Commercial Building Permit (New Construction / Additions) in Coeur d'Alene, Idaho
Required for new commercial construction and additions to commercial/non-residential structures in Coeur d'Alene. Uses a distinct Commercial Permit Application and Commercial Permit Application Sheet Index (submittal checklist) from the residential process, requires an Idaho-licensed architect/engineer stamp on plans, and is billed on the same valuation-based Building Permit Fee Schedule but with a 65% Commercial Plan Check fee (vs. 15% for Residential). Reviewed against the locally-adopted 2018 IBC and 2018 IECC (Commercial). Submitted in person at 710 E. Mullan Ave — Commercial permits are not one of the four permit types supported for online submittal/payment through building.cdaid.org.
Reviewed 2026-08-02 · Source
When you need this permit
- Building Permit required for new commercial construction and additions to commercial/non-residential structures, per the City's FAQ Building Permit definition and the Commercial Applications page's 'Commercial Building' category (new construction, additions, tenant improvements)
- Commercial plans and PDFs must bear the stamp, signature, and date of an appropriate State of Idaho licensed architect and/or engineer (Idaho Registered Design Professional), per the Commercial Applications page and IBC Section 107 submittal-documents requirement
- One paper set and one electronic (PDF) set of building plans (minimum 18"x24" sheets), a specification book, structural calculations, and a COMCHECK energy-compliance report are marked **REQUIRED** on the City's Commercial Permit Application Sheet Index; incomplete submittals will not be accepted for plan review
- A Code Analysis Sheet is required, documenting construction type, occupancy classification(s), occupancy/area separations with fire-resistive time periods, area/height/story increases, mixed-occupancy ratio analysis, exit analysis, and the specific code edition(s) the design conforms to (e.g. 2018 IBC, 2017 ISPC)
- A $350 Project Review meeting with City staff is available (and its documentation is referenced by the Commercial Permit Application Sheet Index as the source of project-specific Registered Design Professional requirements); a preconstruction meeting may additionally be required based on the information submitted at that review
- Idaho State Contractor's Registration number and expiration date required on the Commercial Permit Application
- New or continuing non-residential connections to the City sanitary sewer require a signed 'Notice to New or Continuing Non-Residential Service Applicants' form (industrial wastewater pretreatment program, Ordinance #1773) and a completed Water Service Form documenting new water/irrigation/fire-line services
- Permit becomes null and void if the authorized work is not commenced within 180 days of issuance, or is suspended for 180 days after starting
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before placing concrete or grout
- 2
Framing
Structural framing and rough electrical/plumbing/mechanical, before covering
- 3
Fire-Resistive Assembly / Insulation Cover
Required before covering any tested, rated fire-resistive wall, floor/ceiling, roof/ceiling, column, or beam assembly identified on the Code Analysis Sheet, and before taping gypsum wallboard of fire-resistive assemblies
- 4
Final Inspection / Certificate of Occupancy
Final inspection and issuance of Certificate of Occupancy required prior to occupying or using the building, per the Commercial Permit Application's C.O. clause
See the full Coeur d'Alene inspection guide — scheduling & re-inspection fees →
Tips
- Commercial permits are not submitted through building.cdaid.org — they are counter/in-person submittals at 710 E. Mullan Ave, unlike Residential Building, Plumbing, Mechanical, and Re-Roof permits.
- The Commercial Plan Check fee (65% of the building permit fee) is more than 4x the Residential Plan Check rate (15%) on the same valuation-based fee schedule — factor this into project budgeting.
- A $350 Project Review meeting with City staff before formal submittal can surface Registered Design Professional and code-analysis requirements specific to the project; the Commercial Permit Application Sheet Index explicitly references this meeting as the source of project-specific requirements.
- No numeric commercial plan-review turnaround is published — the City's FAQ states only that commercial projects take longer than the 7-14 business day window quoted for single-family, duplex, and garage projects.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coeur d'Alene building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Coeur d'Alene.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Coeur d'Alene
Commercial Building Permit (New Construction / Additions) in other cities
Compare commercial building permit (new construction / additions) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Coeur d'Alene project checklist
Describe your project once and get every permit, document, and fee it triggers in Coeur d'Alene — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →