Covers new commercial construction, commercial additions, and commercial remodels or tenant improvements in Hailey. There is no distinct 'Commercial Building Permit' or 'Tenant Improvement Permit' product: commercial work is filed on the same universal Application for Building Permit used for residential projects, checked COMMERCIAL under New Construction or Remodel, and priced off the same Table 1-A valuation schedule. What genuinely differs from residential on this same application: two or more paper plan sets instead of electronic-only submittal; IECC Section C407 commercial energy-efficiency compliance; a separate Design Review Application fee for Commercial or Mixed-Use projects; a nonresidential Development Impact Fee table; a higher Clean Energy Deposit basis; a $600 nonrefundable Temporary Certificate of Occupancy fee; and a 20-business-day (versus 10) statutory completeness-review window under Idaho Code 39-4117.

Verified 2026-08-26 · Source

When you need this permit

  • New commercial construction, commercial additions, or commercial remodels/tenant improvements, filed on the same Application for Building Permit used for residential work, checked COMMERCIAL under New Construction or Remodel
  • Reviewed under the 2018 International Building Code, adopted at Hailey Municipal Code 15.08.010(A) as amended by the Idaho Building Code Board, including new Appendix O
  • Construction documents submitted in two or more paper sets (versus electronic-only for residential applications), prepared by an Idaho-licensed architect or structural engineer where required, per Hailey Municipal Code 15.08.020, Section 107.1
  • Buildings under 20,000 square feet must demonstrate IECC Section C407 Total Building Performance compliance using a COMcheck energy analysis; buildings 20,000 square feet or more must use building-department-approved energy modeling software (eQuest, Trace, Carrier HAP, EnergyPlus, or equivalent), per Hailey Municipal Code 15.08.020(C)(2)(a)
  • A separate Design Review Application fee applies to projects categorized as Commercial or Mixed-Use, billed apart from the Building Permit and Plan Check fees; the City's Design Review process is administered under Hailey Municipal Code Title 17, Chapter 17.06 — the fee schedule confirms this category and its fee, but the chapter's specific applicability triggers for exterior commercial work could not be confirmed in this session because the code library's Chapter 17.06 pages did not render readable text through a browser-header fetch
  • Electrical and plumbing work is permitted and inspected directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Hailey
  • Fire Department plan review is performed by the City's own Hailey Fire & Rescue Department (which conducts its own plan reviews for new construction according to its department page), billed as part of the Plan Check Fee stack rather than as a separate permit; no evidence was found that Hailey contracts commercial fire plan review out to Wood River Fire & Rescue or any other district

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit — valuation $1 to $500Hailey Building Permit Fee Table 1-A, effective October 1, 2025 — the same citywide valuation table used for the Residential Building Permit; see the residential building permit for the full valuation-tier breakdown
$27.78
Building Permit — valuation $1,000,001 and upHailey Building Permit Fee Table 1-A, effective October 1, 2025 — same table used for residential and commercial projects
$7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof
Plan Check FeeHailey Municipal Fee Schedule effective October 1, 2025 (Plan Check Fees section) and the Building Permit Application (rev. 12/01/2025); the same rate applies to residential and commercial projects on this fee schedule
67% of the base Building Permit Fee
Planning Review FeeHailey Municipal Fee Schedule effective October 1, 2025 (Plan Check Fees section) and the Building Permit Application (rev. 12/01/2025)
34% of the Plan Check Fee
Hailey Fire Dept. Plan Review FeeHailey Municipal Fee Schedule effective October 1, 2025 (Plan Check Fees section) and the Building Permit Application (rev. 12/01/2025); billed by and paid to the City's own Hailey Fire & Rescue Department
44% of the Plan Check Fee, where applicable
Design Review Application — Commercial or Mixed-UseHailey Municipal Fee Schedule effective October 1, 2025 (Design Review Application section) — a Planning Department fee distinct from the Building Permit and Plan Check fees above
$1,350.00, plus $64.00 per 1,000 gross square feet
Temporary Certificate of Occupancy — CommercialHailey Municipal Fee Schedule effective October 1, 2025 (Building section), up from $583 in the prior fee year — a genuine commercial-vs-residential rate difference; the residential rate is $241
$600, nonrefundable
Development Impact Fee — Nonresidential (Commercial), per 1,000 sq ft net floor areaDevelopment Impact Fee Schedule effective 12/01/2025, reverse side of the Building Permit Application (rev. 12/01/2025); a distinct nonresidential table separate from the per-dwelling-unit residential schedule
$9,864 total (Parks & Recreation $134 + Circulation $7,945 + Fire $1,563 + Police $222)
Hailey Clean Energy Deposit — new mixed use, commercial, industrial, or institutionalClean Energy Deposit Fee effective 05/18/2022, confirmed on the reverse side of the Building Permit Application (rev. 12/01/2025); distinct from the $1,288 flat rate for new single-family/ADU/townhome
$1,250 per 10,000 sq ft
Building Permit Extension (180-day extension)Hailey Municipal Fee Schedule effective October 1, 2025; up to 4 extensions permitted, applies to any Building Permit including commercial
$170

