Commercial Tenant Improvement (TI) Permit — Coeur d'Alene, Idaho · Requirements sheet
Reviewed 2026-08-02 · Source: https://www.cdaid.org/government/departments/building-services/commercial-applications/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement (TI) Permit in Coeur d'Alene, Idaho
Tenant improvements to existing commercial/non-residential space in Coeur d'Alene are processed as a Building Permit under the SAME Commercial Permit Application and Commercial Permit Application Sheet Index used for new commercial construction and additions — the City does not publish a separate TI-specific application or fee table. TI is explicitly listed among the City's Building Permit examples ('...alterations, ...remodels, tenant improvements...') and the Commercial Applications page groups TI directly under 'Commercial Building' alongside new construction and additions ('For new construction, additions, tenant improvements'). Confirmed directly against the City's FAQ, Commercial Applications page, Commercial Permit Application, and Project Review Application.
Reviewed 2026-08-02 · Source
When you need this permit
- Building Permit required for tenant improvements to existing commercial/non-residential space, per the City's FAQ Building Permit definition ('New construction, additions, alterations, window replacement, remodels, tenant improvements...')
- No separate TI-specific application or checklist is published — the same Commercial Permit Application and Commercial Permit Application Sheet Index used for new commercial construction and additions is used for tenant improvements
- Code Analysis Sheet must identify occupancy classification(s) and mixed-occupancy ratio analysis 'allowed and as proposed,' relevant where a TI changes tenant use/occupancy from the prior tenant
- 'Previous use(s) of the building' must be identified on the Project Review Application, used to flag change-of-occupancy review
- If the tenant improvement does not include the entire building, a key plan showing the location of the proposed work is required, per the Project Review Application's Required Floor Plan Information
- Commercial plans and PDFs must bear the stamp, signature, and date of an appropriate State of Idaho licensed architect and/or engineer
- Same 180-day null-and-void clause applies: authorized work must commence within 180 days of issuance and not be suspended for 180 days
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing / Rough-In
Structural framing and rough electrical/plumbing/mechanical within the TI scope, before covering
- 2
Fire-Resistive Assembly Cover (where applicable)
Required before covering any tested, rated fire-resistive assembly affected by the TI scope, per the Code Analysis Sheet requirements
- 3
Final Inspection / Certificate of Occupancy
Final inspection required before occupying the tenant space; a new or amended Certificate of Occupancy is issued where the TI changes occupancy classification or tenant
See the full Coeur d'Alene inspection guide — scheduling & re-inspection fees →
Tips
- Coeur d'Alene has no separate tenant-improvement application or fee schedule — a TI is submitted on the same Commercial Permit Application and billed on the same valuation-based Building Permit Fee Schedule (65% Commercial Plan Check) as new commercial construction.
- If a TI affects only part of a building, provide a key plan showing the scope of work rather than plans for the entire building, per the Project Review Application's Required Floor Plan Information.
- Because a TI often changes occupancy or tenant use, budget time for the City's occupancy-classification and mixed-occupancy-ratio review even for interior-only scopes — these items are marked REQUIRED on the Code Analysis Sheet regardless of project size.
- The optional $350 Project Review meeting specifically asks for the building's 'previous use(s)' — useful to have on hand for a change-of-tenant TI.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coeur d'Alene building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Coeur d'Alene.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Coeur d'Alene
Commercial Tenant Improvement (TI) Permit in other cities
Compare commercial tenant improvement (ti) permit fees across Idaho →
Look up this fee in a different city →
Now live
Build your Coeur d'Alene project checklist
Describe your project once and get every permit, document, and fee it triggers in Coeur d'Alene — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →