EV Charger / EVSE Permit in Hailey, Idaho

Hailey has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. Unlike solar/renewable-energy installations (which trigger the City's flat-fee 'Alternative Energy Permit'), an EV charger is not a power-generation or energy-storage system, so it does not require a City structural/mounting permit. The wiring/circuit work is billed as a standard electrical installation under the State of Idaho DOPL Contractor (or Homeowner) Electrical Permit, using the general 'Other Installations including Commercial/Industrial/Solar/Renewable Energy' valuation-based fee formula (the same formula used for solar, just without the Solar/Renewable Energy checkbox).

Verified 2026-07-20 · Source

When you need this permit

  • No City of Hailey building or structural permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved
  • Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City, per the DOPL Contractor Electrical Permit Worksheet
  • On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all
  • Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- that box is for generation/storage systems, not vehicle-charging loads; the fee formula is identical either way

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

State DOPL Electrical Permit -- Other Installations, up to $10,000 system costIdaho DOPL Contractor Electrical Permit Worksheet (Fee Schedule), Rev. 8/17/2022 -- same formula tier used for solar/renewable energy; no dedicated EV/EVSE line item exists on the state form
(total cost of system x 0.02) + $60
State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system costIdaho DOPL Contractor Electrical Permit Worksheet, Rev. 8/17/2022
((total cost of system - $10,000) x 0.01) + $260

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Hailey?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State Electrical Inspection

    Performed by an Idaho DOPL inspector; charger circuit, disconnect, and GFCI/load-management compliance verified before energizing

See the full Hailey inspection guide — scheduling & re-inspection fees →

Tips

  • Hailey does not have an EV-specific permit or fee -- a home or business EV charger install is just a standard State of Idaho DOPL electrical permit, priced under the general 'Other Installations' valuation formula.
  • No City of Hailey Building Division permit is needed for a standard EV charger install since it is not a power-generation/energy-storage system (unlike rooftop solar, which does trigger the City's Alternative Energy Permit).
  • If the charger install is paired with a service panel upgrade, that upgrade is priced under the same 'Other Installations' valuation formula as part of the same DOPL permit.

Frequently asked questions

Hailey requires an ev charger / evse permit for: No City of Hailey building or structural permit is required for a standard wall-mounted or pedestal EV charger installation -- only electrical work is involved; Electrical permit issued by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City, per the DOPL Contractor Electrical Permit Worksheet; On the DOPL worksheet, EV charger circuits fall under 'OTHER INSTALLATIONS including COMMERCIAL/INDUSTRIAL/SOLAR/RENEWABLE ENERGY' -- the worksheet states this category 'shall apply to any and all electrical installations not specifically mentioned elsewhere on this form,' and EV/EVSE circuits have no dedicated line item, so they fall under this catch-all; Do NOT check the 'Solar, Renewable Energy, power generation, power production, or energy storage systems' box on the DOPL worksheet for a straight EV charger install -- that box is for generation/storage systems, not vehicle-charging loads; the fee formula is identical either way. If your project isn't listed, confirm with City of Hailey Community Development Department — Building Services at (208) 788-9815 before starting work.

In Hailey, the published State DOPL Electrical Permit -- Other Installations, up to $10,000 system cost is: (total cost of system x 0.02) + $60. Additional published fees: State DOPL Electrical Permit -- Other Installations, $10,001-$100,000 system cost — ((total cost of system - $10,000) x 0.01) + $260. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Hailey does not publish a plan-review timeline for this permit. Contact City of Hailey Community Development Department — Building Services at (208) 788-9815 for current turnaround.

You'll need: Idaho DOPL Contractor (or Homeowner) Electrical Permit Application. See the required-documents checklist on this page for details on each.

Hailey requires 1 inspection(s) for an ev charger / evse permit, in order: State Electrical Inspection. Schedule each through City of Hailey Community Development Department — Building Services ((208) 788-9815).

Apply through City of Hailey Community Development Department — Building Services at 115 S Main Street, Hailey, ID 83333. Phone: (208) 788-9815, email: yadira.ward@haileycityhall.org. Office hours: Mon–Thu 9:00 AM – 5:00 PM; Fri 9:00 AM – 12:00 PM (closed weekends and holidays). Official information: https://haileycityhall.org/community-development/building-services/.

Hailey, Idaho has adopted: 2018 International Building Code (IBC), as amended by the Idaho Building Code Board, including new Appendix O (Radon Control Methods); 2018 International Residential Code (IRC), Parts I–III and IX, as amended by the Idaho Building Code Board, including Appendix F (Radon Control Methods), Appendix Q (Tiny Houses), and Appendix T (Solar Ready Provisions — Detached One- and Two-Family Dwellings and Townhouses); 2018 International Energy Conservation Code (IECC), as amended by the Idaho Building Code Board; 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Existing Building Code (IEBC), as amended by the Idaho Building Code Board; Idaho State Plumbing Code (ISPC), as adopted and amended by the Idaho Plumbing Board — required plumbing fixture counts per IBC Table 2902.1; National Electrical Code (NEC), latest edition approved by the Idaho Electrical Board — administered and inspected by the State of Idaho, not the City of Hailey. Local amendments apply — see the Hailey overview page for the full list.

No. Hailey has no dedicated EV/EVSE permit or fee line item. Installing a home or business EV charger only requires a standard State of Idaho DOPL electrical permit, priced under the general 'Other Installations' valuation-based formula -- the same formula used for solar, just without the renewable-energy checkbox. No separate City of Hailey structural permit is required.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hailey building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.