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction, Additions, Remodels & Tenant Improvements) permit actually take in Hailey?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footings

    Before concrete pour — verify forms, rebar, and anchor bolts meet the 24-inch minimum frost depth

  2. 2

    Framing

    After framing and rough-in trades are complete, before insulation or wall cover

  3. 3

    Energy Compliance

    COMcheck analysis or energy modeling software output verified against IECC Section C407 before drywall

  4. 4

    Final

    All work complete per approved plans, ready for occupancy; Fire Department final sign-off is coordinated through the City's own Hailey Fire & Rescue Department

See the full Hailey inspection guide — scheduling & re-inspection fees →

Tips

  • Hailey has no distinct 'Commercial Building Permit' or 'Tenant Improvement Permit' — commercial new construction and commercial remodels/TI both go through the same Application for Building Permit used for residential work, checked COMMERCIAL, and priced off the same Table 1-A valuation schedule.
  • Budget for the full fee stack: the base Table 1-A Building Permit Fee, plus 67% Plan Check Fee, plus 34% of that for Planning Review, plus (where applicable) 44% of Plan Check for Hailey Fire Dept. review, plus the nonresidential Development Impact Fee, plus the Clean Energy Deposit, plus a Design Review Application fee if the project is categorized Commercial or Mixed-Use.
  • The Design Review Application fee for Commercial or Mixed-Use projects ($1,350 plus $64.00 per 1,000 gross square feet) is billed by the Planning Department separately from the Building Permit and Plan Check fees; confirm with Community Development whether a specific project triggers this review.
  • Commercial construction documents require two or more paper plan sets; residential applications instead submit electronically — a difference specific to the class of work checked on the application.
  • Fire plan review in Hailey is performed in-house by the City's own Hailey Fire & Rescue Department and billed through the Plan Check Fee stack, not a separate fire-district permit — this differs from some neighboring Blaine County jurisdictions that contract fire review out to a separate district.
  • The Arts and Historic Preservation Commission review applies specifically to demolition of structures built wholly or in part before 1941 — no separate historic-preservation review requirement attaching to commercial exterior remodels or alterations short of demolition was found on the City's Building Services or Planning pages.

