Solar PV Permit (State-Issued Electrical + City Building Permit) — Priest River, Idaho · Requirements sheet
Verified 2026-07-19 · Source: https://dopl.idaho.gov/ele/ele-permits-and-inspections/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit (State-Issued Electrical + City Building Permit) in Priest River, Idaho
Required for installation of rooftop or ground-mounted solar photovoltaic systems within the City of Priest River. Idaho does not allow cities to administer their own electrical permitting: the electrical-connection scope of a solar install is permitted directly by the Idaho Division of Occupational and Professional Licenses (DOPL, formerly the Division of Building Safety), while the structural/roof-mounting scope requires a City of Priest River Building Permit, with plan review performed under contract by James A. Sewell & Associates, LLC as the City's Building Official.
Verified 2026-07-19 · Source
When you need this permit
- Electrical work on a solar PV system must be performed by an Idaho-licensed electrical contractor whose electrician holds (or is supervised by someone holding) the Solar Photovoltaic limited electrical license category, which requires proof of NABCEP (North American Board of Certified Energy Practitioners) installer certification or equivalent, per IDAPA 24.39.10.153.09
- Grid-tied renewable energy systems require a mandatory electrical plan review by DOPL before the installation permit can be purchased
- All PV electrical work must comply with the applicable provisions of the National Electrical Code as adopted by Idaho (IDAPA 24.39.10.250)
- The structural/roof-mounting scope requires a City of Priest River Building Permit: recorded deed, plot plan with setbacks, two 11x17 sets of construction plans, and (for pole-mounted or ground-mounted racking on a pole-type structure) plans stamped by an Idaho Licensed Design Professional
- Water and sewer approval is not applicable to a solar-only project but standard City review still applies to the structural building permit
- Separate permits are required for electrical work in addition to the City building permit — the City does not issue electrical permits itself
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Rough-In
Grounding and listing of all components verified before the system is covered or energized (DOPL electrical inspection)
- 2
Electrical Final
Wiring methods, labeling at the shut-off, working clearances, and system operation verified (DOPL electrical inspection)
- 3
Building Final
Panel mounting and roof/structural attachment verified against approved plans (City building inspection, performed by James A. Sewell & Associates under contract)
See the full Priest River inspection guide — scheduling & re-inspection fees →
Tips
- Idaho does not allow the City of Priest River to issue its own electrical permits — the electrical scope of any solar installation is a STATE permit through DOPL, not a city permit.
- Because grid-tied systems require a passing DOPL plan review before the installation permit itself can be purchased, budget the plan-review fee ($65/hour, one-hour minimum) and lead time separately from the installation permit fee.
- The structural/roof-mounting scope still requires the City's standard Building Permit process, reviewed by the contract Building Official James A. Sewell & Associates, LLC, (208) 263-4160 — confirm which fee category applies to a solar-only project, since the City's Resolution No. 25-056 fee schedule does not list a dedicated solar line item.
- A contractor performing the installation must hold Idaho's Solar Photovoltaic limited electrical license category (requiring NABCEP certification or equivalent), per the Idaho Electrical Board's own rules — homeowners may self-install on their own residence subject to Idaho Code Section 54-1016 exemptions.
- An Energizing Permit allowing connection of electricity to the building is issued only after a completed building permit is filed with the City, per the City's own residential building permit tips.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Priest River building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Priest River
Solar PV Permit (State-Issued Electrical + City Building Permit) in other cities
Compare solar pv permit (state-issued electrical + city building permit) fees across Idaho →
Look up this fee in a different city →