Electrical Permit in Kuna, Idaho

Required for all electrical installations in Kuna. The Electrical Program exists to protect life, health, and property by ensuring electrical installations comply with the current safety codes. A permit must be obtained prior to commencement of work. Electrical permits are available at the City of Kuna Building Department. (Verified 2026-07-16: commercial/industrial/solar ×0.02 formula confirmed exact on the live fee schedule PDF, not drift; two additional fee tiers above $10,000 were found on the same table and added below.)

Verified 2026-07-16 · Source

When you need this permit

  • Electrical permit required before commencing any electrical work
  • Submit Electrical Permit Application (PDF) to the Building Department
  • Licensed Idaho electrical contractor required for electrical work not performed by the homeowner on their own primary residence

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Temporary Construction Services (200 amp or less, one location)Resolution R74-2023A
$65
New Single Family Dwelling — up to 1,500 sq ftResolution R74-2023A
$130
New Single Family Dwelling — 1,501 to 2,500 sq ftResolution R74-2023A
$195
New Single Family Dwelling — 2,501 to 3,500 sq ftResolution R74-2023A
$260
New Single Family Dwelling — 3,501 to 4,500 sq ftResolution R74-2023A
$325
New Single Family Dwelling — over 4,500 sq ftResolution R74-2023A
$325 + $65 per additional 1,000 sq ft
Existing ResidenceUp to maximum of corresponding sq ft; Resolution R74-2023A
$65 + $10 per additional branch circuit
Detached Shop/Accessory BuildingResolution R74-2023A
$65 + $10 per additional branch circuit
Duplex Apartment or CondominiumResolution R74-2023A
$260
Swimming Pools (covers 4 mandatory inspections, excluding lighting)Resolution R74-2023A
$195
Commercial/Industrial/Solar (contract value ≤$10,000)Resolution R74-2023A
$60 + (contract value × 0.02)
Commercial/Industrial/Solar ($10,001–$100,000)Resolution R74-2023A; tier confirmed on live fee schedule 2026-07-16, previously missing from this file
$260 + ((contract value − $10,000) × 0.01)
Commercial/Industrial/Solar (contract value >$100,000)Resolution R74-2023A; tier confirmed on live fee schedule 2026-07-16, previously missing from this file
$1,160 + ((contract value − $100,000) × 0.005)
Re-inspection FeeResolution R57-2021
$65 each (after each failed attempt)

Review timeline

Plan reviewTypical estimate — confirm current times with the Kuna building department
~3–10 business days

How long did your Electrical Permit permit actually take in Kuna?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In Electrical

    Inspection of rough-in wiring before walls are closed

  2. 2

    Final Electrical

    Final inspection of all electrical installations

See the full Kuna inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical permits are available at the City of Kuna Building Department
  • A permit must be obtained prior to commencement of work
  • Homeowners may perform electrical work on their own primary residence but must get the permit and perform the work themselves Owner-builder

Frequently asked questions

Kuna requires an electrical permit for: Electrical permit required before commencing any electrical work; Submit Electrical Permit Application (PDF) to the Building Department; Licensed Idaho electrical contractor required for electrical work not performed by the homeowner on their own primary residence. If your project isn't listed, confirm with City of Kuna Building Department at (208) 922-5546 before starting work.

In Kuna, the published Temporary Construction Services (200 amp or less, one location) is: $65. Additional published fees: New Single Family Dwelling — up to 1,500 sq ft — $130; New Single Family Dwelling — 1,501 to 2,500 sq ft — $195; New Single Family Dwelling — 2,501 to 3,500 sq ft — $260; New Single Family Dwelling — 3,501 to 4,500 sq ft — $325; New Single Family Dwelling — over 4,500 sq ft — $325 + $65 per additional 1,000 sq ft; Existing Residence — $65 + $10 per additional branch circuit; Detached Shop/Accessory Building — $65 + $10 per additional branch circuit; Duplex Apartment or Condominium — $260; Swimming Pools (covers 4 mandatory inspections, excluding lighting) — $195; Commercial/Industrial/Solar (contract value ≤$10,000) — $60 + (contract value × 0.02); Commercial/Industrial/Solar ($10,001–$100,000) — $260 + ((contract value − $10,000) × 0.01); Commercial/Industrial/Solar (contract value >$100,000) — $1,160 + ((contract value − $100,000) × 0.005); Re-inspection Fee — $65 each (after each failed attempt). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an electrical permit in Kuna typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with City of Kuna Building Department at (208) 922-5546.

You'll need: Electrical Permit Application (PDF). See the required-documents checklist on this page for details on each.

Kuna requires 2 inspection(s) for an electrical permit, in order: Rough-In Electrical, Final Electrical. Schedule each through City of Kuna Building Department ((208) 922-5546).

Apply through City of Kuna Building Department at 751 W. 4th Street, P.O. Box 13, Kuna, ID 83634. Phone: (208) 922-5546, email: BuildingPermits@KunaID.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM; inspection requests must be submitted prior to 4:00 PM for next business day. Official information: https://kunacity.id.gov/119/Building-Department.

Kuna, Idaho has adopted: 2018 International Building Code (IBC) — adopted statewide per Idaho Building Code Act; 2018 International Residential Code (IRC, Parts I, II, III and IX) — adopted statewide; 2018 International Energy Conservation Code (IECC) — adopted statewide; 2018 International Existing Building Code (IEBC) — adopted statewide; 2018 International Mechanical Code (IMC) — adopted statewide; 2018 International Fuel Gas Code (IFGC) — adopted statewide; 2023 National Electrical Code (NEC/NFPA 70) — adopted via Idaho Electrical Board; 2017 Idaho State Plumbing Code (ISPC) — based on 2015 Uniform Plumbing Code; 2018 International Fire Code (IFC) — administered by Idaho Fire Marshal. Local amendments apply — see the Kuna overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kuna building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.