Frequently asked questions

Hailey requires a commercial building permit (new construction, additions, remodels & tenant improvements) for: New commercial construction, commercial additions, or commercial remodels/tenant improvements, filed on the same Application for Building Permit used for residential work, checked COMMERCIAL under New Construction or Remodel; Reviewed under the 2018 International Building Code, adopted at Hailey Municipal Code 15.08.010(A) as amended by the Idaho Building Code Board, including new Appendix O; Construction documents submitted in two or more paper sets (versus electronic-only for residential applications), prepared by an Idaho-licensed architect or structural engineer where required, per Hailey Municipal Code 15.08.020, Section 107.1; Buildings under 20,000 square feet must demonstrate IECC Section C407 Total Building Performance compliance using a COMcheck energy analysis; buildings 20,000 square feet or more must use building-department-approved energy modeling software (eQuest, Trace, Carrier HAP, EnergyPlus, or equivalent), per Hailey Municipal Code 15.08.020(C)(2)(a); A separate Design Review Application fee applies to projects categorized as Commercial or Mixed-Use, billed apart from the Building Permit and Plan Check fees; the City's Design Review process is administered under Hailey Municipal Code Title 17, Chapter 17.06 — the fee schedule confirms this category and its fee, but the chapter's specific applicability triggers for exterior commercial work could not be confirmed in this session because the code library's Chapter 17.06 pages did not render readable text through a browser-header fetch; Electrical and plumbing work is permitted and inspected directly by the State of Idaho Division of Occupational and Professional Licenses (DOPL), not the City of Hailey; Fire Department plan review is performed by the City's own Hailey Fire & Rescue Department (which conducts its own plan reviews for new construction according to its department page), billed as part of the Plan Check Fee stack rather than as a separate permit; no evidence was found that Hailey contracts commercial fire plan review out to Wood River Fire & Rescue or any other district. If your project isn't listed, confirm with City of Hailey Community Development Department — Building Services at (208) 788-9815 before starting work.

In Hailey, the published Building Permit — valuation $1 to $500 is: $27.78. Additional published fees: Building Permit — valuation $1,000,001 and up — $7,971.90 for the first $1,000,000, plus $4.52 for each additional $1,000 or fraction thereof; Plan Check Fee — 67% of the base Building Permit Fee; Planning Review Fee — 34% of the Plan Check Fee; Hailey Fire Dept. Plan Review Fee — 44% of the Plan Check Fee, where applicable; Design Review Application — Commercial or Mixed-Use — $1,350.00, plus $64.00 per 1,000 gross square feet; Temporary Certificate of Occupancy — Commercial — $600, nonrefundable; Development Impact Fee — Nonresidential (Commercial), per 1,000 sq ft net floor area — $9,864 total (Parks & Recreation $134 + Circulation $7,945 + Fire $1,563 + Police $222); Hailey Clean Energy Deposit — new mixed use, commercial, industrial, or institutional — $1,250 per 10,000 sq ft; Building Permit Extension (180-day extension) — $170. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Idaho Code 39-4117 requires the City to determine whether a commercial application is complete within 20 business days of submission. The City of Hailey has not published a separate full plan-review-to-issuance timeframe beyond this statutory completeness-review requirement.

You'll need: Application for Building Permit; Construction Drawings; Commercial Energy Compliance Documentation; Zoning Review Checklist. Depending on your project, Hailey may also ask for: Design Review Application. See the required-documents checklist on this page for details on each.

Hailey requires 4 inspection(s) for a commercial building permit (new construction, additions, remodels & tenant improvements), in order: Foundation / Footings, Framing, Energy Compliance, Final. Schedule each through City of Hailey Community Development Department — Building Services ((208) 788-9815).

Apply through City of Hailey Community Development Department — Building Services at 115 S Main Street, Hailey, ID 83333. Phone: (208) 788-9815, email: yadira.ward@haileycityhall.org. Office hours: Mon–Thu 9:00 AM – 5:00 PM; Fri 9:00 AM – 12:00 PM (closed weekends and holidays). Official information: https://haileycityhall.org/community-development/building-services/.

No. Commercial new construction and commercial remodels or tenant improvements are filed on the same Application for Building Permit used for residential projects, checked COMMERCIAL, and priced off the same Table 1-A valuation schedule. Commercial projects do carry distinct requirements: two or more paper plan sets instead of electronic submittal, IECC Section C407 energy-efficiency compliance, a Design Review Application fee for Commercial or Mixed-Use projects, a nonresidential Development Impact Fee table, a $1,250-per-10,000-sq-ft Clean Energy Deposit rate, and a $600 nonrefundable Temporary Certificate of Occupancy fee.

The City's own Hailey Fire & Rescue Department conducts plan reviews for new construction in-house, billed as the Hailey Fire Dept. Plan Review Fee (44% of the Plan Check Fee, where applicable) as part of the same Building Permit fee stack — not as a separate fire-district permit.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Hailey.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.