Rexburg building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Rexburg, Idaho.
Verified 2026-07-04 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 35 N 1st East, Rexburg, ID 83440
- Phone
- (208) 372-2166
- building@rexburg.org
- Office hours
- City Hall Open Hours: M-Th 7:30 am - 5:30 pm, F 7:30 am - 12:30 pm. Main City switchboard: (208) 359-3020; Building Department direct line: (208) 372-2166.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (Single Family Home / Townhome)
- 1
Layout & Footing
Lot corners staked before excavation; footing made after poles/piers set or trenched/basement excavated; forms and reinforcing in place
- 2
Foundation
Excavations for thickened slabs supporting bearing walls/partitions/structural supports/equipment; all forms and reinforcing steel in place
- 3
Plumbing Underground
Any plumbing under slab/concrete floor, inspected before concrete is poured; includes radon piping where applicable
- 4
Plumbing Water & Sewer
Checks city water and city sewer connections to the house
- 5
Sheeting
Inspected for nail separation, prior to plumbing/electrical/mechanical work
- 6
Plumbing Rough-In
Made prior to covering or concealment, before framing inspection
- 7
HVAC (Mechanical) Rough-In & Gas Pressure Test
Made prior to covering or concealment, before framing inspection
- 8
Electrical Service
Conductors/equipment delivering energy from the serving utility to the premises wiring system (not applicable to all projects)
- 9
Electrical Rough-In
Made prior to covering or concealment, before framing inspection
- 10
Framing
After roof, masonry, all framing, fire stopping, draft stopping, bracing, and house wrap are in place
- 11
Insulation
Outside envelope inspection for energy code compliance
- 12
Drywall
After interior wallboard is in place, before texture is applied and joints/fasteners are taped and finished
- 13
Sidewalk
6 inches of gravel fill in valley locations, 12 inches on hill locations; standard 5 ft width with broom finish; expansion joint filler at driveways and max 50 ft spacing
- 14
Electrical Final
Fixtures and wall covers in place, appliances in place, panel directory completed, ready for occupancy
- 15
Plumbing Final
All systems in place, fixtures set, ready for occupancy
- 16
HVAC (Mechanical) Final
All systems in place, fixtures set, ready for occupancy
- 17
Building Final
Made after all other finals have passed; building completed and ready for occupancy
Applies to: Multi-Family Residence / Commercial Building Permit
- 1
Layout & Footing
Lot corners staked before excavation; footing made after poles/piers set or trenched/basement excavated; forms and reinforcing in place
- 2
Foundation
Excavations for thickened slabs supporting bearing walls/partitions/structural supports/equipment; all forms and reinforcing steel in place
- 3
Plumbing Underground
Any plumbing under slab/concrete floor, inspected before concrete is poured
- 4
Sheeting
Inspected for nail separation, prior to plumbing/electrical/mechanical work
- 5
Plumbing / HVAC / Electrical Rough-In
Made prior to covering or concealment, before framing inspection
- 6
Framing
After roof, masonry, all framing, fire stopping, draft stopping, bracing, and house wrap are in place
- 7
Insulation
Outside envelope inspection for energy code compliance
- 8
Drywall
After interior wallboard is in place, before texture and taping/finishing
- 9
Electrical / Plumbing / HVAC Final
All systems in place, fixtures set, ready for occupancy
- 10
Building Final
Made after all other finals have passed; building completed and ready for occupancy
Applies to: Plumbing Permit
- 1
Plumbing Underground
Any plumbing under slab/concrete floor, inspected before concrete is poured; includes radon piping where applicable
- 2
Plumbing Water & Sewer
Checks city water and city sewer connections to the structure
- 3
Plumbing Rough-In
Made prior to covering or concealment, before framing inspection
- 4
Plumbing Final
All systems in place, fixtures set, ready for occupancy
Applies to: Electrical Permit
- 1
Electrical Service
Conductors/equipment delivering energy from the serving utility to the premises wiring system (not applicable to all projects)
- 2
Electrical Rough-In
Made prior to covering or concealment, before framing inspection
- 3
Electrical Final
Fixtures and wall covers in place, appliances in place, panel directory completed, ready for occupancy
Applies to: Solar Panels Permit
- 1
Electrical Rough-In
Wiring, grounding, and component listing verified before covering or energizing (City electrical inspector, not DOPL)
- 2
Electrical Final
Panel labeling, working clearances, and system operation verified (City electrical inspector)
- 3
Building Final
Roof-mounting and structural attachment verified against the stamped engineering plans (City building inspector)
Applies to: Duplex Conversion Permit
- 1
Life Safety Inspection
Verifies smoke/CO detectors, fire separation, fire extinguisher, egress windows, and other life-safety code items are met
- 2
Building Final
Made after all other finals have passed; verifies the converted structure meets current code for two-unit occupancy
Applies to: EV Charging Station Permit (City Electrical Permit)
- 1
Electrical Rough-In (if applicable)
Required only if new circuit wiring is enclosed before final; wiring, grounding, and component listing verified (City electrical inspector, not DOPL)
- 2
Electrical Final
EVSE breaker sizing, GFCI protection (where applicable), labeling, working clearances, and charger mounting verified against the 2023 NEC (City electrical inspector)
Applies to: Mechanical / HVAC Permit
- 1
HVAC (Mechanical) Rough-In & Gas Pressure Test
Made prior to covering or concealment, before framing inspection
- 2
HVAC (Mechanical) Final
All systems in place, fixtures set, ready for occupancy
Final inspection only: Demolition Permit, Short Term Rental Registration
Sources & verification
Verified against official sources. Last reviewed 2026-07-04.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rexburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Rexburg building permits
Get alerts for Rexburg
We'll email you when Rexburg's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.