodels) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Hailey project checklist
Describe your project once and get every permit, document, and fee it triggers in Hailey — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →